Hearth and Home Technologies
SL-750TRSFHHIPI
owner manual
Either cobrahead or SIT
Troubleshooting
Install
FAQ
Service Parts
Vent Information and Diagrams
Wiring Requirements
Warranty
Maintenance
Appliance Setup
Fixed Glass Assembly
Page 15
(Either cobrahead or SIT)
Figure 3.1 IPI Pilot Flame Patterns
Heat & Glo •
SL-750TRSFHHIPI
•
2156-900
Rev. F • 11/08
15
Page 14
Page 16
Image 15
Page 14
Page 16
Contents
What to do if you smell gas
HOT Surfaces
Hot glass will cause burns
Congratulations
Homeowner Reference Information
Xxxxxxxx
User Guide
Table of Contents
Reference Materials
Appliance Setup
Troubleshooting
Finishing
CONDITIONS, Exclusions & Limitation of Liability
Limited Lifetime Warranty
Listing and Code Approvals
Requirements for the Commonwealth of Massachusetts
Installation of Carbon Monoxide Detectors
Gas Fireplace Safety
Operating Instructions User Guide
Your Fireplace
Clear Space
Fixed Glass Assembly
Remote Controls, Wall Controls and Wall Switches
Fan Kit optional
GAS Valve
Lighting Instructions IPI
Final inspection by
What to do if YOU Smell GAS
Frequently Asked Questions
Issue Solutions
After Fireplace is Lit
Remote Control
Maintenance and Service
Maintenance Tasks-Homeowner
Glass Cleaning
Logs
Maintenance Tasks-Qualified Service Technician
Gasket Seal and Glass Assembly Inspection
Venting
Either cobrahead or SIT
Typical Appliance System
Getting Started
Any such action may cause a fire hazard
Design and Installation Considerations
Tools and Supplies Needed
Inspect Appliance and Components
Selecting Appliance Location
Framing and Clearances
Clearances
Constructing the Appliance Chase
TOP View
Mantel and Wall Projections
Vent Termination Minimum Clearances
Termination Locations
= Vent Terminal = AIR Supply Inlet
= Area Where Terminal is not Permitted
Use of Elbows
Vent Information and Diagrams
Approved Pipe
Vent Table Key
In. Clearance
Use of Flex Vent
Minimum Maximum
SL-750TRSFHHIPI
Top Vent Horizontal Termination Two Elbows
V1 Minimum H1 Maximum H1 + H2 Maximum V1 + V2 Minimum
Top Vent Horizontal Termination Three Elbows
Exhaust restrictor Instructions
Top Vent Vertical Termination No Elbow = 60 ft. Max .3 m
Minimum Maximum + V 2 Minimum
Top Vent Vertical Termination Two 90º Elbows
H1+ H2 Maximum V1 + V2 Minimum
Top Vent Vertical Termination Three 90º Elbows
V1 Min H1 Max V2 Min H2 Max V3 Min
Top Vent Vertical Termination Four 90º Elbows
H1 Maximum V1 Minimum H1 + H2 Maximum
Rear Vent Horizontal Termination Three Elbows
Rear Vent Vertical Termination One Elbow
H1 Maximum V1 Minimum H2+ H3 H1+ H2+ H3 Maximum
Rear Vent Vertical Termination Two Elbows
H1+ H2 Maximum V1 Minimum
H1 Maximum V1 Minimum H1 + H2
Combustible Wall Penetration
Vent Clearances and Framing
Pipe Clearances to Combustibles
Wall Penetration Framing
Pipe DVP SLP
Install the Ceiling Firestop
Install Attic Insulation Shield
Flat Ceiling Installation
Vaulted Ceiling Installation
Top Vent
Appliance Preparation
Cut the metal retaining band and fold the sides out
Rear Vent
13 Proper Positioning and Securing of an Appliance
Securing and Leveling the Appliance
Assemble Pipe Sections
Installing Vent Pipe DVP and SLP Pipe
Attach Vent to the Firebox Assembly
Assemble Vent Sections DVP Pipe Only
Assemble Slip Sections
Assemble Vent Sections SLP Pipe Only
Disassemble Vent Sections
Secure the Vent Sections
Install Decorative Ceiling Components SLP only
Assemble and Install Storm Collar
Install Metal Roof Flashing
SLP-FS
Install RF4-8
Install Vertical Termination Cap
Install Decorative Wall Components SLP only
Heat Shield Requirements for Horizontal Termination
Install Horizontal Termination Cap DVP and SLP Pipe
Ansi Z223.1 and CAN/CGA-B149 installation codes
Refer to of this manual
Gas Connection
Gas Information
Fuel Conversion
Gas Pressure
Electrical Information
Wiring Requirements
Intellifire Ignition System Wiring
Optional Accessories Requirements
With battery back-up
Electrical Service and Repair
Wall Switch Installation for Fan Optional
Junction Box Installation
To install the Splatter Guard
Finishing
Splatter Guard
To Remove the Splatter Guard
To Close the Lower Access Panel
14 Wall Projection Acceptable on one side of opening
16 Facing Materials
Facing Material
Template
Doors
Elevated Hearth Systems
Appliance Setup
Install Refractory
Step
Step
LOG Notches
Install the Log Assembly
Notch
Air Shutter Setting
Install Trim and/or Surround
Troubleshooting
Symptom Possible Cause Corrective Action
Intellifire Ignition System
Ues to spark, and main
Appliance Dimension Diagram
Reference Materials
Location Inches Millimeters
DVP vent components
Vent Components Diagrams
Horizontal Termination Cap
DVP-TRAP
DVP-TRAPFL
RF6M RF12M
BEK DVP-BEK2
COOL-ADD
DVP-TV
DVP-HRC-SS DVP-HRC-ZC-SS Horizontal Termination CAP
SLP-HRC-SS SLP-HRC-ZC-SS Horizontal Termination CAP
DVP-TB1
Roof Flashing Ceiling Firestop
Elbow
Extended Heat Shield
RF4-8
Snorkel Black Support Box-Black
Wall Thimble-Black
Adapter
Service Parts
Log Set Assembly
At Depot
Service Parts List
IPI Valve Assembly
Contact Information
Related pages
Troubleshooting Guide for Avanti EWC1801DZ
Brief Specifications for Advantech FPM-8192V/8232V
Error messages for Acer 3620
Command data chart for Hitachi CP-X960W
Why the concern? for Panasonic EB-X70
Installing TrueType fonts for Star Micronics HA15 80825072
Parts List Pièces détachées for MTD 769-03247
Passcode List List for Sharp FO-4400
Important safeguards for Mitsumi electronic HC3800
Multicast Filtering Commands for AMX NXA-ENET24
What is the power output of the Denon PMA 495?
Top
Page
Image
Contents