Hearth and Home Technologies CERONA-42 owner manual Mantel Projections, 724 425 406 279

Page 10

D. Mantel Projections

 

CEILING

 

 

 

 

 

A

 

 

 

 

 

1 in.

COMBUSTIBLE

 

 

 

 

TYPICAL

FACING MATERIAL

 

 

 

 

 

 

 

 

 

 

 

12"

 

 

 

 

 

 

11"

 

 

 

 

 

10"

 

FIREPLACE HEADER

 

9"

 

 

 

 

 

 

8"

 

E

 

 

 

 

7"

 

 

 

 

6"

 

 

MINIMUM

 

 

 

5"

 

FROM TOP OF ARCH

 

 

 

4"

 

 

 

 

 

OPENING TO CEILING

 

 

 

3"

 

 

 

 

2"

 

 

 

B

 

 

1"

 

 

 

 

 

 

 

 

 

NON-COMBUSTIBLE

 

 

 

 

 

 

FACING MATERIAL

 

C

 

D

 

 

 

 

 

MINIMUM

 

 

 

 

FROM TOP OF ARCH

 

 

 

OPENING TO FIRST

 

 

 

MANTEL PROJECTION

 

 

 

TOP OF ARCH OPENING

 

 

A

B

C

D

E

Cerona-36

in.

32-1/4

16-3/4

16

11

49

mm

819

425

406

279

1245

 

Cerona-42

in.

28-1/2

16-3/4

16

11

45-1/4

mm

724

425

406

279

1149

 

Figure 3.3 Clearances to mantels or other combustibles above appliance

COMBUSTIBLE

SHEATHING

CLEARANCE

 

TO CEILING

CEILING

 

 

B MINIMUM

A

NON-COMBUSTIBLE

FACING MATERIAL

IN SHADED AREAS

FIREPLACE

ARCH OPENING

1 in.

(25)

C

BOTTOM OF FIREPLACE

TO BOTTOM OF

NON-COMBUSTIBLE

FACING MATERIAL

 

 

A

B

C

Cerona-36

in.

49

16-3/4

43-5/8

mm

1245

425

1108

Cerona-42

in.

45-1/4

16-3/4

50-5/8

mm

1149

425

1286

Figure 3.5

TOP VIEW

MANTEL LEG OR WALL PROJECTIONS

INTERIOR WALL

B

Note: If using the Apollo Mantel System, the appliance must be raised 1-1/4 in. from floor.

A

If A minimum is _____, then B maximum is ______.

A

in.

1

2

3

4

5

6

7

8

9

10

11

12

 

 

 

 

 

 

 

 

 

 

 

 

 

mm

25

51

76

102

127

152

178

203

229

254

279

305

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

B

in.

1

2

3

4

5

6

7

8

9

10

11

12

 

 

 

 

 

 

 

 

 

 

 

 

 

mm

25

51

76

102

127

152

178

203

229

254

279

305

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Figure 3.4 Clearances to Mantel Legs or Wall Projections (Acceptable on both sides of opening.)

10

Heat & Glo • Cerona-36, Cerona-422106-900 Rev. H • 11/08

Image 10
Contents Models What to do if you smell gasHomeowner Reference Information Model Number Serial NumberTable of Contents Listing and Code Approvals Installation of Carbon Monoxide Detectors Requirements for the Commonwealth of MassachusettsTools and Supplies Needed Installation to ensure maximum safety and benefitGetting Started Read all of the instructions before starting the instaInspect Firebox Framing and Clearances Selecting Appliance LocationConstructing the Appliance Chase ClearancesMantel Projections 724 425 406 279Hearth Extension Dimensions Hearth ExtensionTermination Locations Vent Termination Minimum ClearancesAlcove Applications Minimum Clearances for TerminationTo Install the Heat Shield Install Support BracketsContinue Adding Vent Components Measuring Standards Vent Information and DiagramsVent Table Key Use of ElbowsTop Vent Horizontal Termination One Elbow Vent DiagramsTwo Elbows V1 = 50 ft. Max .2 m Top Vent Horizontal Termination Three ElbowsTop Vent Vertical Termination Straight up Vertical Venting 152 mm 914 mm 305 mm 610 mm 10 ftTop Vent Horizontal Termination Two Elbows 305 mm 610 mm 914 mm 10 ftWall Penetration Framing Vent Clearances and FramingPipe Clearances to Combustibles Combustible Wall PenetrationInstalling Attic Shield Installing the Ceiling FirestopVertical Penetration Framing Removing Non-combustible Facing Mate- rial Assembly Appliance PreparationInstalling Non-combustible Facing Material Securing and Leveling the ApplianceInstalling Flue Restrictors Complete Installation of Non-combustible Facing MaterialAttaching Vent to the Firebox Assembly Installing Vent PipeAssembly of Vent Sections Assembling Pipe SectionsAssembling Minimum Installations MI Sections Assembling DVP-12A Slip SectionsVertical Sections Disassembly of Vent SectionsSecuring the Vent Sections Horizontal SectionsHeat Shield Requirements for Horizontal Termination Installing Heat Shield and Horizontal Termination CapInstalling the Horizontal Termination Cap Heat shield DVP-HSM-B must be usedInstalling Roof Flashing and Vertical Ter- mination Cap flue of the pipe see FigureAssembling and Installing Storm Collar 18 Assembling the Storm Collar Around the PipeFuel Conversions Gas Connection Gas InformationGas Pressures High Altitude Installations Connecting to the Appliance Recommendation for WireIntellifire Ignition System Wiring Electrical InformationJunction Box Installation For units Without factory installed Rocker SwitchStep Finishing Facing Material Non-combustible Facing MaterialFinishing Material Thickness greater than 1-1/4 inch Finishing Material OptionsFinishing Material Thickness from 3/4 in. to 1-1/4 Mounting stone eye brow ATRIMSTONE-36, ATRIMSTONE-4210 Fireplace sitting on combustible surface Accessories Appliance SetupClean the Appliance Ember PlacementLog Assembly LOGS-Cerona36 Positioning the Logs Model Cerona-36Heat & Glo Cerona-36, Cerona-42 2106-900 Rev. H 11/08 Model Cerona-42 Step Air Shutter Setting Glass AssemblyGrilles and Trim Before Lighting Appliance Operating InstructionsThis appliance has an Intellifire ignition system Lighting Appliance IPI Ignition Final inspection byInitial Break-in Procedure Frequently Asked QuestionsAfter Appliance is Lit Intellifire Ignition System TroubleshootingSympton Possible Cause Corrective Action Symptom Possible Cause Corrective Action Maintenance Tasks Maintaining and Servicing ApplianceInspect Maintenance Tasks Doors, SurroundsReference Materials Appliance Dimension DiagramModel Cerona-36 Model Cerona-42 Vent Components Diagrams DVP vent componentsDVP-TRAP COOL-ADD Not for use with these models Service Parts Log Set AssemblyPart number list on following Stocked Service Parts ListAt Depot IPI Valve Assembly CERONA-42 LOGS-CERONA42 Touch UP Paint -Fiber boxIPI Valve Assembly CONDITIONS, Exclusions & Limitation of Liability Limited Lifetime Warranty Contact Information