Hearth and Home Technologies QV32B-A Install Attic Insulation Shield, Flat Ceiling Installation

Page 38

D. Install Attic Insulation Shield

WARNING! Fire Risk. DO NOT allow loose materials or insulation to touch vent. Hearth & Home Technologies Inc. requires the use of an attic shield.

The National Fuel Gas Code ANSI Z223.1 and NFPA 54 requires an attic shield constructed of 26 gauge minimum metal that extends at least 2 in. (51 mm) above insulation.

Attic shields must meet specified clearance and be se- cured in place.

Flat Ceiling Installation

• Remove one shield from box.

NOTICE: Cut previously installed batt insulation to make room for the attic insulation shield.

Wrap shield around pipe if pipe is already installed in area to be insulated.

Match the three holes in each side and fasten with three screws to form a tube.

Bend three tabs on the bottom of the shield outward to allow attachment to the ceiling firestop.

Bend the remaining bottom tabs inward 90º to maintain the air space between the pipe and the shield. Set the shield on the ceiling firestop and attach to the firestop.

Bend all tabs inward 90º around the top of the shield. These tabs must be used to prevent blown insulation from getting between the shield and vent pipe, and to maintain air space clearance.

Vaulted Ceiling Installation

• Remove one shield from box.

NOTICE: Cut previously installed batt insulation to make room for the attic insulation shield.

Cut the attic insulation shield (if application is for vaulted ceiling) to fit your ceiling pitch. Snip cut edge to recreate 1 in. bend tabs all the way around the bottom.

Wrap shield around pipe if pipe is already installed in area to be insulated.

Match the three holes in each side and fasten with three screws to form a tube.

Bend three tabs on the bottom of the shield outward to allow attachment to the ceiling firestop.

Bend the remaining bottom tabs inward 90º to maintain the air space between the pipe and the shield. Set the shield on the ceiling firestop and attach to the firestop.

Bend all tabs inward 90º around the top of the shield. These tabs must be used to prevent blown insulation from getting between the shield and vent pipe, and to maintain air space clearance.

BEND ALL TABS INWARD 90° TO MAINTAIN CLEARANCE AND PREVENT INSULATION FROM FALLING INSIDE

INSERT 3

SCREWS

Figure 8.5 Attic Insulation Shield

BEND 3 TABS

OUTWARD TO FASTEN TO CEILING FIRESTOP-BEND REMAINING TABS INWARD 90 DEGREES TO MAINTAIN CLEARANCE

38

Quadra-FireQV32B-A, QV36B-A2014-900 Rev. U • 1/12

Image 38
Contents HOT Surfaces ModelsWhat to do if you smell gas Congratulations Homeowner Reference InformationTable of Contents User GuideFinishing Appliance SetupTroubleshooting Reference MaterialsLimited Lifetime Warranty Limited Lifetime WarrantyWarranty Conditions Listing and Code Approvals Installation of Carbon Monoxide Detectors Requirements for the Commonwealth of MassachusettsYour Fireplace Gas Fireplace SafetyOperating Instructions User Guide Fan Kit optional Fixed Glass AssemblyRemote Controls, Wall Controls and Wall Switches Clear SpaceWhat to do if YOU Smell GAS Lighting Instructions Standing PilotFinal inspection by After Fireplace is Lit Frequently Asked QuestionsIssue Solutions Maintenance and Service Logs Maintenance Tasks-Qualified Service TechnicianGasket Seal and Glass Assembly Inspection FireboxGetting Started Typical Appliance SystemInspect Appliance and Components Design and Installation ConsiderationsTools and Supplies Needed Framing and Clearances Selecting Appliance LocationModels Constructing the Appliance ChaseClearances Combustible Mantel Legs or Wall Projections Mantel and Wall ProjectionsCombustible Mantels Opening Termination LocationsVent Termination Minimum Clearances Covered Alcove Applications Minimum Clearances for TerminationVent Table Key Vent Information and DiagramsApproved Pipe Use of ElbowsUse of Flex Vent ClearanceTop Vent Horizontal Termination Venting with 1 elbow Propane Minimum MaximumVenting with 2 elbows NG Venting with 2 elbows Propane V1 Minimum H1 + H2 MaximumTop Vent Horizontal Termination Venting with 3 elbows NG Minimum + H 2 MaximumTop Vent Vertical Termination No Elbow = 60 ft. Max .3 m Exhaust restrictor InstructionsMinimum Maximum + V 2 Minimum Top Vent Vertical Termination Venting with 2 elbows NGTop Vent Vertical Termination Venting with 2 elbows Propane V1 Minimum H1 Maximum V1 + V2 MinimumTop Vent Vertical Termination Venting with 3 elbows NG Top Vent Vertical Termination Venting with 3 elbows PropaneTop Vent Vertical Termination Four 90º Elbows V1 Min H1 Max V2 Min H2 Max V3 MinH1 MAX V1 MIN H2 MAX H1 + H2 MAXH1 + H2 MAX H1 + H2+ H3 MAX Rear Vent Horizontal Termination Venting with 3 elbowsRear Vent Vertical Termination Venting with 1 elbow MIN MAX+ H 2 MAX MIN Rear Vent Vertical Termination Venting with 2 elbowsRear Vent Vertical Termination Venting with 3 elbows Clearances to Combustibles Prior to installing the gas applianceCoaxial to Colinear Venting Termination Cap Flue DamperRear Vent Connecting the DV-46DVA-GCL Adapter to Appliance Top VentConnecting the LINK-DV30B to the DV-46DVA-GCL adapter MinimumWall Penetration Framing Vent Clearances and FramingPipe Clearances to Combustibles Combustible Wall PenetrationInstall the Ceiling Firestop Installing Ceiling FirestopVaulted Ceiling Installation Install Attic Insulation ShieldFlat Ceiling Installation Appliance Preparation Top VentRear Vent Cut the metal retaining band and fold the sides outSecuring and Leveling the Appliance 11 Proper Positioning and Securing of an ApplianceAssemble Vent Sections DVP Pipe Only Installing Vent Pipe DVP and SLP PipeAttach Vent to the Firebox Assembly Assemble Pipe SectionsAssemble Vent Sections SLP Pipe Only Assemble Slip SectionsSecure the Vent Sections Disassemble Vent SectionsInstall Decorative Ceiling Components SLP only Foot minimum in snow regions Install Metal Roof FlashingAssemble and Install Storm Collar Heat Shield Requirements for Horizontal Termination Install Vertical Termination CapInstall Decorative Wall Components SLP only Install Horizontal Termination Cap DVP and SLP Pipe 20 Venting through the wallGas Pressure Gas InformationFuel Conversion Gas ConnectionElectrical Information Wiring RequirementsOptional Accessories Requirements Junction Box Installation Wall Switch Installation for Fan OptionalFinishing Facing Material NON-COMBUSTIBLE Board IncludedAppliance Setup Log Set Assembly LOGS-2014 Model QV32B-A Install the Log AssemblyLOG Install Hood Install the MeshInstall Trim and/or Surround Air Shutter SettingStanding Pilot Ignition System TroubleshootingSymptom Possible Causes Corrective Action Troubleshooting Symptom Possible Cause Corrective ActionInches Millimeters Appliance Dimension DiagramReference Materials Vent Components Diagrams Quadra-Fire QV32B-A, QV36B-A 2014-900 Rev. U 1/12DVP-TRAP DVP vent componentsDVP-TRAPFL RF6M RF12MBEK DVP-BEK2 COOL-ADD251 mm 222 mm 165 mm 165 mm9-1/4 235 mm 152 mm 168 mmElbow Elbow Effective Height LengthSLP-DCF-BK SLP-SNKD SLP-CCS-BKSL-2DVP SLP-WT-BKVent Components Diagrams Coaxial to Colinear Venting LINK-DV30B DV-46DVA-GCLAt Depot Service PartsLog Set Assembly Direct Vent Gas FireplaceSee valve assembly QV36B-A12.5 12.7 12.6 12.8 12.15 12.9 #12 Burner/Valve AssemblyPart number list on following 12.13Service Parts QV32B-A, QV36B-A StockedQV32B-A Conversion Kits QV36B-A Conversion KitsContact Information