Hearth and Home Technologies QV32B-A Termination Locations, Vent Termination Minimum Clearances

Page 20

6 Termination Locations

A. Vent Termination Minimum Clearances

WARNING

Fire Risk.

Maintain vent clearance to combustibles as specified.

DO NOT pack air space with insulation or other materials.

Failure to keep insulation or other materials away from vent pipe may cause overheating and fire.

 

 

HORIZONTAL

 

 

OVERHANG

2 FT.

20 INCHES MIN.

VERTICAL

MIN.

 

 

WALL

 

LOWEST

 

 

 

DISCHARGE

 

 

OPENING

 

GAS DIRECT VENT

 

 

TERMINATION CAP

 

 

 

 

X

 

 

12

 

 

ROOF PITCH

 

 

IS X/ 12

 

H (MIN.) - MINIMUM HEIGHT FROM ROOF

 

TO LOWEST DISCHARGE OPENING

Roof Pitch

 

H (Min.) Ft.

Flat to 6/12...........................................................1.0*

Over 6/12 to 7/12.................................................1.25*

Over 7/12 to 8/12.................................................1.5*

Over 8/12 to 9/12.................................................2.0*

Over 9/12 to 10/12...............................................2.5

Over 10/12 to 11/12 .............................................3.25

Over 11/12 to 12/12 .............................................4.0

Over 12/12 to 14/12.............................................5.0

Over 14/12 to 16/12.............................................6.0

Over 16/12 to 18/12.............................................7.0

Over 18/12 to 20/12.............................................7.5

Over 20/12 to 21/12.............................................8.0

* 3 foot minimum in snow regions

Figure 6.1 Minimum Height From Roof To Lowest Discharge

Opening

 

 

A

B

6 in. (minimum) up to 20 in.

18 in. minimum

152 mm/508 mm

457 mm

20 in. and over

0 in. minimum

Gas, Wood or Fuel Oil

Termination Cap

B

A *

Gas

Termination

Cap **

*If using decorative cap cover(s), this distance may need to be increased. Refer to the installation instructions supplied with the decorative cap cover.

**In a staggered installation with both gas and wood or fuel oil terminations, the wood or fuel oil termination cap must be higher than the gas termination cap.

Figure 6.2 Staggered Termination Caps

20

Quadra-FireQV32B-A, QV36B-A2014-900 Rev. U • 1/12

Image 20
Contents HOT Surfaces ModelsWhat to do if you smell gas Congratulations Homeowner Reference InformationTable of Contents User GuideAppliance Setup TroubleshootingFinishing Reference MaterialsLimited Lifetime Warranty Limited Lifetime WarrantyWarranty Conditions Listing and Code Approvals Installation of Carbon Monoxide Detectors Requirements for the Commonwealth of MassachusettsYour Fireplace Gas Fireplace SafetyOperating Instructions User Guide Fixed Glass Assembly Remote Controls, Wall Controls and Wall SwitchesFan Kit optional Clear SpaceWhat to do if YOU Smell GAS Lighting Instructions Standing PilotFinal inspection by After Fireplace is Lit Frequently Asked QuestionsIssue Solutions Maintenance and Service Maintenance Tasks-Qualified Service Technician Gasket Seal and Glass Assembly InspectionLogs FireboxGetting Started Typical Appliance SystemInspect Appliance and Components Design and Installation ConsiderationsTools and Supplies Needed Framing and Clearances Selecting Appliance LocationModels Constructing the Appliance ChaseClearances Combustible Mantel Legs or Wall Projections Mantel and Wall ProjectionsCombustible Mantels Opening Termination LocationsVent Termination Minimum Clearances Covered Alcove Applications Minimum Clearances for TerminationVent Information and Diagrams Approved PipeVent Table Key Use of ElbowsUse of Flex Vent ClearanceTop Vent Horizontal Termination Venting with 1 elbow Propane Minimum MaximumVenting with 2 elbows NG Venting with 2 elbows Propane V1 Minimum H1 + H2 MaximumTop Vent Horizontal Termination Venting with 3 elbows NG Minimum + H 2 MaximumTop Vent Vertical Termination No Elbow = 60 ft. Max .3 m Exhaust restrictor InstructionsTop Vent Vertical Termination Venting with 2 elbows NG Top Vent Vertical Termination Venting with 2 elbows PropaneMinimum Maximum + V 2 Minimum V1 Minimum H1 Maximum V1 + V2 MinimumTop Vent Vertical Termination Venting with 3 elbows NG Top Vent Vertical Termination Venting with 3 elbows PropaneTop Vent Vertical Termination Four 90º Elbows V1 Min H1 Max V2 Min H2 Max V3 MinH1 MAX V1 MIN H2 MAX H1 + H2 MAXRear Vent Horizontal Termination Venting with 3 elbows Rear Vent Vertical Termination Venting with 1 elbowH1 + H2 MAX H1 + H2+ H3 MAX MIN MAX+ H 2 MAX MIN Rear Vent Vertical Termination Venting with 2 elbowsRear Vent Vertical Termination Venting with 3 elbows Prior to installing the gas appliance Coaxial to Colinear VentingClearances to Combustibles Termination Cap Flue DamperConnecting the DV-46DVA-GCL Adapter to Appliance Top Vent Connecting the LINK-DV30B to the DV-46DVA-GCL adapterRear Vent MinimumVent Clearances and Framing Pipe Clearances to CombustiblesWall Penetration Framing Combustible Wall PenetrationInstall the Ceiling Firestop Installing Ceiling FirestopVaulted Ceiling Installation Install Attic Insulation ShieldFlat Ceiling Installation Appliance Preparation Top VentRear Vent Cut the metal retaining band and fold the sides outSecuring and Leveling the Appliance 11 Proper Positioning and Securing of an ApplianceInstalling Vent Pipe DVP and SLP Pipe Attach Vent to the Firebox AssemblyAssemble Vent Sections DVP Pipe Only Assemble Pipe SectionsAssemble Vent Sections SLP Pipe Only Assemble Slip SectionsSecure the Vent Sections Disassemble Vent SectionsInstall Decorative Ceiling Components SLP only Foot minimum in snow regions Install Metal Roof FlashingAssemble and Install Storm Collar Heat Shield Requirements for Horizontal Termination Install Vertical Termination CapInstall Decorative Wall Components SLP only Install Horizontal Termination Cap DVP and SLP Pipe 20 Venting through the wallGas Information Fuel ConversionGas Pressure Gas ConnectionElectrical Information Wiring RequirementsOptional Accessories Requirements Junction Box Installation Wall Switch Installation for Fan OptionalFinishing Facing Material NON-COMBUSTIBLE Board IncludedAppliance Setup Log Set Assembly LOGS-2014 Model QV32B-A Install the Log AssemblyLOG Install the Mesh Install Trim and/or SurroundInstall Hood Air Shutter SettingStanding Pilot Ignition System TroubleshootingSymptom Possible Causes Corrective Action Troubleshooting Symptom Possible Cause Corrective ActionInches Millimeters Appliance Dimension DiagramReference Materials Vent Components Diagrams Quadra-Fire QV32B-A, QV36B-A 2014-900 Rev. U 1/12DVP-TRAP DVP vent componentsRF6M RF12M BEK DVP-BEK2DVP-TRAPFL COOL-ADD222 mm 165 mm 165 mm9-1/4 235 mm 152 mm 168 mm Elbow251 mm Elbow Effective Height LengthSLP-SNKD SLP-CCS-BK SL-2DVPSLP-DCF-BK SLP-WT-BKVent Components Diagrams Coaxial to Colinear Venting LINK-DV30B DV-46DVA-GCLService Parts Log Set AssemblyAt Depot Direct Vent Gas FireplaceSee valve assembly QV36B-A#12 Burner/Valve Assembly Part number list on following12.5 12.7 12.6 12.8 12.15 12.9 12.13Service Parts QV32B-A, QV36B-A StockedQV32B-A Conversion Kits QV36B-A Conversion KitsContact Information