5 Vent Information and Diagrams

A. Vent Table Key

The abbreviations listed in this vent table key are used in the vent diagrams.

Symbol

Description

V1

First section (closest to appliance) of vertical length

 

 

V2

Second section of vertical length

 

 

H1

First section (closest to appliance) of horizontal length

 

 

H2

Second section of horizontal length

 

 

Vertical

-8 in.1/2

8-1/2 in.

WARNING

Horizontal

Fire Hazard.

 

Explosion Risk.

Figure 5.1

Asphyxiation Risk.

 

Do NOT connect this gas appliance to a chimney

C. Measuring Standards

flue serving a separate solid-fuel or gas burning

appliance.

Vertical and horizontal measurements listed in the vent

• Vent this appliance directly outside.

diagrams were made using the following standards.

• Use separate vent system for this appliance.

1. Pipe measurements are shown using the effective length

May impair safe operation of this appliance or

of pipe (see Figure 5.2).

other appliances connected to the flue.

 

2. Measurements are made from the appliance outer wrap,

B. Use of Elbows

not from the standoffs.

3. Horizontal terminations are measured to the outside

 

CAUTION

mounting surface (flange of termination cap) (see

Figure 4.1).

ALL vent configuration specifications MUST be followed.

4. Vertical terminations are measured to bottom of termi-

nation cap.

• This product is tested and listed to these specifications.

5. Horizontal pipe installed level with no rise.

• Appliance performance will suffer if specifications are not

followed.

 

Diagonal runs have both vertical and horizontal vent as-

 

Pipe

Effective Length

 

Inches

Millimeters

 

 

pects when calculating the effects. Use the rise for the

 

DVP4

4

102

vertical aspect and the run for the horizontal aspect (see

 

DVP6

6

152

Figure 5.1).

Effective

DVP12

12

305

Two 45º elbows may be used in place of one 90º elbow. On

Height/Length

DVP24

24

610

 

 

DVP36

36

914

45º runs, one foot of diagonal is equal to 8.5 inches hori-

 

 

DVP48

48

1219

zontal run and 8.5 inches vertical run. A length of straight

 

 

DVP6A

3 to 6 76 to 152

pipe is allowed between two 45º elbows (see Figure 5.1).

 

 

DVP12A

3 to 12

76 to 305

 

 

 

 

DVP12MI

3 to 12

76 to 305

 

 

DVP24MI

3 to 24

76 to 610

 

Figure 5.2 DVP Pipe Effective Length

 

 

Heat & Glo • Cerona-36, Cerona-422106-900 Rev. H • 11/08

 

 

15

Image 15
Contents What to do if you smell gas ModelsModel Number Serial Number Homeowner Reference InformationTable of Contents Listing and Code Approvals Requirements for the Commonwealth of Massachusetts Installation of Carbon Monoxide DetectorsRead all of the instructions before starting the insta Installation to ensure maximum safety and benefitGetting Started Tools and Supplies NeededInspect Firebox Selecting Appliance Location Framing and ClearancesClearances Constructing the Appliance Chase724 425 406 279 Mantel ProjectionsHearth Extension Hearth Extension DimensionsVent Termination Minimum Clearances Termination LocationsMinimum Clearances for Termination Alcove ApplicationsInstall Support Brackets To Install the Heat ShieldContinue Adding Vent Components Use of Elbows Vent Information and DiagramsVent Table Key Measuring StandardsVent Diagrams Top Vent Horizontal Termination One ElbowTwo Elbows 152 mm 914 mm 305 mm 610 mm 10 ft Top Vent Horizontal Termination Three ElbowsTop Vent Vertical Termination Straight up Vertical Venting V1 = 50 ft. Max .2 m305 mm 610 mm 914 mm 10 ft Top Vent Horizontal Termination Two ElbowsCombustible Wall Penetration Vent Clearances and FramingPipe Clearances to Combustibles Wall Penetration FramingInstalling the Ceiling Firestop Installing Attic ShieldVertical Penetration Framing Appliance Preparation Removing Non-combustible Facing Mate- rial AssemblySecuring and Leveling the Appliance Installing Non-combustible Facing MaterialComplete Installation of Non-combustible Facing Material Installing Flue RestrictorsAssembling Pipe Sections Installing Vent PipeAssembly of Vent Sections Attaching Vent to the Firebox AssemblyAssembling DVP-12A Slip Sections Assembling Minimum Installations MI SectionsHorizontal Sections Disassembly of Vent SectionsSecuring the Vent Sections Vertical SectionsHeat shield DVP-HSM-B must be used Installing Heat Shield and Horizontal Termination CapInstalling the Horizontal Termination Cap Heat Shield Requirements for Horizontal Terminationflue of the pipe see Figure Installing Roof Flashing and Vertical Ter- mination Cap18 Assembling the Storm Collar Around the Pipe Assembling and Installing Storm CollarGas Information Fuel Conversions Gas ConnectionGas Pressures High Altitude Installations Electrical Information Recommendation for WireIntellifire Ignition System Wiring Connecting to the ApplianceFor units Without factory installed Rocker Switch Junction Box InstallationStep Finishing Non-combustible Facing Material Facing MaterialMounting stone eye brow ATRIMSTONE-36, ATRIMSTONE-42 Finishing Material OptionsFinishing Material Thickness from 3/4 in. to 1-1/4 Finishing Material Thickness greater than 1-1/4 inch10 Fireplace sitting on combustible surface Ember Placement Appliance SetupClean the Appliance AccessoriesPositioning the Logs Model Cerona-36 Log Assembly LOGS-Cerona36Heat & Glo Cerona-36, Cerona-42 2106-900 Rev. H 11/08 Model Cerona-42 Step Glass Assembly Air Shutter SettingGrilles and Trim Operating Instructions Before Lighting ApplianceThis appliance has an Intellifire ignition system Final inspection by Lighting Appliance IPI IgnitionFrequently Asked Questions Initial Break-in ProcedureAfter Appliance is Lit Troubleshooting Intellifire Ignition SystemSympton Possible Cause Corrective Action Symptom Possible Cause Corrective Action Maintaining and Servicing Appliance Maintenance TasksDoors, Surrounds Inspect Maintenance TasksAppliance Dimension Diagram Reference MaterialsModel Cerona-36 Model Cerona-42 DVP vent components Vent Components DiagramsDVP-TRAP COOL-ADD Not for use with these models Log Set Assembly Service PartsPart number list on following Service Parts List StockedAt Depot IPI Valve Assembly CERONA-42 Touch UP Paint -Fiber box LOGS-CERONA42IPI Valve Assembly CONDITIONS, Exclusions & Limitation of Liability Limited Lifetime Warranty Contact Information