Hearth and Home Technologies CERONA-42 owner manual Securing and Leveling the Appliance

Page 22

B. Securing and Leveling the Appliance

CAUTION

Sharp Edges

Wear protective gloves and safety glasses during installation.

WARNING

Fire Risk.

Prevent contact with sagging, loose insulation.

Do NOT install against combustible materials such as exposed insulation, plastic and insulation

backer.

The diagram shows (Figure 7.2) the location of the nailing tabs provided to secure the appliance to the framing members.

NAILING

TABS

Figure 7.2 Proper Positioning, Leveling and

Securing of a Appliance

Place the appliance into position.

Level the appliance from side to side and front to back.

Shim the appliance, as necessary. It is acceptable to use wood shims.

Bend out nailing tabs on each side.

Keep nailing tabs flush with the framing.

Secure the appliance to the framing by using nails or screws through the nailing tabs.

WARNING

Fire Risk.

• ALWAYS maintain specified

clearances around the appliance.

• Do NOT notch into the framing around the appliance spacers.

Failure to keep insulation, framing or other material away from the appliance may cause fire.

C. Installing Non-combustible Facing Material

WARNING

Fire Risk.

Follow these instructions exactly.

Facing materials must be installed properly to prevent fire.

• No materials may be substituted without authorization by Hearth & Home Technologies.

Center and attach top board to the framing members (see Figure 7.3).

Use fasteners from fastener packet (in manual bag) in shaded areas (Figure 7.3).

Use regular sheetrock screws in non-shaded areas (see Figure 7.3).

APPLY

FASTENERS FROM

FASTENER PACKET

IN SHADED AREAS

Figure 7.3 Attaching Non-combustible Facing Material

22

Heat & Glo • Cerona-36, Cerona-422106-900 Rev. H • 11/08

Image 22
Contents Models What to do if you smell gasHomeowner Reference Information Model Number Serial NumberTable of Contents Listing and Code Approvals Installation of Carbon Monoxide Detectors Requirements for the Commonwealth of MassachusettsTools and Supplies Needed Installation to ensure maximum safety and benefitGetting Started Read all of the instructions before starting the instaInspect Firebox Framing and Clearances Selecting Appliance LocationConstructing the Appliance Chase ClearancesMantel Projections 724 425 406 279Hearth Extension Dimensions Hearth ExtensionTermination Locations Vent Termination Minimum ClearancesAlcove Applications Minimum Clearances for TerminationTo Install the Heat Shield Install Support BracketsContinue Adding Vent Components Measuring Standards Vent Information and DiagramsVent Table Key Use of ElbowsTop Vent Horizontal Termination One Elbow Vent DiagramsTwo Elbows V1 = 50 ft. Max .2 m Top Vent Horizontal Termination Three ElbowsTop Vent Vertical Termination Straight up Vertical Venting 152 mm 914 mm 305 mm 610 mm 10 ftTop Vent Horizontal Termination Two Elbows 305 mm 610 mm 914 mm 10 ftWall Penetration Framing Vent Clearances and FramingPipe Clearances to Combustibles Combustible Wall PenetrationInstalling Attic Shield Installing the Ceiling FirestopVertical Penetration Framing Removing Non-combustible Facing Mate- rial Assembly Appliance PreparationInstalling Non-combustible Facing Material Securing and Leveling the ApplianceInstalling Flue Restrictors Complete Installation of Non-combustible Facing MaterialAttaching Vent to the Firebox Assembly Installing Vent PipeAssembly of Vent Sections Assembling Pipe SectionsAssembling Minimum Installations MI Sections Assembling DVP-12A Slip SectionsVertical Sections Disassembly of Vent SectionsSecuring the Vent Sections Horizontal SectionsHeat Shield Requirements for Horizontal Termination Installing Heat Shield and Horizontal Termination CapInstalling the Horizontal Termination Cap Heat shield DVP-HSM-B must be usedInstalling Roof Flashing and Vertical Ter- mination Cap flue of the pipe see FigureAssembling and Installing Storm Collar 18 Assembling the Storm Collar Around the PipeFuel Conversions Gas Connection Gas InformationGas Pressures High Altitude Installations Connecting to the Appliance Recommendation for WireIntellifire Ignition System Wiring Electrical InformationJunction Box Installation For units Without factory installed Rocker SwitchStep Finishing Facing Material Non-combustible Facing MaterialFinishing Material Thickness greater than 1-1/4 inch Finishing Material OptionsFinishing Material Thickness from 3/4 in. to 1-1/4 Mounting stone eye brow ATRIMSTONE-36, ATRIMSTONE-4210 Fireplace sitting on combustible surface Accessories Appliance SetupClean the Appliance Ember PlacementLog Assembly LOGS-Cerona36 Positioning the Logs Model Cerona-36Heat & Glo Cerona-36, Cerona-42 2106-900 Rev. H 11/08 Model Cerona-42 Step Air Shutter Setting Glass AssemblyGrilles and Trim Before Lighting Appliance Operating InstructionsThis appliance has an Intellifire ignition system Lighting Appliance IPI Ignition Final inspection byInitial Break-in Procedure Frequently Asked QuestionsAfter Appliance is Lit Intellifire Ignition System TroubleshootingSympton Possible Cause Corrective Action Symptom Possible Cause Corrective Action Maintenance Tasks Maintaining and Servicing ApplianceInspect Maintenance Tasks Doors, SurroundsReference Materials Appliance Dimension DiagramModel Cerona-36 Model Cerona-42 Vent Components Diagrams DVP vent componentsDVP-TRAP COOL-ADD Not for use with these models Service Parts Log Set AssemblyPart number list on following Stocked Service Parts ListAt Depot IPI Valve Assembly CERONA-42 LOGS-CERONA42 Touch UP Paint -Fiber boxIPI Valve Assembly CONDITIONS, Exclusions & Limitation of Liability Limited Lifetime Warranty Contact Information