J. Install Vertical Termination Cap

Attach the vertical termination cap by sliding the inner collar of the cap into the inner flue of the pipe section while placing the outer collar of the cap over the outer flue of the pipe section.

Secure the cap by driving three self-tapping screws (supplied) through the pilot holes in the outer collar of the cap into the outer flue of the pipe (see Figure 10.23).

TERMINATION CAP

(1 of 3)

STORM

COLLAR

SCREWS

CAULK

Figure 10.23

K.Install Decorative Wall Components (SLP only)

A decorative wall thimble can be installed on wall through which the vent passes. The decorative wall thimble is used to cover the wall shield firestop.

Slide the decorative wall thimble over the last section of horizontal pipe before connecting the termination cap to the pipe.

Once the pipe section and the termination cap have been connected, slide the wall thimble up to the interior wall surface and attach with screws provided. See Figure 10.24.

L.Heat Shield Requirements for Horizontal Termination

WARNING! Risk of Fire! To prevent overheating and fire, heat shields must extend through the entire wall thick- ness.

DO NOT remove the heat shields attached to the wall shield firestop and the horizontal termination cap (shown in Figure 10.25).

Heat shields must overlap 1-1/2 in. (38 mm) mini- mum.

There are two sections of the heat shield. One section is factory-attached to the wall shield firestop. The other section is factory-attached to the cap. See Figure 10.25.

If the wall thickness does not allow the required 1-1/2 in. (38 mm) heat shield overlap when installed, an extended heat shield must be used.

If the wall thickness is less than 4 in./102 mm (DVP) or 4-3/8 in./ 111 mm (SLP), the heat shields on the cap and wall shield firestop must to be trimmed. A minimum 1-1/2 in. (38 mm) overlap MUST be maintained.

Use an extended heat shield if the finished wall thickness is greater than 7-1/4 in. (184 mm).

The extended heat shield may need to be cut to length maintaining sufficient length for a 1-1/2 in. (38 mm) overlap between heat shields.

Attach the extended heat shield to either of the existing heat shields using the screws supplied with the extended heat shield. Refer to vent components diagrams in the back of this manual.

Rest the small leg on the extended heat shield on top of the pipe section to properly space it from the pipe section.

Important Notice: Heat shields may not be field constructed.

Figure 10.24 Wall Thimble

Heat & Glo • SL-750TRSFHHIPI2156-900 Rev. F • 11/08

47

Image 47
Contents Hot glass will cause burns What to do if you smell gasHOT Surfaces Xxxxxxxx CongratulationsHomeowner Reference Information User Guide Table of ContentsReference Materials Appliance SetupTroubleshooting FinishingCONDITIONS, Exclusions & Limitation of Liability Limited Lifetime Warranty Listing and Code Approvals Requirements for the Commonwealth of Massachusetts Installation of Carbon Monoxide DetectorsYour Fireplace Gas Fireplace SafetyOperating Instructions User Guide Clear Space Fixed Glass AssemblyRemote Controls, Wall Controls and Wall Switches Fan Kit optionalGAS Valve Lighting Instructions IPIFinal inspection by What to do if YOU Smell GASAfter Fireplace is Lit Frequently Asked QuestionsIssue Solutions Remote Control Maintenance and ServiceMaintenance Tasks-Homeowner Glass CleaningLogs Maintenance Tasks-Qualified Service TechnicianGasket Seal and Glass Assembly Inspection VentingEither cobrahead or SIT Typical Appliance System Getting StartedAny such action may cause a fire hazard Design and Installation ConsiderationsTools and Supplies Needed Inspect Appliance and ComponentsSelecting Appliance Location Framing and ClearancesClearances Constructing the Appliance ChaseTOP View Mantel and Wall ProjectionsVent Termination Minimum Clearances Termination Locations= Vent Terminal = AIR Supply Inlet = Area Where Terminal is not PermittedUse of Elbows Vent Information and DiagramsApproved Pipe Vent Table KeyIn. Clearance Use of Flex VentMinimum Maximum SL-750TRSFHHIPI Top Vent Horizontal Termination Two ElbowsV1 Minimum H1 Maximum H1 + H2 Maximum V1 + V2 Minimum Top Vent Horizontal Termination Three ElbowsExhaust restrictor Instructions Top Vent Vertical Termination No Elbow = 60 ft. Max .3 mMinimum Maximum + V 2 Minimum Top Vent Vertical Termination Two 90º ElbowsH1+ H2 Maximum V1 + V2 Minimum Top Vent Vertical Termination Three 90º ElbowsV1 Min H1 Max V2 Min H2 Max V3 Min Top Vent Vertical Termination Four 90º ElbowsH1 Maximum V1 Minimum H1 + H2 Maximum H1 Maximum V1 Minimum H2+ H3 H1+ H2+ H3 Maximum Rear Vent Horizontal Termination Three ElbowsRear Vent Vertical Termination One Elbow H1 Maximum V1 Minimum H1 + H2 Rear Vent Vertical Termination Two ElbowsH1+ H2 Maximum V1 Minimum Combustible Wall Penetration Vent Clearances and FramingPipe Clearances to Combustibles Wall Penetration FramingPipe DVP SLP Install the Ceiling FirestopVaulted Ceiling Installation Install Attic Insulation ShieldFlat Ceiling Installation Top Vent Appliance PreparationCut the metal retaining band and fold the sides out Rear Vent13 Proper Positioning and Securing of an Appliance Securing and Leveling the ApplianceAssemble Pipe Sections Installing Vent Pipe DVP and SLP PipeAttach Vent to the Firebox Assembly Assemble Vent Sections DVP Pipe OnlyAssemble Slip Sections Assemble Vent Sections SLP Pipe OnlyDisassemble Vent Sections Secure the Vent SectionsInstall Decorative Ceiling Components SLP only Assemble and Install Storm Collar Install Metal Roof FlashingSLP-FS Install RF4-8Heat Shield Requirements for Horizontal Termination Install Vertical Termination CapInstall Decorative Wall Components SLP only Refer to of this manual Install Horizontal Termination Cap DVP and SLP PipeAnsi Z223.1 and CAN/CGA-B149 installation codes Gas Connection Gas InformationFuel Conversion Gas PressureElectrical Information Wiring RequirementsIntellifire Ignition System Wiring Optional Accessories RequirementsWith battery back-up Electrical Service and RepairWall Switch Installation for Fan Optional Junction Box InstallationSplatter Guard To install the Splatter GuardFinishing To Remove the Splatter Guard To Close the Lower Access Panel14 Wall Projection Acceptable on one side of opening 16 Facing Materials Facing MaterialTemplate DoorsElevated Hearth Systems Appliance Setup Step Install RefractoryStep LOG Notches Install the Log AssemblyNotch Air Shutter Setting Install Trim and/or SurroundIntellifire Ignition System TroubleshootingSymptom Possible Cause Corrective Action Ues to spark, and main Location Inches Millimeters Appliance Dimension DiagramReference Materials DVP vent components Vent Components DiagramsHorizontal Termination Cap DVP-TRAPDVP-TRAPFL RF6M RF12MBEK DVP-BEK2 COOL-ADDDVP-TV DVP-TB1 DVP-HRC-SS DVP-HRC-ZC-SS Horizontal Termination CAPSLP-HRC-SS SLP-HRC-ZC-SS Horizontal Termination CAP Roof Flashing Ceiling Firestop ElbowExtended Heat Shield RF4-8Adapter Snorkel Black Support Box-BlackWall Thimble-Black Service Parts Log Set AssemblyAt Depot Service Parts ListIPI Valve Assembly Contact Information