Hearth and Home Technologies SL-750TRSFHHIPI Reference Materials, Appliance Dimension Diagram

Page 66

16 Reference Materials

A. Appliance Dimension Diagram

Dimensions are actual appliance dimensions. Use for reference only. For framing dimensions and clearances refer to Section 5.

P

Q

GAS LINE ACCESS

V

S

T

O

Ø R

C

B

A

N

M

L

D E

F

U

G

Ø K

J

I

H

ELECTRICAL ACCESS

Location

Inches

Millimeters

A

41

1041

B

36-1/8

917

 

 

 

C

32-1/16

815

D

21-1/2

547

E

34-5/8

879

 

 

 

F

3-9/16

90

 

 

 

G

6-7/8

174

H

26-7/8

683

I

37-7/8

962

 

 

 

J

39-15/16

1015

 

 

 

K

8

203

Location

Inches

Millimeters

L

8-13/16

223

M

16-5/16

415

N

1/2

13

 

 

 

O

30-3/4

781

 

 

 

P

15-3/8

391

Q

15-7/8

403

R

6-5/8

168

 

 

 

S

2-3/16

55

T

6

152

U

1

25

 

 

 

V

33-9/16

853

 

 

 

Figure 16.1 Appliance Dimensions

66

Heat & Glo • SL-750TRSFHHIPI2156-900 Rev. F • 11/08

Image 66
Contents What to do if you smell gas HOT SurfacesHot glass will cause burns Congratulations Homeowner Reference InformationXxxxxxxx Table of Contents User GuideFinishing Appliance SetupTroubleshooting Reference MaterialsCONDITIONS, Exclusions & Limitation of Liability Limited Lifetime Warranty Listing and Code Approvals Installation of Carbon Monoxide Detectors Requirements for the Commonwealth of MassachusettsGas Fireplace Safety Operating Instructions User GuideYour Fireplace Fan Kit optional Fixed Glass AssemblyRemote Controls, Wall Controls and Wall Switches Clear SpaceWhat to do if YOU Smell GAS Lighting Instructions IPIFinal inspection by GAS ValveFrequently Asked Questions Issue SolutionsAfter Fireplace is Lit Glass Cleaning Maintenance and ServiceMaintenance Tasks-Homeowner Remote ControlVenting Maintenance Tasks-Qualified Service TechnicianGasket Seal and Glass Assembly Inspection LogsEither cobrahead or SIT Getting Started Typical Appliance SystemInspect Appliance and Components Design and Installation ConsiderationsTools and Supplies Needed Any such action may cause a fire hazardFraming and Clearances Selecting Appliance LocationConstructing the Appliance Chase ClearancesMantel and Wall Projections TOP ViewTermination Locations Vent Termination Minimum Clearances= Area Where Terminal is not Permitted = Vent Terminal = AIR Supply InletVent Table Key Vent Information and DiagramsApproved Pipe Use of ElbowsUse of Flex Vent In. ClearanceMinimum Maximum Top Vent Horizontal Termination Two Elbows SL-750TRSFHHIPITop Vent Horizontal Termination Three Elbows V1 Minimum H1 Maximum H1 + H2 Maximum V1 + V2 MinimumTop Vent Vertical Termination No Elbow = 60 ft. Max .3 m Exhaust restrictor InstructionsTop Vent Vertical Termination Two 90º Elbows Minimum Maximum + V 2 MinimumTop Vent Vertical Termination Three 90º Elbows H1+ H2 Maximum V1 + V2 MinimumTop Vent Vertical Termination Four 90º Elbows V1 Min H1 Max V2 Min H2 Max V3 MinH1 Maximum V1 Minimum H1 + H2 Maximum Rear Vent Horizontal Termination Three Elbows Rear Vent Vertical Termination One ElbowH1 Maximum V1 Minimum H2+ H3 H1+ H2+ H3 Maximum Rear Vent Vertical Termination Two Elbows H1+ H2 Maximum V1 MinimumH1 Maximum V1 Minimum H1 + H2 Wall Penetration Framing Vent Clearances and FramingPipe Clearances to Combustibles Combustible Wall PenetrationInstall the Ceiling Firestop Pipe DVP SLPInstall Attic Insulation Shield Flat Ceiling InstallationVaulted Ceiling Installation Appliance Preparation Top VentRear Vent Cut the metal retaining band and fold the sides outSecuring and Leveling the Appliance 13 Proper Positioning and Securing of an ApplianceAssemble Vent Sections DVP Pipe Only Installing Vent Pipe DVP and SLP PipeAttach Vent to the Firebox Assembly Assemble Pipe SectionsAssemble Vent Sections SLP Pipe Only Assemble Slip SectionsSecure the Vent Sections Disassemble Vent SectionsInstall Decorative Ceiling Components SLP only Install Metal Roof Flashing Assemble and Install Storm CollarInstall RF4-8 SLP-FSInstall Vertical Termination Cap Install Decorative Wall Components SLP onlyHeat Shield Requirements for Horizontal Termination Install Horizontal Termination Cap DVP and SLP Pipe Ansi Z223.1 and CAN/CGA-B149 installation codesRefer to of this manual Gas Pressure Gas InformationFuel Conversion Gas ConnectionOptional Accessories Requirements Wiring RequirementsIntellifire Ignition System Wiring Electrical InformationElectrical Service and Repair With battery back-upJunction Box Installation Wall Switch Installation for Fan OptionalTo install the Splatter Guard FinishingSplatter Guard To Close the Lower Access Panel To Remove the Splatter Guard14 Wall Projection Acceptable on one side of opening Facing Material 16 Facing MaterialsDoors TemplateElevated Hearth Systems Appliance Setup Install Refractory StepStep Install the Log Assembly LOG NotchesNotch Install Trim and/or Surround Air Shutter SettingTroubleshooting Symptom Possible Cause Corrective ActionIntellifire Ignition System Ues to spark, and main Appliance Dimension Diagram Reference MaterialsLocation Inches Millimeters Vent Components Diagrams DVP vent componentsDVP-TRAP Horizontal Termination CapCOOL-ADD RF6M RF12MBEK DVP-BEK2 DVP-TRAPFLDVP-TV DVP-HRC-SS DVP-HRC-ZC-SS Horizontal Termination CAP SLP-HRC-SS SLP-HRC-ZC-SS Horizontal Termination CAPDVP-TB1 RF4-8 ElbowExtended Heat Shield Roof Flashing Ceiling FirestopSnorkel Black Support Box-Black Wall Thimble-BlackAdapter Log Set Assembly Service PartsService Parts List At DepotIPI Valve Assembly Contact Information