Hearth and Home Technologies QV32B-A, QV36B-A owner manual Log

Page 56

Install the Log Assembly

If the gas logs have been factory installed they should not need to be positioned. If the logs have been packaged separately, refer to the following instructions.

Log Set Assembly: LOGS-2016 Model: QV36B-A

1

4 2

5

3

LOG

 

 

SAME

STEP 1: Carefully remove the logs from the packaging.

CAUTION: Logs are fragile!

1

STEP 2: LOG #1 (SRV2016-701): Place notches of log #1 on outer two grate tines, and push against back of firebox.

2

3

STEP 3: LOG #2 (SRV2014-703): Place log #2 with the left tip of the log on the flat spot on the burner. Pull the right part of the log to touch right grate tine, and the top of the log should rest against log #1.

STEP 4: LOG #3 (SRV2014-703): (This log is the same as log #2). Place log #3 with the flat side down and burned side into notch on burner. Pull left end forward against grate.

4

1

2

5

1

3

 

STEP 5: LOG #4 (SRV780-707): Place log #4 across log #1 and log #2 with burned out area facing out.

STEP 6: LOG #5 (SRV700-706): Place log #5 across logs #1 and #3 with the Y-shape facing out.

2016-925B 6/03

56

Quadra-FireQV32B-A, QV36B-A2014-900 Rev. U • 1/12

Image 56
Contents HOT Surfaces ModelsWhat to do if you smell gas Congratulations Homeowner Reference InformationTable of Contents User GuideAppliance Setup TroubleshootingFinishing Reference MaterialsLimited Lifetime Warranty Limited Lifetime WarrantyWarranty Conditions Listing and Code Approvals Installation of Carbon Monoxide Detectors Requirements for the Commonwealth of MassachusettsYour Fireplace Gas Fireplace SafetyOperating Instructions User Guide Fixed Glass Assembly Remote Controls, Wall Controls and Wall SwitchesFan Kit optional Clear SpaceWhat to do if YOU Smell GAS Lighting Instructions Standing PilotFinal inspection by After Fireplace is Lit Frequently Asked QuestionsIssue Solutions Maintenance and Service Maintenance Tasks-Qualified Service Technician Gasket Seal and Glass Assembly InspectionLogs FireboxGetting Started Typical Appliance SystemInspect Appliance and Components Design and Installation ConsiderationsTools and Supplies Needed Framing and Clearances Selecting Appliance LocationModels Constructing the Appliance ChaseClearances Combustible Mantel Legs or Wall Projections Mantel and Wall ProjectionsCombustible Mantels Opening Termination LocationsVent Termination Minimum Clearances Covered Alcove Applications Minimum Clearances for TerminationVent Information and Diagrams Approved PipeVent Table Key Use of ElbowsUse of Flex Vent ClearanceTop Vent Horizontal Termination Venting with 1 elbow Propane Minimum MaximumVenting with 2 elbows NG Venting with 2 elbows Propane V1 Minimum H1 + H2 MaximumTop Vent Horizontal Termination Venting with 3 elbows NG Minimum + H 2 MaximumTop Vent Vertical Termination No Elbow = 60 ft. Max .3 m Exhaust restrictor InstructionsTop Vent Vertical Termination Venting with 2 elbows NG Top Vent Vertical Termination Venting with 2 elbows PropaneMinimum Maximum + V 2 Minimum V1 Minimum H1 Maximum V1 + V2 MinimumTop Vent Vertical Termination Venting with 3 elbows NG Top Vent Vertical Termination Venting with 3 elbows PropaneTop Vent Vertical Termination Four 90º Elbows V1 Min H1 Max V2 Min H2 Max V3 MinH1 MAX V1 MIN H2 MAX H1 + H2 MAXRear Vent Horizontal Termination Venting with 3 elbows Rear Vent Vertical Termination Venting with 1 elbowH1 + H2 MAX H1 + H2+ H3 MAX MIN MAX+ H 2 MAX MIN Rear Vent Vertical Termination Venting with 2 elbowsRear Vent Vertical Termination Venting with 3 elbows Prior to installing the gas appliance Coaxial to Colinear VentingClearances to Combustibles Termination Cap Flue DamperConnecting the DV-46DVA-GCL Adapter to Appliance Top Vent Connecting the LINK-DV30B to the DV-46DVA-GCL adapterRear Vent MinimumVent Clearances and Framing Pipe Clearances to CombustiblesWall Penetration Framing Combustible Wall PenetrationInstall the Ceiling Firestop Installing Ceiling FirestopVaulted Ceiling Installation Install Attic Insulation ShieldFlat Ceiling Installation Appliance Preparation Top VentRear Vent Cut the metal retaining band and fold the sides outSecuring and Leveling the Appliance 11 Proper Positioning and Securing of an ApplianceInstalling Vent Pipe DVP and SLP Pipe Attach Vent to the Firebox AssemblyAssemble Vent Sections DVP Pipe Only Assemble Pipe SectionsAssemble Vent Sections SLP Pipe Only Assemble Slip SectionsSecure the Vent Sections Disassemble Vent SectionsInstall Decorative Ceiling Components SLP only Foot minimum in snow regions Install Metal Roof FlashingAssemble and Install Storm Collar Heat Shield Requirements for Horizontal Termination Install Vertical Termination CapInstall Decorative Wall Components SLP only Install Horizontal Termination Cap DVP and SLP Pipe 20 Venting through the wallGas Information Fuel ConversionGas Pressure Gas ConnectionElectrical Information Wiring RequirementsOptional Accessories Requirements Junction Box Installation Wall Switch Installation for Fan OptionalFinishing Facing Material NON-COMBUSTIBLE Board IncludedAppliance Setup Log Set Assembly LOGS-2014 Model QV32B-A Install the Log AssemblyLOG Install the Mesh Install Trim and/or SurroundInstall Hood Air Shutter SettingStanding Pilot Ignition System TroubleshootingSymptom Possible Causes Corrective Action Troubleshooting Symptom Possible Cause Corrective ActionInches Millimeters Appliance Dimension DiagramReference Materials Vent Components Diagrams Quadra-Fire QV32B-A, QV36B-A 2014-900 Rev. U 1/12DVP-TRAP DVP vent componentsRF6M RF12M BEK DVP-BEK2DVP-TRAPFL COOL-ADD222 mm 165 mm 165 mm9-1/4 235 mm 152 mm 168 mm Elbow251 mm Elbow Effective Height LengthSLP-SNKD SLP-CCS-BK SL-2DVPSLP-DCF-BK SLP-WT-BKVent Components Diagrams Coaxial to Colinear Venting LINK-DV30B DV-46DVA-GCLService Parts Log Set AssemblyAt Depot Direct Vent Gas FireplaceSee valve assembly QV36B-A#12 Burner/Valve Assembly Part number list on following12.5 12.7 12.6 12.8 12.15 12.9 12.13Service Parts QV32B-A, QV36B-A StockedQV32B-A Conversion Kits QV36B-A Conversion KitsContact Information