Hearth and Home Technologies CERONA-42 owner manual Top Vent Horizontal Termination Two Elbows

Page 18

2. Top Vent - Horizontal Termination

- (continued)

 

 

 

 

 

Two Elbows

V1 Minimum

H1 Maximum

Cerona-36 ONLY 1/2 ft

152 mm

2 ft

 

610 mm

 

 

 

1 ft

305 mm

2 ft

 

610 mm

 

2 ft

610 mm

5 ft

 

1.5 m

 

3 ft

914 mm

8 ft

 

2.4 m

 

4 ft

 

1.2 m

11 ft

 

3.4 m

V2

5 ft

 

1.5 m

14 ft

 

4.3 m

6 ft

 

1.8 m

17 ft

 

5.2 m

 

7 ft

 

2.1 m

20 ft

 

6.1 m

 

8 ft

 

2.4 m

23 ft

 

7.0 m

 

H1

= 23 ft. (7.0 m) Maximum

 

V1 + V2+ H1 = 63 ft. (19.2 m) Maximum

H1

V1

 

 

 

 

 

Note: Must have

Minimal Vertical Vent

 

 

a minimum verti-

Model

 

ft.

mm

 

cal vent before

 

 

Cerona-36

1/2

152

 

attaching a 90º

 

elbow to the unit.

Cerona-42

1

305

 

See chart.

 

 

 

 

 

Figure 5.7

Three Elbows

V2

H1

H2

INSTALLED

HORIZONTALLY

 

 

 

V1 Minimum

 

H1 Maximum

Cerona-36 ONLY

1/2 ft

152 mm

 

3 ft

 

 

914 mm

 

 

 

1 ft

305 mm

 

4 ft

 

 

1.2 m

 

 

 

2 ft

610 mm

 

7 ft

 

 

2.1 m

 

 

 

3 ft

914 mm

 

10 ft

 

 

 

3.0 m

 

 

 

4 ft

1.2 m

 

13

 

 

4.0 m

 

 

 

5 ft

1.5 m

 

16

 

 

4.9 m

 

 

 

6 ft

1.8 m

 

17

 

 

5.2 m

 

 

 

7 ft

2.1 m

 

22

 

 

6.7 m

 

 

 

H1

+ H2

= 22 ft. (6.7 m) Max.

 

 

 

V1+ V2 + H1 + H2 = 62 ft. (18.9 m) Max.

 

 

 

 

 

 

 

 

Note: Must have

Minimal Vertical Vent

 

 

a minimum verti-

Model

 

 

ft.

 

mm

 

 

cal vent before

 

 

 

 

 

Cerona-36

 

1/2

 

152

 

 

attaching a 90º

 

 

 

 

elbow to the unit.

Cerona-42

 

1

 

 

305

 

 

See chart.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

V1

 

 

 

 

 

 

 

 

 

 

Figure 5.8

18

Heat & Glo • Cerona-36, Cerona-422106-900 Rev. H • 11/08

Image 18
Contents Models What to do if you smell gasHomeowner Reference Information Model Number Serial NumberTable of Contents Listing and Code Approvals Installation of Carbon Monoxide Detectors Requirements for the Commonwealth of MassachusettsTools and Supplies Needed Installation to ensure maximum safety and benefitGetting Started Read all of the instructions before starting the instaInspect Firebox Framing and Clearances Selecting Appliance LocationConstructing the Appliance Chase ClearancesMantel Projections 724 425 406 279Hearth Extension Dimensions Hearth ExtensionTermination Locations Vent Termination Minimum ClearancesAlcove Applications Minimum Clearances for TerminationInstall Support Brackets To Install the Heat ShieldContinue Adding Vent Components Measuring Standards Vent Information and Diagrams Vent Table Key Use of ElbowsVent Diagrams Top Vent Horizontal Termination One ElbowTwo Elbows V1 = 50 ft. Max .2 m Top Vent Horizontal Termination Three ElbowsTop Vent Vertical Termination Straight up Vertical Venting 152 mm 914 mm 305 mm 610 mm 10 ftTop Vent Horizontal Termination Two Elbows 305 mm 610 mm 914 mm 10 ftWall Penetration Framing Vent Clearances and FramingPipe Clearances to Combustibles Combustible Wall PenetrationInstalling the Ceiling Firestop Installing Attic ShieldVertical Penetration Framing Removing Non-combustible Facing Mate- rial Assembly Appliance PreparationInstalling Non-combustible Facing Material Securing and Leveling the ApplianceInstalling Flue Restrictors Complete Installation of Non-combustible Facing MaterialAttaching Vent to the Firebox Assembly Installing Vent PipeAssembly of Vent Sections Assembling Pipe SectionsAssembling Minimum Installations MI Sections Assembling DVP-12A Slip SectionsVertical Sections Disassembly of Vent SectionsSecuring the Vent Sections Horizontal SectionsHeat Shield Requirements for Horizontal Termination Installing Heat Shield and Horizontal Termination CapInstalling the Horizontal Termination Cap Heat shield DVP-HSM-B must be usedInstalling Roof Flashing and Vertical Ter- mination Cap flue of the pipe see FigureAssembling and Installing Storm Collar 18 Assembling the Storm Collar Around the PipeGas Information Fuel Conversions Gas ConnectionGas Pressures High Altitude Installations Connecting to the Appliance Recommendation for WireIntellifire Ignition System Wiring Electrical InformationJunction Box Installation For units Without factory installed Rocker SwitchStep Finishing Facing Material Non-combustible Facing MaterialFinishing Material Thickness greater than 1-1/4 inch Finishing Material OptionsFinishing Material Thickness from 3/4 in. to 1-1/4 Mounting stone eye brow ATRIMSTONE-36, ATRIMSTONE-4210 Fireplace sitting on combustible surface Accessories Appliance SetupClean the Appliance Ember PlacementLog Assembly LOGS-Cerona36 Positioning the Logs Model Cerona-36Heat & Glo Cerona-36, Cerona-42 2106-900 Rev. H 11/08 Model Cerona-42 Step Glass Assembly Air Shutter SettingGrilles and Trim Operating Instructions Before Lighting ApplianceThis appliance has an Intellifire ignition system Lighting Appliance IPI Ignition Final inspection byFrequently Asked Questions Initial Break-in ProcedureAfter Appliance is Lit Troubleshooting Intellifire Ignition SystemSympton Possible Cause Corrective Action Symptom Possible Cause Corrective Action Maintenance Tasks Maintaining and Servicing ApplianceInspect Maintenance Tasks Doors, SurroundsAppliance Dimension Diagram Reference MaterialsModel Cerona-36 Model Cerona-42 Vent Components Diagrams DVP vent componentsDVP-TRAP COOL-ADD Not for use with these models Log Set Assembly Service PartsPart number list on following Service Parts List StockedAt Depot IPI Valve Assembly CERONA-42 LOGS-CERONA42 Touch UP Paint -Fiber boxIPI Valve Assembly CONDITIONS, Exclusions & Limitation of Liability Limited Lifetime Warranty Contact Information