Hearth and Home Technologies CERONA-42 owner manual

Page 60

Service Parts

CERONA-42

 

 

Service Parts Diagram

Beginning Manufacturing Date: June 2006

 

Ending Manufacturing Date: ______

7

8

9

10

11

12

14

13

Log Set Assembly

 

 

 

1

 

6

3

2

 

 

5

 

4

 

 

 

 

 

Part number list on following page.

60

Heat & Glo • Cerona-36, Cerona-422106-900 Rev. H • 11/08

Image 60
Contents Models What to do if you smell gasHomeowner Reference Information Model Number Serial NumberTable of Contents Listing and Code Approvals Installation of Carbon Monoxide Detectors Requirements for the Commonwealth of MassachusettsInstallation to ensure maximum safety and benefit Getting StartedTools and Supplies Needed Read all of the instructions before starting the instaInspect Firebox Framing and Clearances Selecting Appliance LocationConstructing the Appliance Chase ClearancesMantel Projections 724 425 406 279Hearth Extension Dimensions Hearth ExtensionTermination Locations Vent Termination Minimum ClearancesAlcove Applications Minimum Clearances for TerminationInstall Support Brackets To Install the Heat ShieldContinue Adding Vent Components Vent Information and Diagrams Vent Table KeyMeasuring Standards Use of ElbowsVent Diagrams Top Vent Horizontal Termination One ElbowTwo Elbows Top Vent Horizontal Termination Three Elbows Top Vent Vertical Termination Straight up Vertical VentingV1 = 50 ft. Max .2 m 152 mm 914 mm 305 mm 610 mm 10 ftTop Vent Horizontal Termination Two Elbows 305 mm 610 mm 914 mm 10 ftVent Clearances and Framing Pipe Clearances to CombustiblesWall Penetration Framing Combustible Wall PenetrationInstalling the Ceiling Firestop Installing Attic ShieldVertical Penetration Framing Removing Non-combustible Facing Mate- rial Assembly Appliance PreparationInstalling Non-combustible Facing Material Securing and Leveling the ApplianceInstalling Flue Restrictors Complete Installation of Non-combustible Facing MaterialInstalling Vent Pipe Assembly of Vent SectionsAttaching Vent to the Firebox Assembly Assembling Pipe SectionsAssembling Minimum Installations MI Sections Assembling DVP-12A Slip SectionsDisassembly of Vent Sections Securing the Vent SectionsVertical Sections Horizontal SectionsInstalling Heat Shield and Horizontal Termination Cap Installing the Horizontal Termination CapHeat Shield Requirements for Horizontal Termination Heat shield DVP-HSM-B must be usedInstalling Roof Flashing and Vertical Ter- mination Cap flue of the pipe see FigureAssembling and Installing Storm Collar 18 Assembling the Storm Collar Around the PipeGas Information Fuel Conversions Gas ConnectionGas Pressures High Altitude Installations Recommendation for Wire Intellifire Ignition System WiringConnecting to the Appliance Electrical InformationJunction Box Installation For units Without factory installed Rocker SwitchStep Finishing Facing Material Non-combustible Facing MaterialFinishing Material Options Finishing Material Thickness from 3/4 in. to 1-1/4Finishing Material Thickness greater than 1-1/4 inch Mounting stone eye brow ATRIMSTONE-36, ATRIMSTONE-4210 Fireplace sitting on combustible surface Appliance Setup Clean the ApplianceAccessories Ember PlacementLog Assembly LOGS-Cerona36 Positioning the Logs Model Cerona-36Heat & Glo Cerona-36, Cerona-42 2106-900 Rev. H 11/08 Model Cerona-42 Step Glass Assembly Air Shutter SettingGrilles and Trim Operating Instructions Before Lighting ApplianceThis appliance has an Intellifire ignition system Lighting Appliance IPI Ignition Final inspection byFrequently Asked Questions Initial Break-in ProcedureAfter Appliance is Lit Troubleshooting Intellifire Ignition SystemSympton Possible Cause Corrective Action Symptom Possible Cause Corrective Action Maintenance Tasks Maintaining and Servicing ApplianceInspect Maintenance Tasks Doors, SurroundsAppliance Dimension Diagram Reference MaterialsModel Cerona-36 Model Cerona-42 Vent Components Diagrams DVP vent componentsDVP-TRAP COOL-ADD Not for use with these models Log Set Assembly Service PartsPart number list on following Service Parts List StockedAt Depot IPI Valve Assembly CERONA-42 LOGS-CERONA42 Touch UP Paint -Fiber boxIPI Valve Assembly CONDITIONS, Exclusions & Limitation of Liability Limited Lifetime Warranty Contact Information