Hearth and Home Technologies CERONA-42 Continue Adding Vent Components, Install Support Brackets

Page 14

B. Continue Adding Vent Components

WARNING

Fire Risk.

Installation of this appliance may require the use of heat shield 385-290 above the first 900 elbow in the venting system.

To Install the Heat Shield:

1.Determine if the heat shield is required. Do so by measuring the vertical distance between the top horizontal surface of the elbow to any combustible surface above. If the distance is more than 4 inches, the heat shield is NOT required. If it is 4 inches or less, the heat shield IS REQUIRED. Install per the following steps. See Figure 4.5.

COMBUSTIBLE

SURFACE

CORRECT

COMBUSTIBLE SURFACE

INCORRECT

 

 

DIRECTION

 

 

UP

 

 

HEAT SHIELD

 

 

90º ELBOW

 

Figure 4.6

 

 

If the combustible materials are not in place at the time of install the elbow heat shield may be screwed to the exhaust pipe (see Figure 4.7). Cut the tabs as shown and bend down. Secure the heat shield to the pipe maintaining 3 inch to 4 inch between the pipe and shield.

SCREW

HEAT

3” MIN. (76mm)

3 in.

(76 mm)

SHIELD

Figure 4.5

2.Fasten the shield in place using the four pilot holes provided in the part. The shield should be oriented such that the 13 1/8 inch dimension (longest dimension) is running in the same direction the elbow is pointing. The shield should be centered directly above the elbow, and positioned so that it creates a 1/2 inch airspace between the shield and the combustible surface. See Figure 4.6.

Figure 4.7

Refer to Cinch Pipe and Termination Cap installation in- structions.

Continue adding vent components, locking each succeeding component into place.

Ensure that each succeeding vent component is securely fitted and locked into the preceding component in the vent system.

90º elbows may be installed and rotated to any point around the preceding component’s vertical axis. If an elbow does not end up in a locked position with the preceding component, attach with a minimum of two (2) sheet metal screws.

C. Install Support Brackets

Refer to Cinch Pipe and Termination Cap installation in- structions.

14

Heat & Glo • Cerona-36, Cerona-422106-900 Rev. H • 11/08

Image 14
Contents Models What to do if you smell gasHomeowner Reference Information Model Number Serial NumberTable of Contents Listing and Code Approvals Installation of Carbon Monoxide Detectors Requirements for the Commonwealth of MassachusettsTools and Supplies Needed Installation to ensure maximum safety and benefitGetting Started Read all of the instructions before starting the instaInspect Firebox Framing and Clearances Selecting Appliance LocationConstructing the Appliance Chase ClearancesMantel Projections 724 425 406 279Hearth Extension Dimensions Hearth ExtensionTermination Locations Vent Termination Minimum ClearancesAlcove Applications Minimum Clearances for TerminationContinue Adding Vent Components Install Support BracketsTo Install the Heat Shield Measuring Standards Vent Information and DiagramsVent Table Key Use of ElbowsTwo Elbows Vent DiagramsTop Vent Horizontal Termination One Elbow V1 = 50 ft. Max .2 m Top Vent Horizontal Termination Three ElbowsTop Vent Vertical Termination Straight up Vertical Venting 152 mm 914 mm 305 mm 610 mm 10 ftTop Vent Horizontal Termination Two Elbows 305 mm 610 mm 914 mm 10 ftWall Penetration Framing Vent Clearances and FramingPipe Clearances to Combustibles Combustible Wall PenetrationVertical Penetration Framing Installing the Ceiling FirestopInstalling Attic Shield Removing Non-combustible Facing Mate- rial Assembly Appliance PreparationInstalling Non-combustible Facing Material Securing and Leveling the ApplianceInstalling Flue Restrictors Complete Installation of Non-combustible Facing MaterialAttaching Vent to the Firebox Assembly Installing Vent PipeAssembly of Vent Sections Assembling Pipe SectionsAssembling Minimum Installations MI Sections Assembling DVP-12A Slip SectionsVertical Sections Disassembly of Vent SectionsSecuring the Vent Sections Horizontal SectionsHeat Shield Requirements for Horizontal Termination Installing Heat Shield and Horizontal Termination CapInstalling the Horizontal Termination Cap Heat shield DVP-HSM-B must be usedInstalling Roof Flashing and Vertical Ter- mination Cap flue of the pipe see FigureAssembling and Installing Storm Collar 18 Assembling the Storm Collar Around the PipeGas Pressures Gas InformationFuel Conversions Gas Connection High Altitude Installations Connecting to the Appliance Recommendation for WireIntellifire Ignition System Wiring Electrical InformationJunction Box Installation For units Without factory installed Rocker SwitchStep Finishing Facing Material Non-combustible Facing MaterialFinishing Material Thickness greater than 1-1/4 inch Finishing Material OptionsFinishing Material Thickness from 3/4 in. to 1-1/4 Mounting stone eye brow ATRIMSTONE-36, ATRIMSTONE-4210 Fireplace sitting on combustible surface Accessories Appliance SetupClean the Appliance Ember PlacementLog Assembly LOGS-Cerona36 Positioning the Logs Model Cerona-36Heat & Glo Cerona-36, Cerona-42 2106-900 Rev. H 11/08 Model Cerona-42 Step Grilles and Trim Glass AssemblyAir Shutter Setting This appliance has an Intellifire ignition system Operating InstructionsBefore Lighting Appliance Lighting Appliance IPI Ignition Final inspection byAfter Appliance is Lit Frequently Asked QuestionsInitial Break-in Procedure Sympton Possible Cause Corrective Action TroubleshootingIntellifire Ignition System Symptom Possible Cause Corrective Action Maintenance Tasks Maintaining and Servicing ApplianceInspect Maintenance Tasks Doors, SurroundsModel Cerona-36 Model Cerona-42 Appliance Dimension DiagramReference Materials Vent Components Diagrams DVP vent componentsDVP-TRAP COOL-ADD Not for use with these models Part number list on following Log Set AssemblyService Parts At Depot Service Parts ListStocked IPI Valve Assembly CERONA-42 LOGS-CERONA42 Touch UP Paint -Fiber boxIPI Valve Assembly CONDITIONS, Exclusions & Limitation of Liability Limited Lifetime Warranty Contact Information