Hearth and Home Technologies CERONA-42 Appliance Setup, Remove Shipping Materials, Accessories

Page 39

12 Appliance Setup

A. Remove Shipping Materials

Remove shipping materials from inside or underneath the firebox.

B. Clean the Appliance

Clean/vacuum any sawdust that may have accumulated inside the firebox or underneath in the control cavity.

C. Accessories

Install approved accessories per instructions included with accessories. See Service Parts List for appropriate accessories. Refer to Section 16.

HEAT-ZONE/HEAT-DUCT

KNOCKOUT

Figure 12.1

D. Ember Placement

WARNING

Explosion Risk.

Follow ember placement instructions in manual.

Do NOT place embers directly over burner ports.

Replace ember material annually.

Improperly placed embers interferes with proper burner operation.

Placing the Ember Material

Ember material is shipped with this gas appliance. To place the ember material:

There are two types of ember shipped with the unit. Embers for the burner surface and Mystic Embers for the floor of the unit.

Embers CANNOT be placed directly over ports. Care should be taken not to cover the lighting trail of ports (from back to front).

When placing Glowing Embers® onto the burner care should be taken so that the ports are not covered. Place the dime-size ember pieces in front and behind of the port trail, but not on or in between the ports (see Figure 12.2). Failure to follow procedure will likely cause lighting and sooting problems.

Heat-Zone/Heat-Duct Kits

Remove the knockout from the sides of the appliance and discard it (see Figure 12.1).

Note: Center the duct collar around the exposed hole and attach it to the appliance with 3 screws BEFORE final positioning of the appliance.

Heat-Zone:Determine the location for the air register/fan housing assembly.

Heat-Duct:Determine the location of the entry in the air duct system.

Reference the Heat-Zone/Heat-Duct Kit instructions for the remaining installation steps.

WARNING

Shock or fire risk.

Use ONLY optional accessories approved for this appliance.

Using non-listed accessories voids warranty.

Using non-listed accessories may result in a safety hazard.

Only Hearth & Home Technologies approved

accessories may be used safely.

EMBER PLACEMENT

Figure 12.2 Placement of Embers

Place Mystic Embers on areas of base refractory away from port holes. Use this material to give the appliance a realistic ash bed.

Save the remaining ember materials for use during appliance servicing. The embers provided should be enough for 3 to 5 applications.

Heat & Glo • Cerona-36, Cerona-422106-900 Rev. H • 11/08

39

Image 39
Contents What to do if you smell gas ModelsModel Number Serial Number Homeowner Reference InformationTable of Contents Listing and Code Approvals Requirements for the Commonwealth of Massachusetts Installation of Carbon Monoxide DetectorsRead all of the instructions before starting the insta Installation to ensure maximum safety and benefitGetting Started Tools and Supplies NeededInspect Firebox Selecting Appliance Location Framing and ClearancesClearances Constructing the Appliance Chase724 425 406 279 Mantel ProjectionsHearth Extension Hearth Extension DimensionsVent Termination Minimum Clearances Termination LocationsMinimum Clearances for Termination Alcove ApplicationsInstall Support Brackets To Install the Heat ShieldContinue Adding Vent Components Use of Elbows Vent Information and DiagramsVent Table Key Measuring StandardsVent Diagrams Top Vent Horizontal Termination One ElbowTwo Elbows 152 mm 914 mm 305 mm 610 mm 10 ft Top Vent Horizontal Termination Three ElbowsTop Vent Vertical Termination Straight up Vertical Venting V1 = 50 ft. Max .2 m305 mm 610 mm 914 mm 10 ft Top Vent Horizontal Termination Two ElbowsCombustible Wall Penetration Vent Clearances and FramingPipe Clearances to Combustibles Wall Penetration FramingInstalling the Ceiling Firestop Installing Attic ShieldVertical Penetration Framing Appliance Preparation Removing Non-combustible Facing Mate- rial AssemblySecuring and Leveling the Appliance Installing Non-combustible Facing MaterialComplete Installation of Non-combustible Facing Material Installing Flue RestrictorsAssembling Pipe Sections Installing Vent PipeAssembly of Vent Sections Attaching Vent to the Firebox AssemblyAssembling DVP-12A Slip Sections Assembling Minimum Installations MI SectionsHorizontal Sections Disassembly of Vent SectionsSecuring the Vent Sections Vertical SectionsHeat shield DVP-HSM-B must be used Installing Heat Shield and Horizontal Termination CapInstalling the Horizontal Termination Cap Heat Shield Requirements for Horizontal Terminationflue of the pipe see Figure Installing Roof Flashing and Vertical Ter- mination Cap18 Assembling the Storm Collar Around the Pipe Assembling and Installing Storm CollarGas Information Fuel Conversions Gas ConnectionGas Pressures High Altitude Installations Electrical Information Recommendation for WireIntellifire Ignition System Wiring Connecting to the ApplianceFor units Without factory installed Rocker Switch Junction Box InstallationStep Finishing Non-combustible Facing Material Facing MaterialMounting stone eye brow ATRIMSTONE-36, ATRIMSTONE-42 Finishing Material OptionsFinishing Material Thickness from 3/4 in. to 1-1/4 Finishing Material Thickness greater than 1-1/4 inch10 Fireplace sitting on combustible surface Ember Placement Appliance SetupClean the Appliance AccessoriesPositioning the Logs Model Cerona-36 Log Assembly LOGS-Cerona36Heat & Glo Cerona-36, Cerona-42 2106-900 Rev. H 11/08 Model Cerona-42 Step Glass Assembly Air Shutter SettingGrilles and Trim Operating Instructions Before Lighting ApplianceThis appliance has an Intellifire ignition system Final inspection by Lighting Appliance IPI IgnitionFrequently Asked Questions Initial Break-in ProcedureAfter Appliance is Lit Troubleshooting Intellifire Ignition SystemSympton Possible Cause Corrective Action Symptom Possible Cause Corrective Action Maintaining and Servicing Appliance Maintenance TasksDoors, Surrounds Inspect Maintenance TasksAppliance Dimension Diagram Reference MaterialsModel Cerona-36 Model Cerona-42 DVP vent components Vent Components DiagramsDVP-TRAP COOL-ADD Not for use with these models Log Set Assembly Service PartsPart number list on following Service Parts List StockedAt Depot IPI Valve Assembly CERONA-42 Touch UP Paint -Fiber box LOGS-CERONA42IPI Valve Assembly CONDITIONS, Exclusions & Limitation of Liability Limited Lifetime Warranty Contact Information