D. Inspect Firebox

Surface cracking or crazing of firebrick material is normal and expected. The following types of cracks are acceptable and do not require replacement of the unit or the firebox:

Cracks that do not propagate entirely thru the material.

Light fracture lines or “spider-webbing” on the surface of the material.

Cracks that are less than 1/32 in. wide and less than 3 in. long.

If cosmetically unacceptable, such cracks may be repaired with the SRV-PACK service kit. See Service Parts List.

Cracks that are unacceptable:

Cracks greater than 1/32 in. wide and 3 in. long are at risk of growing.

Cracks that penetrate entirely through the firebrick material.

Inspection for cracking should be run when the appliance is cool. Cracks tend to close as the appliance heats up.

Heat & Glo • Cerona-36, Cerona-422106-900 Rev. H • 11/08

7

Image 7
Contents What to do if you smell gas ModelsModel Number Serial Number Homeowner Reference InformationTable of Contents Listing and Code Approvals Requirements for the Commonwealth of Massachusetts Installation of Carbon Monoxide DetectorsRead all of the instructions before starting the insta Installation to ensure maximum safety and benefitGetting Started Tools and Supplies NeededInspect Firebox Selecting Appliance Location Framing and ClearancesClearances Constructing the Appliance Chase724 425 406 279 Mantel ProjectionsHearth Extension Hearth Extension DimensionsVent Termination Minimum Clearances Termination LocationsMinimum Clearances for Termination Alcove ApplicationsTo Install the Heat Shield Install Support BracketsContinue Adding Vent Components Use of Elbows Vent Information and DiagramsVent Table Key Measuring StandardsTop Vent Horizontal Termination One Elbow Vent DiagramsTwo Elbows 152 mm 914 mm 305 mm 610 mm 10 ft Top Vent Horizontal Termination Three ElbowsTop Vent Vertical Termination Straight up Vertical Venting V1 = 50 ft. Max .2 m305 mm 610 mm 914 mm 10 ft Top Vent Horizontal Termination Two ElbowsCombustible Wall Penetration Vent Clearances and FramingPipe Clearances to Combustibles Wall Penetration FramingInstalling Attic Shield Installing the Ceiling FirestopVertical Penetration Framing Appliance Preparation Removing Non-combustible Facing Mate- rial AssemblySecuring and Leveling the Appliance Installing Non-combustible Facing MaterialComplete Installation of Non-combustible Facing Material Installing Flue RestrictorsAssembling Pipe Sections Installing Vent PipeAssembly of Vent Sections Attaching Vent to the Firebox AssemblyAssembling DVP-12A Slip Sections Assembling Minimum Installations MI SectionsHorizontal Sections Disassembly of Vent SectionsSecuring the Vent Sections Vertical SectionsHeat shield DVP-HSM-B must be used Installing Heat Shield and Horizontal Termination CapInstalling the Horizontal Termination Cap Heat Shield Requirements for Horizontal Terminationflue of the pipe see Figure Installing Roof Flashing and Vertical Ter- mination Cap18 Assembling the Storm Collar Around the Pipe Assembling and Installing Storm CollarFuel Conversions Gas Connection Gas InformationGas Pressures High Altitude Installations Electrical Information Recommendation for WireIntellifire Ignition System Wiring Connecting to the ApplianceFor units Without factory installed Rocker Switch Junction Box InstallationStep Finishing Non-combustible Facing Material Facing MaterialMounting stone eye brow ATRIMSTONE-36, ATRIMSTONE-42 Finishing Material OptionsFinishing Material Thickness from 3/4 in. to 1-1/4 Finishing Material Thickness greater than 1-1/4 inch10 Fireplace sitting on combustible surface Ember Placement Appliance SetupClean the Appliance AccessoriesPositioning the Logs Model Cerona-36 Log Assembly LOGS-Cerona36Heat & Glo Cerona-36, Cerona-42 2106-900 Rev. H 11/08 Model Cerona-42 Step Air Shutter Setting Glass AssemblyGrilles and Trim Before Lighting Appliance Operating InstructionsThis appliance has an Intellifire ignition system Final inspection by Lighting Appliance IPI IgnitionInitial Break-in Procedure Frequently Asked QuestionsAfter Appliance is Lit Intellifire Ignition System TroubleshootingSympton Possible Cause Corrective Action Symptom Possible Cause Corrective Action Maintaining and Servicing Appliance Maintenance TasksDoors, Surrounds Inspect Maintenance TasksReference Materials Appliance Dimension DiagramModel Cerona-36 Model Cerona-42 DVP vent components Vent Components DiagramsDVP-TRAP COOL-ADD Not for use with these models Service Parts Log Set AssemblyPart number list on following Stocked Service Parts ListAt Depot IPI Valve Assembly CERONA-42 Touch UP Paint -Fiber box LOGS-CERONA42IPI Valve Assembly CONDITIONS, Exclusions & Limitation of Liability Limited Lifetime Warranty Contact Information