Top Vent - Horizontal Termination
Venting with 3 elbows (NG)
V1 Minimum | H1 + H2 Maximum | ||
90 Elbow | 0 ft. | 0 mm | |
|
|
|
|
1/2 ft. | 152 mm | 1 ft. | 305 mm |
|
|
|
|
457 mm | 2 ft. | 610 mm | |
|
|
|
|
762 mm | 4 ft. | 1.2 m | |
|
|
|
|
1.1 m | 6 ft. | 1.8 m | |
|
|
|
|
H1 + H2 MAX. =14 ft. (4.3 m)
V1+ V2 + H1 + H2 MAX. = 40 ft. (12.2 m)
Note: Use SLP Series components only.
Top Vent - Horizontal Termination Venting with 3 elbows (Propane)
V1 Minimum | H1 + H2 Maximum | ||
90 Elbow | Not Allowed | ||
|
|
|
|
1/2 ft. | 152 mm | 0 ft. | 0 mm |
|
|
|
|
457 mm | 2 ft. | 610 mm | |
|
|
|
|
762 mm | 4 ft. | 1.2 m | |
|
|
|
|
1.1 m | 6 ft. | 1.8 m | |
|
|
|
|
H1 + H2 MAX. =14 ft. (4.3 m)
V1+ V2 + H1 + H2 MAX. = 40 ft. (12.2 m)
Note: There MUST be a 25% reduction in total H when using flex vent except when using the simple up and out installation (see Figure 5.3).
H2
V2
H1
V1
Figure 7.6
26 |