CHECKING FOR SUFFICIENT COMBUSTION AIR OR VENTING ISSUES
Draft Test
After successfully lighting the water heater, allow the unit to operate for 15 minutes and check the draft hood relief opening for proper draft. Make sure all other appliances in the area are operating and all doors/windows are closed when performing the draft test. Pass a match flame or smoke around the relief opening of the draft hood. A steady flame or smoke drawn into the opening indicates proper draft.
If the flame flutters or is blown out, combustion products are escaping from the relief opening. If this occurs, do not operate the water heater until proper adjustments or repairs are made to the vent pipe system and/or air supply requirements.
Flue Products Vented to Ouside of Building
Dilution Air
Dilution Air
Draft Hood
Match
Dilution Air
(Relief Opening)
Outer Door
Air is drawn in for combustion. Keep area clean and free from combustibles and flammable vapors.
Figure 18
External Inspection & Cleaning of the Base-Ring Filter
1.At least annually check the
2.Follow the Lighting Instructions to turn off the water heater and allow it to cool for 10 minutes before attempting to clean the
3.Use a vacuum cleaner with a hose attachment to remove any dust or debris that may have accumulated on the filter. NOTE: If unable to inspect or clean the
4.After the
Cleaning the Combustion Chamber and Flame-arrestor
1.Follow procedure outlined in “Removing the Manifold/Burner Assembly” (See page 22).
2.Use a vacuum cleaner/shop vac to remove all loose debris in the combustion chamber. Use compressed air to clear any dust or debris that may have accumulated in the
COMBUSTION CHAMBER
FLAME ARRESTOR
DOOR GASKET
FILTER
Figure 19
3.Reassemble following the procedure under “Replacing the Manifold/Burner Assembly” (See page 21).
19