Hearth and Home Technologies QV32B-A Finishing, Wall Projection Acceptable on one side of opening

Page 52

13 Finishing

A. Mantel and Wall Projections

WARNING! Risk of Fire! Comply with all minimum clear- ances as specified. Framing closer than the minimums list- ed must be constructed entirely of noncombustible materials (i.e., steel studs, concrete board, etc.).

Combustible Mantels

All measurements are in inches.

 

 

 

 

 

CEILING

 

 

 

 

 

 

 

 

 

12

 

 

 

 

10

11

 

 

 

 

 

 

 

 

 

 

8

9

 

 

 

 

7

 

 

 

 

32

 

 

 

 

 

6

 

 

 

 

 

 

5

 

 

 

 

 

12 13

4

 

 

 

 

 

3

 

6

7

8

9

10 11

4

5

 

 

 

 

 

 

 

 

 

TOP OF HOOD OR FIREPLACE OPENING

Figure 13.1 Minimum Vertical and Maximum Horizontal

Dimensions of Combustibles

Combustible Mantel Legs or Wall Projections

 

 

 

 

 

 

 

 

 

 

 

 

3 IN.

TOP VIEW

 

 

 

 

 

 

 

 

 

 

 

 

MINIMUM

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

5-3/8 IN.

 

 

 

 

 

 

 

 

MINIMUM

 

 

3 FT. MAXIMUM

 

 

 

Note: Clearance from opening

 

 

 

 

 

 

 

to perpendicular wall.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Figure 13.2 Clearances to Mantel Legs or Wall Projections (Acceptable on both sides of opening.)

 

 

 

 

 

 

 

 

 

3 IN.

TOP VIEW

 

 

 

 

 

 

 

 

 

 

MINIMUM

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

5-3/8 IN.

MINIMUM UNLIMITED

Note: Clearance from opening to perpendicular wall.

Figure 13.3 Wall Projection (Acceptable on one side of opening.)

 

1/2 in.

3-1/2 in.

SHEETROCK

 

NON-COMBUSTIBLE

 

BOARD SHIPPED

 

WITH APPLIANCE

1/2 in.

 

AIR SPACE

Figure 13.4 Non-Combustible Zone

52

Quadra-FireQV32B-A, QV36B-A2014-900 Rev. U • 1/12

Image 52
Contents What to do if you smell gas ModelsHOT Surfaces Congratulations Homeowner Reference InformationTable of Contents User GuideAppliance Setup TroubleshootingFinishing Reference MaterialsLimited Lifetime Warranty Limited Lifetime WarrantyWarranty Conditions Listing and Code Approvals Installation of Carbon Monoxide Detectors Requirements for the Commonwealth of MassachusettsOperating Instructions User Guide Gas Fireplace SafetyYour Fireplace Fixed Glass Assembly Remote Controls, Wall Controls and Wall SwitchesFan Kit optional Clear SpaceFinal inspection by Lighting Instructions Standing PilotWhat to do if YOU Smell GAS Issue Solutions Frequently Asked QuestionsAfter Fireplace is Lit Maintenance and Service Maintenance Tasks-Qualified Service Technician Gasket Seal and Glass Assembly InspectionLogs FireboxGetting Started Typical Appliance SystemTools and Supplies Needed Design and Installation ConsiderationsInspect Appliance and Components Framing and Clearances Selecting Appliance LocationClearances Constructing the Appliance ChaseModels Combustible Mantels Mantel and Wall ProjectionsCombustible Mantel Legs or Wall Projections Vent Termination Minimum Clearances Termination LocationsOpening Covered Alcove Applications Minimum Clearances for TerminationVent Information and Diagrams Approved PipeVent Table Key Use of ElbowsUse of Flex Vent ClearanceTop Vent Horizontal Termination Venting with 1 elbow Propane Minimum MaximumVenting with 2 elbows NG Venting with 2 elbows Propane V1 Minimum H1 + H2 MaximumTop Vent Horizontal Termination Venting with 3 elbows NG Minimum + H 2 MaximumTop Vent Vertical Termination No Elbow = 60 ft. Max .3 m Exhaust restrictor InstructionsTop Vent Vertical Termination Venting with 2 elbows NG Top Vent Vertical Termination Venting with 2 elbows PropaneMinimum Maximum + V 2 Minimum V1 Minimum H1 Maximum V1 + V2 MinimumTop Vent Vertical Termination Venting with 3 elbows NG Top Vent Vertical Termination Venting with 3 elbows PropaneTop Vent Vertical Termination Four 90º Elbows V1 Min H1 Max V2 Min H2 Max V3 MinH1 MAX V1 MIN H2 MAX H1 + H2 MAXRear Vent Horizontal Termination Venting with 3 elbows Rear Vent Vertical Termination Venting with 1 elbowH1 + H2 MAX H1 + H2+ H3 MAX MIN MAXRear Vent Vertical Termination Venting with 3 elbows Rear Vent Vertical Termination Venting with 2 elbows+ H 2 MAX MIN Prior to installing the gas appliance Coaxial to Colinear VentingClearances to Combustibles Termination Cap Flue DamperConnecting the DV-46DVA-GCL Adapter to Appliance Top Vent Connecting the LINK-DV30B to the DV-46DVA-GCL adapterRear Vent MinimumVent Clearances and Framing Pipe Clearances to CombustiblesWall Penetration Framing Combustible Wall PenetrationInstall the Ceiling Firestop Installing Ceiling FirestopFlat Ceiling Installation Install Attic Insulation ShieldVaulted Ceiling Installation Appliance Preparation Top VentRear Vent Cut the metal retaining band and fold the sides outSecuring and Leveling the Appliance 11 Proper Positioning and Securing of an ApplianceInstalling Vent Pipe DVP and SLP Pipe Attach Vent to the Firebox AssemblyAssemble Vent Sections DVP Pipe Only Assemble Pipe SectionsAssemble Vent Sections SLP Pipe Only Assemble Slip SectionsSecure the Vent Sections Disassemble Vent SectionsInstall Decorative Ceiling Components SLP only Assemble and Install Storm Collar Install Metal Roof FlashingFoot minimum in snow regions Install Decorative Wall Components SLP only Install Vertical Termination CapHeat Shield Requirements for Horizontal Termination Install Horizontal Termination Cap DVP and SLP Pipe 20 Venting through the wallGas Information Fuel ConversionGas Pressure Gas ConnectionOptional Accessories Requirements Wiring RequirementsElectrical Information Junction Box Installation Wall Switch Installation for Fan OptionalFinishing Facing Material NON-COMBUSTIBLE Board IncludedAppliance Setup Log Set Assembly LOGS-2014 Model QV32B-A Install the Log AssemblyLOG Install the Mesh Install Trim and/or SurroundInstall Hood Air Shutter SettingSymptom Possible Causes Corrective Action TroubleshootingStanding Pilot Ignition System Troubleshooting Symptom Possible Cause Corrective ActionReference Materials Appliance Dimension DiagramInches Millimeters Vent Components Diagrams Quadra-Fire QV32B-A, QV36B-A 2014-900 Rev. U 1/12DVP-TRAP DVP vent componentsRF6M RF12M BEK DVP-BEK2DVP-TRAPFL COOL-ADD222 mm 165 mm 165 mm9-1/4 235 mm 152 mm 168 mm Elbow251 mm Elbow Effective Height LengthSLP-SNKD SLP-CCS-BK SL-2DVPSLP-DCF-BK SLP-WT-BKVent Components Diagrams Coaxial to Colinear Venting LINK-DV30B DV-46DVA-GCLService Parts Log Set AssemblyAt Depot Direct Vent Gas FireplaceSee valve assembly QV36B-A#12 Burner/Valve Assembly Part number list on following12.5 12.7 12.6 12.8 12.15 12.9 12.13Service Parts QV32B-A, QV36B-A StockedQV32B-A Conversion Kits QV36B-A Conversion KitsContact Information