Baxi Potterton 30 HE manual Legislation, Important Installation, Commissioning, Service & Repair

Page 4

IMPORTANT - Installation, Commissioning, Service & Repair

This appliance must be installed in accordance with the manufacturer’s instructions and the regulations in force. Read the instructions fully before installing or using the appliance.

In GB, this must be carried out by a competent person as stated in the Gas Safety (Installation & Use) Regulations.

Definition of competence: A person who works for a CORGI registered company and holding current certificates in the relevant ACS modules, is deemed competent.

In IE, this must be carried out by a competent person as stated in I.S. 813 “Domestic Gas Installations”.

The addition of anything that may interfere with the normal operation of the appliance without express written permission from the manufacturer or his agent could invalidate the appliance warranty. In GB this could also infringe the Gas Safety (Installation and Use) Regulations.

Warning - Check the information on the data plate is compatible with local supply conditions.

All CORGI registered installers carry a CORGI identification card and have a registration number. You can check your installer is registered by telephoning 0870 4012300 or writing to:-

1Elmwood, Chineham Business Park, Crockford Lane, Basingstoke. RG24 8WG

or check online at www.corgi-gas-safety.com

The boiler meets the requirements of Statutory Instrument “ The Boiler (Efficiency) Regulations 1993 No 3083” and is deemed to meet the requirements of Directive 92/42/EEC on the energy efficiency requirements for new hot water boilers fired with liquid or gaseous fuels:-

Type test for purpose of Regulation 5 certified by:

Notified Body 0051.

Product/Production certified by:

Notified Body 0086.

For GB/IE only.

Legislation

This company declare that no substances harmful to health are contained in the appliance or used during appliance manufacture.

The appliance is suitable only for installation in GB and IE and should be installed in accordance with the rules in force, and only used in a suitably ventilated location.

In GB, the installation must be carried out by a CORGI Registered Installer. It must be carried out in accordance with the relevant requirements of the:

Gas Safety (Installation & Use) Regulations.

The appropriate Building Regulations either The Building Regulations, The Building Regulations (Scotland), Building Regulations (Northern Ireland).

The Water Fittings Regulations or Water Byelaws in Scotland.

The Current I.E.E. Wiring Regulations.

Where no specific instructions are given, reference should be made to the relevant British Standard Code of Practice.

In IE, the installation must be carried out by a competent Person and installed in accordance with the current edition of I.S. 813 ‘Domestic Gas Installations’, the current Building Regulations and reference should be made to the current ETCI rules for electrical installation.

All systems must be thoroughly flushed and treated with inhibitor (see section 6.2).

Codes of Practice, most recent version should be used

In GB the following Codes of Practice apply:

Standard

Scope

BS 6891

Gas Installation.

BS 5546

Installation of hot water supplies for

 

domestic purposes.

BS 5449

Forced circulation hot water systems.

BS 6798

Installation of gas fired hot water boilers.

BS 5440 Part 1

Flues.

BS 5440 Part 2

Ventilation.

BS 7074

Expansion vessels and ancillary equipment

 

for sealed water systems.

BS 7593

Treatment of water in domestic hot water

 

central heating systems.

In IE the following Codes of Practice apply:

Standard

Scope

I.S. 813

Domestic Gas Installations.

The following BS standards give valuable additional information;

BS 5546

Installation of hot water supplies for

 

domestic purposes.

BS 5449

Forced circulation hot water systems.

BS 7074

Expansion vessels and ancillary equipment

 

for sealed water systems.

BS 7593

Treatment of water in domestic hot water

 

central heating systems.

4© Baxi Heating UK Ltd 2007

Image 4
Contents Installation & Service Instructions Contents Installer Notification Guidelines Scheme Members onlyLegislation Important Installation, Commissioning, Service & RepairCodes of Practice, most recent version should be used Safe Manual Handling GeneralPreparation TechniqueIntroduction DescriptionOptional Extras Case Front Panel Control Box Data BadgeLayout General Layout1211 30 31 32 Central Heating Mode Fig Domestic Hot Water Mode FigFrost Protection Mode Appliance OperationTechnical Data Performa 30 HEDimensions and Fixings System Details InformationCentral Heating Circuit BypassSystem Filling and Pressurising Pressure Relief Valve FigShowers Domestic Hot Water Circuit FigHard Water Areas Location Site RequirementsClearances Figs Gas Supply Ventilation of CompartmentsElectrical Supply External termination via internal Condensate DrainPlume Displacement Kit FlueBuilt-in element such as a window frame. See BS 5440 Pt Or DoorFlue Options Horizontal FluesHorizontal Flue Systems This bend is equivalent to 1 metreVertical Flues Twin Pipe Twin & Vertical Flue SystemsMetre for each 91.5 elbow Metre for each 45 elbow 1m extension 45bend 25m 91.5bendKey Accessory Size Flue Accessories5111079 Air duct adaptor Flue Duct AdaptorFor Twin Flue Systems fit the adaptors as follows Flue Dimensions For Roof TerminalsFlue Trim Terminal Guard FigPlume Displacement Plume Displacement Kit bElbow/Plume Outlet Assembly Ring Bracket Metres 60Ø Exhaust Flue Pipe 60Ø SupportDetermining Permissible Lengths 30mm General Fitting NotesMin metres Flue Trim Spigot ScrewPlume Outlet Elbow Installation Initial PreparationFlushing Preparing The BoilerFitting The Boiler Condensate Drain see sectionPressure Relief Valve Discharge Pipe Wall Plate Remove the sealing caps from the boiler connectionsFitting The Flue Wall Thickness Flue Elbow AdaptorWasteY Flue Inner Flue Support Bracket Flue Elbow Vertical FlueMaking The Electrical Connections Preliminary Electrical ChecksCommissioning the Boiler Commissioning the BoilerChecking the Burner Pressure Pressure Test Point Sealing ScrewCompletion CompletionCase Front Panel Facia Panel Servicing the Boiler 13 .1 Annual ServicingAnnual Servicing Changing Components Pressure Switch FigFan Figs Heat Exchanger Fig 14.0 Changing ComponentsBurner Fig Injectors Fig Electrodes FigInsulation Fig Reassemble in reverse orderCentral Heating Temperature Sensor Fig Safety Thermostat FigDHW Temperature Sensor Fig Gas Valve FigPump Complete Fig Pump Head Only FigAutomatic Air Vent Fig Expansion Vessel Fig Pressure Gauge FigsCondensate Trap Fig Selector Switch Fig 14.19 P.C.B. FigPlate Heat Exchanger Fig Diverter Valve Assembly Flow Regulator FigsSecondary Heat Exchanger Fig Flue Overheat Thermostat FigIllustrated Wiring Diagram Control PCBFault Finding Microswitch terminals Diverter valve spindle Assembly faultyDomestic Hot Water Follow operational sequence Turn selector to neon illuminatedCheck wiring PCB A4 connector Replace selector Terminals 4 Replace pump PCB A4 connector terminals 3 Replace PCBPCB A2 connector, is Across terminals 5 Replace microswitchPCB A1 connector has 230V AC Turn selector switchTo ‘Reset’ position Gas at burnerON/OFF/RESET selector when turned to ‘Reset’ position Short Parts List Short Parts List131 154GAS Boiler Commissioning Checklist Service Interval Record Potterton
Related manuals
Manual 12 pages 48.65 Kb

30 HE specifications

The Baxi Potterton 30 HE is a popular choice among homeowners seeking an efficient and reliable boiler solution. Recognized for its compact design and advanced technologies, this boiler is ideal for various residential heating needs.

One of the standout features of the Baxi Potterton 30 HE is its high efficiency rating, which ensures lower energy consumption and reduced utility bills. With an impressive efficiency of up to 90%, this boiler operates at a much higher capacity compared to older models, making it both environmentally friendly and cost-effective. The 30 HE is particularly well-suited for medium to larger homes with a higher demand for hot water.

The Baxi Potterton 30 HE incorporates a range of innovative technologies aimed at enhancing performance and reliability. The automatic modulation function adjusts the boiler's output according to demand, ensuring that it only works as hard as necessary. This not only prolongs the lifespan of the unit but also maximizes comfort levels in the home.

Another feature of the 30 HE is its low noise operation. This boiler has been specifically designed to minimize sound, allowing it to operate quietly in the background without disturbing daily activities. This makes it an ideal choice for homes where noise can be a concern, particularly in open-plan living spaces.

The compact dimensions of the Baxi Potterton 30 HE make it easy to install in various locations, whether it be in a kitchen, utility room, or even a loft space. Its lightweight construction further simplifies the installation process, saving both time and labor costs.

In terms of user-friendliness, the boiler is equipped with an intuitive control panel that allows homeowners to easily adjust settings and monitor performance. This user-centric design ensures that even those who may not be technically inclined can manage their heating requirements with ease.

Safety features are also a priority in the design of the Baxi Potterton 30 HE. It includes built-in safety mechanisms such as frost protection and a burner pressure monitoring system, which work to prevent overheating and ensure optimal operation.

Overall, the Baxi Potterton 30 HE is an efficient, reliable, and user-friendly boiler that meets the heating demands of modern homes. Its blend of advanced technologies, compact size, and focus on safety make it a standout choice for homeowners seeking a high-performance heating solution.