Hearth and Home Technologies CERONA-42 owner manual IPI Valve Assembly

Page 59

Service Parts

CERONA-36

 

 

Valve Assembly Diagram/ Parts List

Beginning Manufacturing Date: June 2006

 

Ending Manufacturing Date: ______

IPI Valve Assembly

 

1

 

13

 

 

 

 

 

 

2

 

 

 

 

 

3

12

 

 

 

4

 

 

 

 

 

 

 

5

 

6

 

 

 

 

8

7

 

 

 

9

 

 

 

 

 

10

 

 

11

 

 

 

 

IMPORTANT: THIS IS DATED INFORMATION. When requesting service or replacement

 

Stocked

parts for your appliance please provide model number and serial number. All parts listed

 

in this manual may be ordered from an authorized dealer.

 

 

at Depot

ITEM

DESCRIPTION

COMMENTS

PART NUMBER

 

1

Pilot Bracket

 

2106-135

 

2

Pilot Assembly NG

 

2106-009

Y

Pilot Assembly LP

 

2106-008

Y

 

 

3

Shutter Bracket Assembly (NG)

 

2106-010

 

Shutter Bracket Assembly (LP)

 

2106-071

 

 

 

 

4

Shutter Sleeve

 

2026-130

Y

5

Collar 4”

 

2081-140

 

6

Flex Ball Valve Assembly

 

302-320A

Y

7

Module Wire Assembly

 

593-590A

Y

8

Battery Pack

 

593-594A

Y

9

Module

 

593-592

Y

10

Valve NG

 

750-500

Y

Valve LP

 

750-501

Y

 

 

11

Valve Bracket

 

2106-107

 

12

Flexible Gas Connector

 

530-302A

Y

13

Orifice NG (#32)

 

582-832

Y

Orifice LP (#50)

 

582-850

Y

 

 

Heat & Glo • Cerona-36, Cerona-422106-900 Rev. H • 11/08

59

Image 59
Contents What to do if you smell gas ModelsModel Number Serial Number Homeowner Reference InformationTable of Contents Listing and Code Approvals Requirements for the Commonwealth of Massachusetts Installation of Carbon Monoxide DetectorsRead all of the instructions before starting the insta Installation to ensure maximum safety and benefitGetting Started Tools and Supplies NeededInspect Firebox Selecting Appliance Location Framing and ClearancesClearances Constructing the Appliance Chase724 425 406 279 Mantel ProjectionsHearth Extension Hearth Extension DimensionsVent Termination Minimum Clearances Termination LocationsMinimum Clearances for Termination Alcove ApplicationsContinue Adding Vent Components Install Support BracketsTo Install the Heat Shield Use of Elbows Vent Information and DiagramsVent Table Key Measuring StandardsTwo Elbows Vent DiagramsTop Vent Horizontal Termination One Elbow 152 mm 914 mm 305 mm 610 mm 10 ft Top Vent Horizontal Termination Three ElbowsTop Vent Vertical Termination Straight up Vertical Venting V1 = 50 ft. Max .2 m305 mm 610 mm 914 mm 10 ft Top Vent Horizontal Termination Two ElbowsCombustible Wall Penetration Vent Clearances and FramingPipe Clearances to Combustibles Wall Penetration FramingVertical Penetration Framing Installing the Ceiling FirestopInstalling Attic Shield Appliance Preparation Removing Non-combustible Facing Mate- rial AssemblySecuring and Leveling the Appliance Installing Non-combustible Facing MaterialComplete Installation of Non-combustible Facing Material Installing Flue RestrictorsAssembling Pipe Sections Installing Vent PipeAssembly of Vent Sections Attaching Vent to the Firebox AssemblyAssembling DVP-12A Slip Sections Assembling Minimum Installations MI SectionsHorizontal Sections Disassembly of Vent SectionsSecuring the Vent Sections Vertical SectionsHeat shield DVP-HSM-B must be used Installing Heat Shield and Horizontal Termination CapInstalling the Horizontal Termination Cap Heat Shield Requirements for Horizontal Terminationflue of the pipe see Figure Installing Roof Flashing and Vertical Ter- mination Cap18 Assembling the Storm Collar Around the Pipe Assembling and Installing Storm CollarGas Pressures Gas InformationFuel Conversions Gas Connection High Altitude Installations Electrical Information Recommendation for WireIntellifire Ignition System Wiring Connecting to the ApplianceFor units Without factory installed Rocker Switch Junction Box InstallationStep Finishing Non-combustible Facing Material Facing MaterialMounting stone eye brow ATRIMSTONE-36, ATRIMSTONE-42 Finishing Material OptionsFinishing Material Thickness from 3/4 in. to 1-1/4 Finishing Material Thickness greater than 1-1/4 inch10 Fireplace sitting on combustible surface Ember Placement Appliance SetupClean the Appliance AccessoriesPositioning the Logs Model Cerona-36 Log Assembly LOGS-Cerona36Heat & Glo Cerona-36, Cerona-42 2106-900 Rev. H 11/08 Model Cerona-42 Step Grilles and Trim Glass AssemblyAir Shutter Setting This appliance has an Intellifire ignition system Operating InstructionsBefore Lighting Appliance Final inspection by Lighting Appliance IPI IgnitionAfter Appliance is Lit Frequently Asked QuestionsInitial Break-in Procedure Sympton Possible Cause Corrective Action TroubleshootingIntellifire Ignition System Symptom Possible Cause Corrective Action Maintaining and Servicing Appliance Maintenance TasksDoors, Surrounds Inspect Maintenance TasksModel Cerona-36 Model Cerona-42 Appliance Dimension DiagramReference Materials DVP vent components Vent Components DiagramsDVP-TRAP COOL-ADD Not for use with these models Part number list on following Log Set AssemblyService Parts At Depot Service Parts ListStocked IPI Valve Assembly CERONA-42 Touch UP Paint -Fiber box LOGS-CERONA42IPI Valve Assembly CONDITIONS, Exclusions & Limitation of Liability Limited Lifetime Warranty Contact Information