FRAMING AND FINISHING

Installing Support Brackets (Figure 37)

A horizontal pipe support MUST BE used for each 3 feet of horizontal run. The pipe supports should be placed around the pipe and nailed in place to framing members. There MUST BE a 3 inch clearance to combustibles above 8 inch diameter pipe and elbows and 1 inch clearance on both sides and bottom of the 8 inch dia. pipe to combustibles on all horizontal pipe sections and elbows.

Vertical runs of this vent systems must be supported every 4 feet above the appliance flue outlet by wall brackets attached to the 8 inch vent pipe and secured with nails or screws to structural framing members.

Figure 37

Installing Firestops (Figures 38, 39, 40 and 41)

Firestops are required for safety whenever the vent system passes through an interior wall, an exterior wall, or a ceiling. These firestops act as a firebreak heat shield and as a means to insure that minimum clearances are maintained to the vent system.

Horizontal runs in the vent system which pass through either interior or exterior walls, require the use of wall firestops on both sides of the wall through which the vent passes.

Cut a 10-3/8 inch x 12-3/8 inch hole in wall. Position firestop (SD1249) on interior side of wall for 10-3/8 inch x 12-3/8 inch hole.

Attention: Wall firestop hole is off-set towards bottom of wall opening. Secure with nails or screws. Continue the vent run through the firestop (See Figure 38).

12 3/8

WALL FIRESTOP

HOLE IS OFF-SET

TOWARDS BOTTOM

OF WALL OPENING.

Figure 38

Vertical runs of this system which pass through ceilings require the use of ONE (1) ceiling firestop at the hole in each ceiling through which the vent passes.

Position a plumb bob directly over the center of the vertical vent component and mark the ceiling to establish the center point of the vent. Drill a hole or drive a nail through this center point and check the floor above for any obstructions such as wiring or plumbing runs. Reposition the appliance and vent system, if necessary, to accommodate ceiling joists and/or obstructions.

Cut a 10 1/2 inch x 10 1/2 inch hole through the ceiling, using the center point previously marked. Frame the hole with framing lumber the same size as the ceiling joists. (See Figure 39) If the area above the ceiling is NOT an attic, position and secure the ceiling firestop (SD-1263) on the ceiling side of the previously cut and framed hole. (See Figure 40) If the area above the ceiling is an attic, position and secure the firestop on top of the previously framed hole. (See Figure 41)

NOTE: Remove insulation from the framed area in the attic before installing the firestop and/or vent pipes.

17375-6-0705

Page 23

Image 23
Contents Installation Instructions Table of Contents Important Safety Information LP-GAS Warning Odor Safety Information for Users of LP GASIntroduction Fireplace Dimensions SpecificationsClearances Figure Mantel Chart FigureClearances Locating FireplaceChecking Manifold Pressures Installing a New Main Gas CockGAS Supply Converting flue take-off to rear venting Rear Vent ConversionVent Systems Vent Pipe Clearance InstallationFraming and Finishing Finishing Figures 12 Flush Mount Mantel Installation FigureFraming Figure VERTICAL, 90 Elbow with Horizontal Termination Flush Wall InstallationCombustible Surround Installation Vent Runs Figures 14, 15, 16, 17Model VERTICAL, 90 Elbow toExample a Venting Graph Dimensions in FeetVenting Fireplace TOP To Use the Vent Graph FigureVenting Fireplace TOP Below Grade InstallationFireplace Hard Elbow Dimensions Series DVP42FP Examples TOP Vent RUN Theunit Caps Venting Fireplace RearExamples Rear Vent RUN Information on Various Venting Routes and Components Vertical Sidewall InstallationsTermination Clearances Vent Clearances Vent System Identification Installing Vent Components FigureFraming and Finishing Installing Support Brackets FigureInstalling Firestops Figures 38, 39, 40 See Horizontal Termination Page 24 and Vertical Termination Horizontal TerminationDVVK-5F Flex Vent Instructions Determining Minimum Vent Height Above the Roof General MaintenanceInstalling the Vent System in a Chase Vertical TerminationVertical Termination Reassembly and Resealing Vent Pipe SystemLOG Placement 3 LOG SET Pilot Flame Figure Operating InstructionsMillivolt System Initial LightingTRW Standing Pilot Wiring Diagram Standing Pilot Lighting Instructions For Your Safety Read Before LightingGlass soots Standing Pilot TroubleshootingFrequent pilot outage problem Pilot and main burner extinguish while in operationElectrical Connection Figure Intermittent Pilot Operating InstructionsWhat to do if YOU Smell GAS For Your Safety Read Before LightingTrial for Ignition S8600H Intermittent Ignition Module SpecificationsCheckout OperationMain Burner Operation Safety LockoutARC Length Action Ignition System Checks Check ignition cable. Make sureIntermittent Pilot Troubleshooting Thermopiles Transmitter SignalFunctions Receiver Shutdown of BurnerRF Transmitter Functions Wiring Diagram with Blower RF Standing Pilot Lighting Instructions Please Note Maintenance and ServiceParts View Parts List Blower Wheels Blower MotorVolt AC Optional Brick Liner Installation Instructions Junction BOX Wiring Installation InstructionsFBB4 AccessoriesService Notes HOW to Order Repair Parts Service Notes