G. Install Metal Roof Flashing

Note: Skip this section if using the RF4-8.

See minimum vent heights for various pitched roofs (Figure 10.14) to determine the length of pipe to extend through the roof.

Slide the roof flashing over the pipe sections extending through the roof as shown in Figure 10.15.

 

 

HORIZONTAL

 

 

OVERHANG

2 FT.

20 INCHES MIN.

VERTICAL

MIN.

 

 

WALL

 

LOWEST

 

 

 

DISCHARGE

 

 

OPENING

 

GAS DIRECT VENT

 

 

TERMINATION CAP

 

 

 

 

X

 

 

12

 

 

ROOF PITCH

 

 

IS X/ 12

 

H (MIN.) - MINIMUM HEIGHT FROM ROOF

 

TO LOWEST DISCHARGE OPENING

Roof Pitch

 

H (Min.) Ft.

Flat to 6/12........................................1.0*

Over 6/12 to 7/12............................1.25*

Over 7/12 to 8/12..............................1.5*

Over 8/12 to 9/12..............................2.0*

Over 9/12 to 10/12............................. 2.5

Over 10/12 to 11/12 ......................... 3.25

Over 11/12 to 12/12 ........................... 4.0

Over 12/12 to 14/12........................... 5.0

Over 14/12 to 16/12........................... 6.0

Over 16/12 to 18/12........................... 7.0

Over 18/12 to 20/12........................... 7.5

Over 20/12 to 21/12........................... 8.0

* 3 foot minimum in snow regions

Figure 10.14 Minimum Height From Roof To Lowest Discharge

Opening

 

 

NOTICE: Failure to properly caulk the roof flashing could cause water entry.

Caulk the gap between the roof flashing and the outside diameter of the pipe.

Caulk the perimeter of the flashing where it contacts the roof surface. See Figure 10.15.

CAULK

Figure 10.15

H. Assemble and Install Storm Collar

CAUTION! Risk of Cuts, Abrasions or Flying Debris. Wear protective gloves and safety glasses during instal- lation. Sheet metal edges are sharp.

Connect both halves of the storm collar with two screws (see Figure 10.16).

Wrap the storm collar around the exposed pipe section closest to the roof and align brackets. Insert a bolt (provided) through the brackets and tighten the nut to complete the storm collar assembly. Make sure the collar is tight against the pipe section.

Slide the assembled storm collar down the pipe section until it rests on the roof flashing (see Figure 10.17).

Caulk around the top of the storm collar (see Figure 10.23).

Figure 10.16 Assembling the Storm Collar

Figure 10.17 Assembling the Storm Collar Around the Pipe

Heat & Glo • SL-750TRSFHHIPI2156-900 Rev. F • 11/08

45

Image 45
Contents What to do if you smell gas HOT SurfacesHot glass will cause burns Congratulations Homeowner Reference InformationXxxxxxxx User Guide Table of ContentsTroubleshooting Appliance SetupFinishing Reference MaterialsCONDITIONS, Exclusions & Limitation of Liability Limited Lifetime Warranty Listing and Code Approvals Requirements for the Commonwealth of Massachusetts Installation of Carbon Monoxide DetectorsGas Fireplace Safety Operating Instructions User GuideYour Fireplace Remote Controls, Wall Controls and Wall Switches Fixed Glass AssemblyFan Kit optional Clear SpaceFinal inspection by Lighting Instructions IPIWhat to do if YOU Smell GAS GAS ValveFrequently Asked Questions Issue SolutionsAfter Fireplace is Lit Maintenance Tasks-Homeowner Maintenance and ServiceGlass Cleaning Remote ControlGasket Seal and Glass Assembly Inspection Maintenance Tasks-Qualified Service TechnicianVenting LogsEither cobrahead or SIT Typical Appliance System Getting StartedTools and Supplies Needed Design and Installation ConsiderationsInspect Appliance and Components Any such action may cause a fire hazardSelecting Appliance Location Framing and ClearancesClearances Constructing the Appliance ChaseTOP View Mantel and Wall ProjectionsVent Termination Minimum Clearances Termination Locations= Vent Terminal = AIR Supply Inlet = Area Where Terminal is not PermittedApproved Pipe Vent Information and DiagramsVent Table Key Use of ElbowsIn. Clearance Use of Flex VentMinimum Maximum SL-750TRSFHHIPI Top Vent Horizontal Termination Two ElbowsV1 Minimum H1 Maximum H1 + H2 Maximum V1 + V2 Minimum Top Vent Horizontal Termination Three ElbowsExhaust restrictor Instructions Top Vent Vertical Termination No Elbow = 60 ft. Max .3 mMinimum Maximum + V 2 Minimum Top Vent Vertical Termination Two 90º ElbowsH1+ H2 Maximum V1 + V2 Minimum Top Vent Vertical Termination Three 90º ElbowsV1 Min H1 Max V2 Min H2 Max V3 Min Top Vent Vertical Termination Four 90º ElbowsH1 Maximum V1 Minimum H1 + H2 Maximum Rear Vent Horizontal Termination Three Elbows Rear Vent Vertical Termination One ElbowH1 Maximum V1 Minimum H2+ H3 H1+ H2+ H3 Maximum Rear Vent Vertical Termination Two Elbows H1+ H2 Maximum V1 MinimumH1 Maximum V1 Minimum H1 + H2 Pipe Clearances to Combustibles Vent Clearances and FramingWall Penetration Framing Combustible Wall PenetrationPipe DVP SLP Install the Ceiling FirestopInstall Attic Insulation Shield Flat Ceiling InstallationVaulted Ceiling Installation Top Vent Appliance PreparationCut the metal retaining band and fold the sides out Rear Vent13 Proper Positioning and Securing of an Appliance Securing and Leveling the ApplianceAttach Vent to the Firebox Assembly Installing Vent Pipe DVP and SLP PipeAssemble Vent Sections DVP Pipe Only Assemble Pipe SectionsAssemble Slip Sections Assemble Vent Sections SLP Pipe OnlyDisassemble Vent Sections Secure the Vent SectionsInstall Decorative Ceiling Components SLP only Assemble and Install Storm Collar Install Metal Roof FlashingSLP-FS Install RF4-8Install Vertical Termination Cap Install Decorative Wall Components SLP onlyHeat Shield Requirements for Horizontal Termination Install Horizontal Termination Cap DVP and SLP Pipe Ansi Z223.1 and CAN/CGA-B149 installation codesRefer to of this manual Fuel Conversion Gas InformationGas Pressure Gas ConnectionIntellifire Ignition System Wiring Wiring RequirementsOptional Accessories Requirements Electrical InformationWith battery back-up Electrical Service and RepairWall Switch Installation for Fan Optional Junction Box InstallationTo install the Splatter Guard FinishingSplatter Guard To Remove the Splatter Guard To Close the Lower Access Panel14 Wall Projection Acceptable on one side of opening 16 Facing Materials Facing MaterialTemplate DoorsElevated Hearth Systems Appliance Setup Install Refractory StepStep LOG Notches Install the Log AssemblyNotch Air Shutter Setting Install Trim and/or SurroundTroubleshooting Symptom Possible Cause Corrective ActionIntellifire Ignition System Ues to spark, and main Appliance Dimension Diagram Reference MaterialsLocation Inches Millimeters DVP vent components Vent Components DiagramsHorizontal Termination Cap DVP-TRAPBEK DVP-BEK2 RF6M RF12MCOOL-ADD DVP-TRAPFLDVP-TV DVP-HRC-SS DVP-HRC-ZC-SS Horizontal Termination CAP SLP-HRC-SS SLP-HRC-ZC-SS Horizontal Termination CAPDVP-TB1 Extended Heat Shield ElbowRF4-8 Roof Flashing Ceiling FirestopSnorkel Black Support Box-Black Wall Thimble-BlackAdapter Service Parts Log Set AssemblyAt Depot Service Parts ListIPI Valve Assembly Contact Information