D. Install Attic Insulation Shield

WARNING! Fire Risk. DO NOT allow loose materials or insulation to touch vent. Hearth & Home Technologies Inc. requires the use of an attic shield.

The National Fuel Gas Code ANSI Z223.1 and NFPA 54 requires an attic shield constructed of 26 gauge minimum metal that extends at least 2 in. (51 mm) above insulation.

Attic shields must meet specified clearance and be se- cured in place.

Flat Ceiling Installation

• Remove one shield from box.

NOTICE: Cut previously installed batt insulation to make room for the attic insulation shield.

Wrap shield around pipe if pipe is already installed in area to be insulated.

Match the three holes in each side and fasten with three screws to form a tube.

Bend three tabs on the bottom of the shield outward to allow attachment to the ceiling firestop.

Bend the remaining bottom tabs inward 90° to maintain the air space between the pipe and the shield. Set the shield on the ceiling firestop and attach to the firestop.

Bend all tabs inward 90° around the top of the shield. These tabs must be used to prevent blown insulation from getting between the shield and vent pipe, and to maintain air space clearance.

Vaulted Ceiling Installation

• Remove one shield from box.

NOTICE: Cut previously installed batt insulation to make room for the attic insulation shield.

Cut the attic insulation shield (if application is for vaulted ceiling) to fit your ceiling pitch. Snip cut edge to recreate 1 in. bend tabs all the way around the bottom.

Wrap shield around pipe if pipe is already installed in area to be insulated.

Match the three holes in each side and fasten with three screws to form a tube.

Bend three tabs on the bottom of the shield outward to allow attachment to the ceiling firestop.

Bend the remaining bottom tabs inward 90º to maintain the air space between the pipe and the shield. Set the shield on the ceiling firestop and attach to the firestop.

Bend all tabs inward 90º around the top of the shield. These tabs must be used to prevent blown insulation from getting between the shield and vent pipe, and to maintain air space clearance.

BEND ALL TABS INWARD 90° TO MAINTAIN CLEARANCE AND PREVENT INSULATION FROM FALLING INSIDE

INSERT 3

SCREWS

Figure 8.5 Attic Insulation Shield

BEND 3 TABS

OUTWARD TO FASTEN TO CEILING FIRESTOP-BEND REMAINING TABS INWARD 90 DEGREES TO MAINTAIN CLEARANCE

Heat & Glo • SL-750TRSFHHIPI2156-900 Rev. F • 11/08

37

Image 37
Contents HOT Surfaces What to do if you smell gasHot glass will cause burns Homeowner Reference Information CongratulationsXxxxxxxx User Guide Table of ContentsTroubleshooting Appliance SetupFinishing Reference MaterialsCONDITIONS, Exclusions & Limitation of Liability Limited Lifetime Warranty Listing and Code Approvals Requirements for the Commonwealth of Massachusetts Installation of Carbon Monoxide DetectorsOperating Instructions User Guide Gas Fireplace SafetyYour Fireplace Remote Controls, Wall Controls and Wall Switches Fixed Glass AssemblyFan Kit optional Clear SpaceFinal inspection by Lighting Instructions IPIWhat to do if YOU Smell GAS GAS ValveIssue Solutions Frequently Asked QuestionsAfter Fireplace is Lit Maintenance Tasks-Homeowner Maintenance and ServiceGlass Cleaning Remote ControlGasket Seal and Glass Assembly Inspection Maintenance Tasks-Qualified Service TechnicianVenting LogsEither cobrahead or SIT Typical Appliance System Getting StartedTools and Supplies Needed Design and Installation ConsiderationsInspect Appliance and Components Any such action may cause a fire hazardSelecting Appliance Location Framing and ClearancesClearances Constructing the Appliance ChaseTOP View Mantel and Wall ProjectionsVent Termination Minimum Clearances Termination Locations= Vent Terminal = AIR Supply Inlet = Area Where Terminal is not PermittedApproved Pipe Vent Information and DiagramsVent Table Key Use of ElbowsIn. Clearance Use of Flex VentMinimum Maximum SL-750TRSFHHIPI Top Vent Horizontal Termination Two ElbowsV1 Minimum H1 Maximum H1 + H2 Maximum V1 + V2 Minimum Top Vent Horizontal Termination Three ElbowsExhaust restrictor Instructions Top Vent Vertical Termination No Elbow = 60 ft. Max .3 mMinimum Maximum + V 2 Minimum Top Vent Vertical Termination Two 90º ElbowsH1+ H2 Maximum V1 + V2 Minimum Top Vent Vertical Termination Three 90º ElbowsV1 Min H1 Max V2 Min H2 Max V3 Min Top Vent Vertical Termination Four 90º ElbowsH1 Maximum V1 Minimum H1 + H2 Maximum Rear Vent Vertical Termination One Elbow Rear Vent Horizontal Termination Three ElbowsH1 Maximum V1 Minimum H2+ H3 H1+ H2+ H3 Maximum H1+ H2 Maximum V1 Minimum Rear Vent Vertical Termination Two ElbowsH1 Maximum V1 Minimum H1 + H2 Pipe Clearances to Combustibles Vent Clearances and FramingWall Penetration Framing Combustible Wall PenetrationPipe DVP SLP Install the Ceiling FirestopFlat Ceiling Installation Install Attic Insulation ShieldVaulted Ceiling Installation Top Vent Appliance PreparationCut the metal retaining band and fold the sides out Rear Vent13 Proper Positioning and Securing of an Appliance Securing and Leveling the ApplianceAttach Vent to the Firebox Assembly Installing Vent Pipe DVP and SLP PipeAssemble Vent Sections DVP Pipe Only Assemble Pipe SectionsAssemble Slip Sections Assemble Vent Sections SLP Pipe OnlyDisassemble Vent Sections Secure the Vent SectionsInstall Decorative Ceiling Components SLP only Assemble and Install Storm Collar Install Metal Roof FlashingSLP-FS Install RF4-8Install Decorative Wall Components SLP only Install Vertical Termination CapHeat Shield Requirements for Horizontal Termination Ansi Z223.1 and CAN/CGA-B149 installation codes Install Horizontal Termination Cap DVP and SLP PipeRefer to of this manual Fuel Conversion Gas InformationGas Pressure Gas ConnectionIntellifire Ignition System Wiring Wiring RequirementsOptional Accessories Requirements Electrical InformationWith battery back-up Electrical Service and RepairWall Switch Installation for Fan Optional Junction Box InstallationFinishing To install the Splatter GuardSplatter Guard To Remove the Splatter Guard To Close the Lower Access Panel14 Wall Projection Acceptable on one side of opening 16 Facing Materials Facing MaterialTemplate DoorsElevated Hearth Systems Appliance Setup Step Install RefractoryStep LOG Notches Install the Log AssemblyNotch Air Shutter Setting Install Trim and/or SurroundSymptom Possible Cause Corrective Action TroubleshootingIntellifire Ignition System Ues to spark, and main Reference Materials Appliance Dimension DiagramLocation Inches Millimeters DVP vent components Vent Components DiagramsHorizontal Termination Cap DVP-TRAPBEK DVP-BEK2 RF6M RF12MCOOL-ADD DVP-TRAPFLDVP-TV SLP-HRC-SS SLP-HRC-ZC-SS Horizontal Termination CAP DVP-HRC-SS DVP-HRC-ZC-SS Horizontal Termination CAPDVP-TB1 Extended Heat Shield ElbowRF4-8 Roof Flashing Ceiling FirestopWall Thimble-Black Snorkel Black Support Box-BlackAdapter Service Parts Log Set AssemblyAt Depot Service Parts ListIPI Valve Assembly Contact Information