D. Doors

Only doors certified for use with this appliance model may be used. Contact your dealer for a list of doors that may be used. Once you have determined what kind of door and finishing material is going to be used on the fireplace, you may use the table below which shows the door mod- els and the finishing material thickness allowed. For an inside fit there is an available template to assist with siz- ing the finishing material.

UNITS AND

SL-750TRSFHHIPI (Template-36)

 

TEMPLATE PART #

 

 

 

 

 

 

DOOR

FIT

FINISH MATERIAL

SEE

X

 

Y

THICKNESS

FIGURE

 

 

 

 

 

 

Aero-36

Inside

4 inches Max.

13.17

N/A

 

N/A

Chad-36E

Overlap

1 inch Max.

13.18

N/A

 

N/A

Chad-36E

Inside

0-4 inches

13.19

37-1/4 in.

 

34 in.

Halston-36E

Overlap

1 inch Max.

13.18

N/A

 

N/A

 

 

 

 

 

 

 

Halston-36E

Inside

0-4 inches

13.20

37-1/4 in.

 

34 in.

 

 

 

 

 

 

 

Table 1. Finishing Clearances for Aero, Chad and Halston Fronts

FINISHING MATERIAL

DOOR

FINISHING MATERIAL

 

4 IN. MAXIMUM THICKNESS

 

4 IN. MAXIMUM THICKNESS

Stop finishing material flush with fireplace surround opening.

Figure 13.17 Aero Door

FRONT FACE OF FIREPLACE

1 in. MAX

DOORFINISHING MATERIAL (TOP EDGE)

Finishing materials 1 inch maximum thick.

Stop finishing material flush with opening.

Figure 13.18 Overlap Fit Door (Chad and Halston)

FINISHING MATERIAL

FINISHING MATERIAL

4 IN. MAXIMUM

4 IN. MAXIMUM

THICKNESS

THICKNESS

 

 

DOOR

Y

X

(Includes 1/8 in. opening each side of door)

Finishing material between 1 and 4 inches thick.

Refer to Table 1 for X and Y dimensions.

Figure 13.19 Inside Fit Door (Chad)

FINISHING

FINISHING

MATERIAL

MATERIAL

*IF FINISHING MATERIAL IS THICKER THAN

2 IN., DOORS WILL ONLY OPEN

AS FAR AS PICTURED

DOORS

Y

X

(Includes 1/8 in. opening each side of door)

Finishing material between 1 and 4 inches thick.

Refer to Table 1 for X and Y dimensions.

Figure 13.20 Operable Hinge Door (Halston)

Heat & Glo • SL-750TRSFHHIPI2156-900 Rev. F • 11/08

57

Image 57
Contents What to do if you smell gas HOT SurfacesHot glass will cause burns Congratulations Homeowner Reference InformationXxxxxxxx User Guide Table of ContentsTroubleshooting Appliance SetupFinishing Reference MaterialsCONDITIONS, Exclusions & Limitation of Liability Limited Lifetime Warranty Listing and Code Approvals Requirements for the Commonwealth of Massachusetts Installation of Carbon Monoxide DetectorsGas Fireplace Safety Operating Instructions User GuideYour Fireplace Remote Controls, Wall Controls and Wall Switches Fixed Glass AssemblyFan Kit optional Clear SpaceFinal inspection by Lighting Instructions IPIWhat to do if YOU Smell GAS GAS ValveFrequently Asked Questions Issue SolutionsAfter Fireplace is Lit Maintenance Tasks-Homeowner Maintenance and ServiceGlass Cleaning Remote ControlGasket Seal and Glass Assembly Inspection Maintenance Tasks-Qualified Service TechnicianVenting LogsEither cobrahead or SIT Typical Appliance System Getting StartedTools and Supplies Needed Design and Installation ConsiderationsInspect Appliance and Components Any such action may cause a fire hazardSelecting Appliance Location Framing and ClearancesClearances Constructing the Appliance ChaseTOP View Mantel and Wall ProjectionsVent Termination Minimum Clearances Termination Locations= Vent Terminal = AIR Supply Inlet = Area Where Terminal is not PermittedApproved Pipe Vent Information and DiagramsVent Table Key Use of ElbowsIn. Clearance Use of Flex VentMinimum Maximum SL-750TRSFHHIPI Top Vent Horizontal Termination Two ElbowsV1 Minimum H1 Maximum H1 + H2 Maximum V1 + V2 Minimum Top Vent Horizontal Termination Three ElbowsExhaust restrictor Instructions Top Vent Vertical Termination No Elbow = 60 ft. Max .3 mMinimum Maximum + V 2 Minimum Top Vent Vertical Termination Two 90º ElbowsH1+ H2 Maximum V1 + V2 Minimum Top Vent Vertical Termination Three 90º ElbowsV1 Min H1 Max V2 Min H2 Max V3 Min Top Vent Vertical Termination Four 90º ElbowsH1 Maximum V1 Minimum H1 + H2 Maximum Rear Vent Horizontal Termination Three Elbows Rear Vent Vertical Termination One ElbowH1 Maximum V1 Minimum H2+ H3 H1+ H2+ H3 Maximum Rear Vent Vertical Termination Two Elbows H1+ H2 Maximum V1 MinimumH1 Maximum V1 Minimum H1 + H2 Pipe Clearances to Combustibles Vent Clearances and FramingWall Penetration Framing Combustible Wall PenetrationPipe DVP SLP Install the Ceiling FirestopInstall Attic Insulation Shield Flat Ceiling InstallationVaulted Ceiling Installation Top Vent Appliance PreparationCut the metal retaining band and fold the sides out Rear Vent13 Proper Positioning and Securing of an Appliance Securing and Leveling the ApplianceAttach Vent to the Firebox Assembly Installing Vent Pipe DVP and SLP PipeAssemble Vent Sections DVP Pipe Only Assemble Pipe SectionsAssemble Slip Sections Assemble Vent Sections SLP Pipe OnlyDisassemble Vent Sections Secure the Vent SectionsInstall Decorative Ceiling Components SLP only Assemble and Install Storm Collar Install Metal Roof FlashingSLP-FS Install RF4-8Install Vertical Termination Cap Install Decorative Wall Components SLP onlyHeat Shield Requirements for Horizontal Termination Install Horizontal Termination Cap DVP and SLP Pipe Ansi Z223.1 and CAN/CGA-B149 installation codesRefer to of this manual Fuel Conversion Gas InformationGas Pressure Gas ConnectionIntellifire Ignition System Wiring Wiring RequirementsOptional Accessories Requirements Electrical InformationWith battery back-up Electrical Service and RepairWall Switch Installation for Fan Optional Junction Box InstallationTo install the Splatter Guard FinishingSplatter Guard To Remove the Splatter Guard To Close the Lower Access Panel14 Wall Projection Acceptable on one side of opening 16 Facing Materials Facing MaterialTemplate DoorsElevated Hearth Systems Appliance Setup Install Refractory StepStep LOG Notches Install the Log AssemblyNotch Air Shutter Setting Install Trim and/or SurroundTroubleshooting Symptom Possible Cause Corrective ActionIntellifire Ignition System Ues to spark, and main Appliance Dimension Diagram Reference MaterialsLocation Inches Millimeters DVP vent components Vent Components DiagramsHorizontal Termination Cap DVP-TRAPBEK DVP-BEK2 RF6M RF12MCOOL-ADD DVP-TRAPFLDVP-TV DVP-HRC-SS DVP-HRC-ZC-SS Horizontal Termination CAP SLP-HRC-SS SLP-HRC-ZC-SS Horizontal Termination CAPDVP-TB1 Extended Heat Shield ElbowRF4-8 Roof Flashing Ceiling FirestopSnorkel Black Support Box-Black Wall Thimble-BlackAdapter Service Parts Log Set AssemblyAt Depot Service Parts ListIPI Valve Assembly Contact Information