Hearth and Home Technologies QV32B-A Top Vent Horizontal Termination Venting with 1 elbow Propane

Page 24

F. Vent Diagrams

Top Vent - Horizontal Termination

Venting with 1 elbow (NG)

V1 Minimum

H1 Maximum

90 Elbow

1 ft.

305 mm

1/2 ft.

152 mm

2 ft.

610 mm

 

 

 

 

1-1/2 ft.

457 mm

3 ft.

914 mm

 

 

 

 

2-1/2 ft.

762 mm

5 ft.

1.5 m

 

 

 

 

3-1/2 ft.

1.1 m

7 ft.

2.1 m

 

 

 

 

4-1/2 ft.

1.4 m

15 ft.

4.6 m

 

 

 

 

H1 MAX. =15 ft. (4.6 m)

V1 + H1 MAX. = 40 ft. (12.2 m)

Note: Use SLP Series components only.

Note: There MUST be a 25% reduction in total H when using flex vent except when using the simple up and out installation (see Figure 5.3).

Figure 7.4

Top Vent - Horizontal Termination

Venting with 1 elbow (Propane)

V1 Minimum

H1 Maximum

90 Elbow

Not allowed

 

 

 

 

1/2 ft.

152 mm

1 ft.

305 mm

 

 

 

 

1-1/2 ft.

457 mm

3 ft.

914 mm

 

 

 

 

2-1/2 ft.

762 mm

5 ft.

1.5 m

3-1/2 ft.

1.1 m

7 ft.

2.1 m

 

 

 

 

4-1/2 ft.

1.4 m

15 ft.

4.6 m

 

 

 

 

H1 MAX. =15 ft. (4.6 m)

V1 + H1 MAX. = 40 ft. (12.2 m)

V1

H1

24

Quadra-FireQV32B-A, QV36B-A2014-900 Rev. U • 1/12

Image 24
Contents Models What to do if you smell gasHOT Surfaces Congratulations Homeowner Reference InformationTable of Contents User GuideAppliance Setup TroubleshootingFinishing Reference MaterialsLimited Lifetime Warranty Limited Lifetime WarrantyWarranty Conditions Listing and Code Approvals Installation of Carbon Monoxide Detectors Requirements for the Commonwealth of MassachusettsGas Fireplace Safety Operating Instructions User GuideYour Fireplace Fixed Glass Assembly Remote Controls, Wall Controls and Wall SwitchesFan Kit optional Clear SpaceLighting Instructions Standing Pilot Final inspection byWhat to do if YOU Smell GAS Frequently Asked Questions Issue SolutionsAfter Fireplace is Lit Maintenance and Service Maintenance Tasks-Qualified Service Technician Gasket Seal and Glass Assembly InspectionLogs FireboxGetting Started Typical Appliance SystemDesign and Installation Considerations Tools and Supplies NeededInspect Appliance and Components Framing and Clearances Selecting Appliance LocationConstructing the Appliance Chase ClearancesModels Mantel and Wall Projections Combustible MantelsCombustible Mantel Legs or Wall Projections Termination Locations Vent Termination Minimum ClearancesOpening Covered Alcove Applications Minimum Clearances for TerminationVent Information and Diagrams Approved PipeVent Table Key Use of ElbowsUse of Flex Vent ClearanceTop Vent Horizontal Termination Venting with 1 elbow Propane Minimum MaximumVenting with 2 elbows NG Venting with 2 elbows Propane V1 Minimum H1 + H2 MaximumTop Vent Horizontal Termination Venting with 3 elbows NG Minimum + H 2 MaximumTop Vent Vertical Termination No Elbow = 60 ft. Max .3 m Exhaust restrictor InstructionsTop Vent Vertical Termination Venting with 2 elbows NG Top Vent Vertical Termination Venting with 2 elbows PropaneMinimum Maximum + V 2 Minimum V1 Minimum H1 Maximum V1 + V2 MinimumTop Vent Vertical Termination Venting with 3 elbows NG Top Vent Vertical Termination Venting with 3 elbows PropaneTop Vent Vertical Termination Four 90º Elbows V1 Min H1 Max V2 Min H2 Max V3 MinH1 MAX V1 MIN H2 MAX H1 + H2 MAXRear Vent Horizontal Termination Venting with 3 elbows Rear Vent Vertical Termination Venting with 1 elbowH1 + H2 MAX H1 + H2+ H3 MAX MIN MAXRear Vent Vertical Termination Venting with 2 elbows Rear Vent Vertical Termination Venting with 3 elbows+ H 2 MAX MIN Prior to installing the gas appliance Coaxial to Colinear VentingClearances to Combustibles Termination Cap Flue DamperConnecting the DV-46DVA-GCL Adapter to Appliance Top Vent Connecting the LINK-DV30B to the DV-46DVA-GCL adapterRear Vent MinimumVent Clearances and Framing Pipe Clearances to CombustiblesWall Penetration Framing Combustible Wall PenetrationInstall the Ceiling Firestop Installing Ceiling FirestopInstall Attic Insulation Shield Flat Ceiling InstallationVaulted Ceiling Installation Appliance Preparation Top VentRear Vent Cut the metal retaining band and fold the sides outSecuring and Leveling the Appliance 11 Proper Positioning and Securing of an ApplianceInstalling Vent Pipe DVP and SLP Pipe Attach Vent to the Firebox AssemblyAssemble Vent Sections DVP Pipe Only Assemble Pipe SectionsAssemble Vent Sections SLP Pipe Only Assemble Slip SectionsSecure the Vent Sections Disassemble Vent SectionsInstall Decorative Ceiling Components SLP only Install Metal Roof Flashing Assemble and Install Storm CollarFoot minimum in snow regions Install Vertical Termination Cap Install Decorative Wall Components SLP onlyHeat Shield Requirements for Horizontal Termination Install Horizontal Termination Cap DVP and SLP Pipe 20 Venting through the wallGas Information Fuel ConversionGas Pressure Gas ConnectionWiring Requirements Optional Accessories RequirementsElectrical Information Junction Box Installation Wall Switch Installation for Fan OptionalFinishing Facing Material NON-COMBUSTIBLE Board IncludedAppliance Setup Log Set Assembly LOGS-2014 Model QV32B-A Install the Log AssemblyLOG Install the Mesh Install Trim and/or SurroundInstall Hood Air Shutter SettingTroubleshooting Symptom Possible Causes Corrective ActionStanding Pilot Ignition System Troubleshooting Symptom Possible Cause Corrective ActionAppliance Dimension Diagram Reference MaterialsInches Millimeters Vent Components Diagrams Quadra-Fire QV32B-A, QV36B-A 2014-900 Rev. U 1/12DVP-TRAP DVP vent componentsRF6M RF12M BEK DVP-BEK2DVP-TRAPFL COOL-ADD222 mm 165 mm 165 mm9-1/4 235 mm 152 mm 168 mm Elbow251 mm Elbow Effective Height LengthSLP-SNKD SLP-CCS-BK SL-2DVPSLP-DCF-BK SLP-WT-BKVent Components Diagrams Coaxial to Colinear Venting LINK-DV30B DV-46DVA-GCLService Parts Log Set AssemblyAt Depot Direct Vent Gas FireplaceSee valve assembly QV36B-A#12 Burner/Valve Assembly Part number list on following12.5 12.7 12.6 12.8 12.15 12.9 12.13Service Parts QV32B-A, QV36B-A StockedQV32B-A Conversion Kits QV36B-A Conversion KitsContact Information