LG Electronics LS-Q096ABG After Evacuation, Connect the charge hose to the charging cylinder

Page 45

4. Gas Charging

(After Evacuation)

Indoor unit

Liquid side

 

Open

Outdoor unit

2-Way valve

Gas side

Open

 

3-Way

Check valve

valve

 

Charging cylinder

Lo

(1) OPEN

CLOSE

• Procedure

(1)Connect the charge hose to the charging cylinder.

Connect the charge hose which you dis-con- nected from the vacuum pump to the valve at the bottom of the cylinder.

If you are using a gas cylinder, also use a scale and revers the cylinder so that the system can be charged with liquid.

(2)Purge the air from the charge hose.

Open the valve at the bottom of the cylinder and press the check valve on the charge set to purge the air. (Be careful of the liquid refriger- ant). The procedure is the same if using a gas cylinder.

(3)Open the valve (Lo side on the charge set and charge the system with liquid refrigerant.

If the system can not be charged with the spec- ified amount of refrigerant, it can be charged with a little at a time (approximately 150g each time) while operating the air conditioner in the cooling cycle; however, one time is not suffi- cient, wait approximately 1 minute and then repeat the procedure (pumping down-pin).

\

This is different from previous procedures. Because you are charging with liquid refrigerant from the gas side, absolutely do not attempt to charge with larger amounts of liquid refrigerant while operating the air conditioner.

(4)Immediately disconnect the charge hose from the 3-way valve’s service port.

Stopping partway will allow the gas to be dis- charged.

If the system has been charged with liquid refrigerant while operating the air conditioner turn off the air conditioner before disconnecting the hose.

(5)Mount the valve stem nuts and the service port nut.

Use torque wrench to tighten the service port nut to a torque of 1.8 kg.m.

Be sure to check for gas leakage.

-45-

Image 45
Contents Room Air Conditioner Contents Code Type Code of Model Meaning Details of LG Model Name2002Meaning Details of LG Model Name2003~Indoor Unit FunctionsRemote Control Room, Temperature Checking PLASMAOptional Setting the Time or Timer Timer SelectionAirflow Direction Control Air Circulation Product References Model NameUnit 1Ø, 220V, 60Hz All Models DimensionsOutdoor Unit 9k Heat Pump Cooling Only Models Refrigeration Cycle DiagramLS-Q096ABL, LS-Q096AEL LS-H096QNA0, LS-H096QNA0 Wiring DiagramCooling Mode Operation Healthy Dehumidification ModeOperation Details Defrost Control Heating Mode OperationFuzzy Operation C/O Model Fuzzy Operation H/P ModelFuzzy Operation for Cooling Airflow Speed Selection On-Timer OperationFuzzy Operation for Dehumidification Fuzzy Operation for HeatingOff-Timer ↔ On-Timer Operation Off-Timer OperationSleep Timer Operation Chaos Swing ModeJet Cool Mode Operation H/P Model Jet Cool Mode Operation C/O ModelAir Cleaner Operation Forced OperationRemote Control Operation Mode Protection of the evaporator pipe from frostingBuzzer Sounding Operation Self-diagnosis Function Display FunctionHeating Model Cooling ModelInstallation Selection of the best locationPiping length and elevation Drill a hole in the wall How to fix installation plateFlaring work Indoor unit installation Connection of piping IndoorFor right rear piping Tighten the flare nut with a wrench Wrap the insulation material around the connecting portionTape the drain hose and the connecting cable Insert the connecting cable into the indoor unitConnection of the pipes-Outdoor Align the center of the pipings and sufficientlyTighten the flare nut by hand Connect the cable to the Indoor unit Connecting The Cable Between Indoor Unit and Outdoor UnitConnect the cable to the outdoor unit Form the piping Checking the drainageTo remove the front panel from the indoor unit To check the drainagePump Down Procedure Prepare remote controlSettlement of outdoor unit Evaluation of the performanceOperation Name and Function-Remote ControlON/OFF Timer Buttons To remove the Grille from the Chassis Disassembly of the parts Indoor unitTo remove the Control Box When repair, do not damage the Caution labelTo remove the Discharge Grille To remove the EvaporatorTo remove the Cross-Flow Fan To remove the Motor CoverWay Valve Liquid Side Way, 3-way ValveProcedure Check for gas leakagePurge the air from the system Set the 2-way valve to the closed position Air purging of the charge hoseRe-air purging Gas leakage Balance refrigerant of the 2-way, 3-way valvesAll amount of refrigerant leaked EvacuationAfter Evacuation Connect the charge hose to the charging cylinderPurge the air from the charge hose Trouble analysis Cycle Troubleshooting GuideElectronic Parts Troubleshooting Guide Product is not operate with the remote control Compressor/Outdoor Fan are unable to drive When indoor Fan does not operate When Vertical Louver does not operate Way Relay When Heating does not operatePage Electronic Control Device Main P.W.B Assembly DC Part TOP View Bottom View TOP View 6871A20194 TOP View 6871A30009 TOP View6871A20227 TOP View 6871A20391 TOP View 6871A20390 TOP ViewSchematic Diagram LED Type HVB Typeplasma Heat Pump Model LED Type Heat Pump Model HVB Type Exploded View and Replacement Parts List LS-Q076ABL LS-Q076BBG LS-Q076BEL Parts ListIndoorLS-Q096ABL LS-Q096BBG CABLE, Flat CABLE, Falt Cover ASSEMBLY,MOTOR LS-Q082AAL LS-C082QMA0 LS-C082QNA0 LS-C096QGL0 LS-C096QLA0 LS-C096QNA0 LS-H096QGL1 W0CZZ Parts ListOutdoor 552202 567502 561410 554160 447910 550140 430410 552203-2 TUBE,CAPILLARY Bend Compressor Base ASSEMBLY,OUTDOOR Tube ASSY,CAPILLARY LS-C082QMA0 LS-C082QNAO LS-C096QGL0 3041AR2415K April