Delta PG PLUS-25 warranty Electrical Panel Components

Page 72

Replacement Parts

Fig. 42: Electrical Panel Components

 

Item

 

Part No.

 

Description

 

 

 

 

 

 

 

 

 

12A

 

PGRKIT19

 

R1 Relay - Controls

 

 

 

 

Burner Function

 

 

 

 

 

 

 

 

12B

 

PGRKIT 19

 

R2 Relay - Controls

 

 

 

Domestic Priority & Circulator

 

 

 

 

 

 

 

13

 

PGRKIT18

 

120 V-24 V 40VA

 

 

 

 

Transformer

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Part No.

 

 

 

Description

 

 

 

 

HMRLV01

Pressure Relief Valve 30 psi

 

P3AVT01

Air Vent

 

 

 

HMVLV07

Thermostatic Mixing valve

3/4"

 

 

HNSNP02

Snap sets Male / Female

 

 

 

HMTPV01

Temperature/Pressure Relief Valve (PG PLUS-30/35/40/45 only)

 

HMTPV03

Temperature/Pressure Relief Valve (PG PLUS-25 only)

66

Image 72
Contents For Your Safety PG PLUS-25/30/35/40 Gas Fired Combination HeatersTable of Contents Section VI Vent / Combustion AIR Installation Section V Primary PipingSection Viii Internal Wiring Section IX External WiringSection VII GAS Piping Section X START-UP PreparationSection XI START-UP Procedures Section XII Temperature LimitsSection Xiii CHECK-OUT Procedures Section XIV Installation RecordSection Xvii Replacement Parts Product SpecificationsProduct & Safety Information To Protect Against Excessive Temperature and Pressure What to do if YOU Smell GAS Do not try to light any applianceHomeowner Operating Restrictions Pre-Installation Items Section I Pre-Installation Items Boiler ReplacementCode Compliance Determining Product LocationPre-Installation Items Residential Garage InstallationsCombustion Air and Venting Section II Combustion Air VentingMethods of Accessing Combustion Air Into a Space Combustion Air and VentingCombustion Air Requirements Air OpeningsOutdoor Combustion Air Equipment Located in Confined Spaces One Permanent Air InletCombination of Indoor and Outdoor Combustion Air Vent SystemRemoval of an Existing Boiler f rom a Common Vent System Hydrostatic Test Procedures Unit Preparation Section III Unit PreparationHandling Instructions Hydrostatic Pressure TestUnit Preparation Completion of Hydrostatic Test and DrainingDomestic Piping Section IV Domestic Piping Domestic Piping Multiple Units Installation Mixing Valve AssemblyDomestic Piping Diagrams TR/SMART Series ApplicationPerformance Plus With Recirculation Performance Plus with Storage Tank Primary Piping Section V Primary Piping Primary Piping Closet Zero Clearance ApplicationsSystem Piping Zone Circulators Sizing Primary PipingSystem Piping Radiant Heating with Mixing Valve Personal injury, death or substantial property damagePrimary Piping Near Appliance Piping Primary piping Zoning with Circulators Primary Piping Low Temperature Radiant System Primary Piping Venting and Combustion Air Installation Section VI Venting General RequirementsVenting and Combustion Air Installation Category IV Vent Termination ClearancesMultiple Vent Terminations Locating the Combustion Air InletVenting Option Non Direct Vent / Vertical Venting Option Direct Vent / Vertical Venting Option Non-Direct Vent / HorizontalVenting Option Direct Vent / Horizontal Horizontal Wall Thimble KitExcessive Horizontal Vent Runs Vent Appliance AdaptersDetermining Piping Lengths Allowable Equivalent Length Combined Vent and Combustion Air Standard Horizontal Venting Installation Location of Air Inlet Termination Venting and Combustion Air Installation Section VII Gas Piping Recommended Gas Supply PipingNatural GAS Pipe Sizing Natural GasNatural Gas Supply Pressure Requirements Propane GAS Pipe Sizing Propane GasPropane Gas Supply Pressure Requirements Internal Wiring Section Viii Internal Wiring Wiring must be N.E.C ClassInternal Wiring Factory Wiring SchematicFactory Internal Wiring External Wiring Section IX External Wiring Installation ComplianceOutdoor Temperature Limit Line Voltage ConnectionsExternal Wiring Multiple Zone Field Wiring Using Zone ValvesField wiring with zone circulators Typical Zone Relay Panel Wiring Section X Start Up Preparation Performance PlusFilling the Outer Primary Tank and System Check Low Water Cut-Off Device Verify Correct Pressure Switch Air Shutter SettingsCheck Thermostat Circuit Start-Up Procedures Final Checks Before Start-upPerformance Plus Start-up If Performance Plus Does Not Start CorrectlyFor Your Safety Read Before Lighting Following instructions must be followed exactly, a fire orOr loss of life Operating InstructionsNatural Gas Propane Temperature Limits Section XII Temperature Limits Recommended Secondary Thermostat SettingTemperature Limits Section XIII- Check-Out Procedures Section XIV Installation Record Section XV Maintenance Schedule Service TechnicianOwner Maintenance GeneralSection XVI Maintenance Procedures Check the Surrounding AreaInspect the Burner Area Check Combustion/ Ventilation Air Openings Inspect Vent System and Combustion Air PipingCheck Domestic System Check Expansion TankCheck Temperature / Pressure Relief Valve Check Ignition Wiring and Ground WiringCheck Control Wiring Check Thermostat Limit SettingsCheck Burner Flame Flame Signal Check Combustion LevelsReview With Owner Section Xvii Replacement Parts Jacket Components Control Panel Components Electrical Panel Components Burner Components Specifications Graph 1 Performance Plus Pressure Loss Primary Side TTP Brazed Plate Heat Exchangers Maxi-flo Pool and Spa Heat Exchangers