C. Install the Ceiling Firestop

A ceiling firestop MUST be used between floors and attics.

DVP pipe only - Frame an opening 10 in. by 10 in. (254 mm by 254 mm) whenever the vent penetrates a ceiling/floor (see Figure 8.3).

SLP pipe only - Frame opening 9 in. x 9 in. (229 mm x 229 mm) whenever the vent penetrates a ceiling/floor (see Figure 8.3).

Frame the area with the same sized lumber as used in ceiling/floor joist.

The ceiling firestop may be installed above or below the ceiling joists when installed with a attic insulation shield. It must be under joists between floors that are not insulated. Refer to Figure 8.4.

Secure with three fasteners on each side.

WARNING! Risk of Fire! DO NOT pack insu- lation around the vent. Insulation must be kept back from the pipe to prevent overheating.

 

 

ATTIC ABOVE

 

 

A

 

 

A

 

PIPE

A

 

DVP

10 in. (254 mm)

 

SLP

9 in. (229 mm)

Figure 8.3

Installing Ceiling Firestop

 

 

INSTALL ATTIC INSULATION SHIELDS

 

BEFORE OR AFTER INSTALLATION OF VENT SYSTEM

 

3 FASTENERS

 

 

PER SIDE

 

 

CEILING FIRESTOP

CEILING FIRESTOP

 

INSTALLED BELOW CEILING

INSTALLED ABOVE CEILING

 

Figure 8.4 Installing the Attic Shield

 

36

Heat & Glo • SL-750TRSFHHIPI2156-900 Rev. F • 11/08

 

Image 36
Contents What to do if you smell gas HOT SurfacesHot glass will cause burns Congratulations Homeowner Reference InformationXxxxxxxx Table of Contents User GuideAppliance Setup TroubleshootingFinishing Reference MaterialsCONDITIONS, Exclusions & Limitation of Liability Limited Lifetime Warranty Listing and Code Approvals Installation of Carbon Monoxide Detectors Requirements for the Commonwealth of MassachusettsGas Fireplace Safety Operating Instructions User GuideYour Fireplace Fixed Glass Assembly Remote Controls, Wall Controls and Wall SwitchesFan Kit optional Clear SpaceLighting Instructions IPI Final inspection byWhat to do if YOU Smell GAS GAS ValveFrequently Asked Questions Issue SolutionsAfter Fireplace is Lit Maintenance and Service Maintenance Tasks-HomeownerGlass Cleaning Remote ControlMaintenance Tasks-Qualified Service Technician Gasket Seal and Glass Assembly InspectionVenting LogsEither cobrahead or SIT Getting Started Typical Appliance SystemDesign and Installation Considerations Tools and Supplies NeededInspect Appliance and Components Any such action may cause a fire hazardFraming and Clearances Selecting Appliance LocationConstructing the Appliance Chase ClearancesMantel and Wall Projections TOP ViewTermination Locations Vent Termination Minimum Clearances= Area Where Terminal is not Permitted = Vent Terminal = AIR Supply InletVent Information and Diagrams Approved PipeVent Table Key Use of ElbowsUse of Flex Vent In. ClearanceMinimum Maximum Top Vent Horizontal Termination Two Elbows SL-750TRSFHHIPITop Vent Horizontal Termination Three Elbows V1 Minimum H1 Maximum H1 + H2 Maximum V1 + V2 MinimumTop Vent Vertical Termination No Elbow = 60 ft. Max .3 m Exhaust restrictor InstructionsTop Vent Vertical Termination Two 90º Elbows Minimum Maximum + V 2 MinimumTop Vent Vertical Termination Three 90º Elbows H1+ H2 Maximum V1 + V2 MinimumTop Vent Vertical Termination Four 90º Elbows V1 Min H1 Max V2 Min H2 Max V3 MinH1 Maximum V1 Minimum H1 + H2 Maximum Rear Vent Horizontal Termination Three Elbows Rear Vent Vertical Termination One ElbowH1 Maximum V1 Minimum H2+ H3 H1+ H2+ H3 Maximum Rear Vent Vertical Termination Two Elbows H1+ H2 Maximum V1 MinimumH1 Maximum V1 Minimum H1 + H2 Vent Clearances and Framing Pipe Clearances to CombustiblesWall Penetration Framing Combustible Wall PenetrationInstall the Ceiling Firestop Pipe DVP SLPInstall Attic Insulation Shield Flat Ceiling InstallationVaulted Ceiling Installation Appliance Preparation Top VentRear Vent Cut the metal retaining band and fold the sides outSecuring and Leveling the Appliance 13 Proper Positioning and Securing of an ApplianceInstalling Vent Pipe DVP and SLP Pipe Attach Vent to the Firebox AssemblyAssemble Vent Sections DVP Pipe Only Assemble Pipe SectionsAssemble Vent Sections SLP Pipe Only Assemble Slip SectionsSecure the Vent Sections Disassemble Vent SectionsInstall Decorative Ceiling Components SLP only Install Metal Roof Flashing Assemble and Install Storm CollarInstall RF4-8 SLP-FSInstall Vertical Termination Cap Install Decorative Wall Components SLP onlyHeat Shield Requirements for Horizontal Termination Install Horizontal Termination Cap DVP and SLP Pipe Ansi Z223.1 and CAN/CGA-B149 installation codesRefer to of this manual Gas Information Fuel ConversionGas Pressure Gas ConnectionWiring Requirements Intellifire Ignition System WiringOptional Accessories Requirements Electrical InformationElectrical Service and Repair With battery back-upJunction Box Installation Wall Switch Installation for Fan OptionalTo install the Splatter Guard FinishingSplatter Guard To Close the Lower Access Panel To Remove the Splatter Guard14 Wall Projection Acceptable on one side of opening Facing Material 16 Facing MaterialsDoors TemplateElevated Hearth Systems Appliance Setup Install Refractory StepStep Install the Log Assembly LOG NotchesNotch Install Trim and/or Surround Air Shutter SettingTroubleshooting Symptom Possible Cause Corrective ActionIntellifire Ignition System Ues to spark, and main Appliance Dimension Diagram Reference MaterialsLocation Inches Millimeters Vent Components Diagrams DVP vent componentsDVP-TRAP Horizontal Termination CapRF6M RF12M BEK DVP-BEK2COOL-ADD DVP-TRAPFLDVP-TV DVP-HRC-SS DVP-HRC-ZC-SS Horizontal Termination CAP SLP-HRC-SS SLP-HRC-ZC-SS Horizontal Termination CAPDVP-TB1 Elbow Extended Heat ShieldRF4-8 Roof Flashing Ceiling FirestopSnorkel Black Support Box-Black Wall Thimble-BlackAdapter Log Set Assembly Service PartsService Parts List At DepotIPI Valve Assembly Contact Information