Empire Comfort Systems DVP42FP7, DVP48FP3 Flush Mount Mantel Installation Figure, Framing Figure

Page 11

INSTALLATION (continued)

Note: For finishing to top of fireplace, refer to Figure 12.

Flush Mount Mantel Installation (Figure 10)

The fireplace must extend 3/4" beyond finished wall surface when using a flush mount mantel. Refer to Figure 10 to locate nailing flanges on fireplace sides. Mark and drill two (2) 1/8" holes into fireplace side to mount each nailing flange. Use eight (8) 1/2" hex-head screws supplied in hardware package to attach nailing flanges to fireplace sides.

NAIL OR OTHER SUITABLE FASTENER

Figure 10

Framing (Figure 11)

Fireplace framing can be built before or after the fireplace is set in place. Framing should be positioned to accommodate wall covering and fireplace facing material. The fireplace framing should be constructed of 2 x 4 lumber or heavier. The framing headers may rest on the fireplace standoffs. Refer to Figure 11 for minimum framing dimensions.

CAUTION: MEASURE FIREPLACE DIMENSIONS AND VERIFY FRAMING METHODS, AND WALL COVERING DETAILS BEFORE FRAMING CONSTRUCTION BEGINS.

Framingdimension"A"includesathreeinchclearance for standoffs on firebox. After installing firebox into framing, the finished wall surface must cover the three inch opening above the firebox.

 

DVP42

DVP48

"A"

37 3/4"

37 3/4"

"B"

43 3/8"

49 3/8"

"C"

19 7/8"

19 7/8"

Figure 11

Attention: If a base or mantel is not used and the appliance is installed directly on carpeting, tile or other combustible material other than wood flooring, it shall be installed on a metal or wood panel extending the full width and depth of the appliance. The vertical dimension in Figure 11 must be adjusted when a metal or wood panel is placed beneath the appliance.

Finishing (Figures 12 and 13)

Finish the walls with the material of your choice. Figure 3 on page 7 shows the minimum vertical and corresponding maximum horizontal dimensions of mantels or other combustible projections above the top front edge of the fireplace.

Only non-combustible materials may be used to cover the black fireplace front.

Warning: When finishing the fireplace never obstruct or modify the air inlet/outlet louvers in any manner. Provide adequate clearances around air openings into the combustion chamber.

Caution: If the joints between the finished wall and the fireplace surround (top and sides) are sealed, a 300°F minimum sealant material must be used. These joints are not required to be sealed. Only non-combustible material (using 300°F minimum adhesive if needed), can be applied as facing to the fireplace surround.

17375-6-0705

Page 11

Image 11
Contents Installation Instructions Table of Contents Important Safety Information LP-GAS Warning Odor Safety Information for Users of LP GASIntroduction Fireplace Dimensions SpecificationsClearances Figure Mantel Chart FigureClearances Locating Fireplace Checking Manifold Pressures Installing a New Main Gas Cock GAS Supply Converting flue take-off to rear venting Rear Vent ConversionVent Systems Vent Pipe Clearance InstallationFraming and Finishing Finishing Figures 12 Flush Mount Mantel Installation FigureFraming Figure VERTICAL, 90 Elbow with Horizontal Termination Flush Wall InstallationCombustible Surround Installation Vent Runs Figures 14, 15, 16, 17Model VERTICAL, 90 Elbow toExample a Venting Graph Dimensions in FeetVenting Fireplace TOP To Use the Vent Graph FigureVenting Fireplace TOP Below Grade InstallationFireplace Hard Elbow Dimensions Series DVP42FP Examples TOP Vent RUN Theunit Caps Venting Fireplace RearExamples Rear Vent RUN Information on Various Venting Routes and Components Vertical Sidewall InstallationsTermination Clearances Vent Clearances Vent System Identification Installing Vent Components FigureFraming and Finishing Installing Support Brackets FigureInstalling Firestops Figures 38, 39, 40 See Horizontal Termination Page 24 and Vertical Termination Horizontal TerminationDVVK-5F Flex Vent Instructions Determining Minimum Vent Height Above the Roof General MaintenanceInstalling the Vent System in a Chase Vertical TerminationVertical Termination Reassembly and Resealing Vent Pipe SystemLOG Placement 3 LOG SET Pilot Flame Figure Operating InstructionsMillivolt System Initial LightingTRW Standing Pilot Wiring Diagram Standing Pilot Lighting Instructions For Your Safety Read Before LightingGlass soots Standing Pilot TroubleshootingFrequent pilot outage problem Pilot and main burner extinguish while in operationElectrical Connection Figure Intermittent Pilot Operating InstructionsWhat to do if YOU Smell GAS For Your Safety Read Before LightingTrial for Ignition S8600H Intermittent Ignition Module SpecificationsCheckout OperationMain Burner Operation Safety LockoutARC Length Action Ignition System Checks Check ignition cable. Make sureIntermittent Pilot Troubleshooting Thermopiles Transmitter SignalFunctions Receiver Shutdown of BurnerRF Transmitter Functions Wiring Diagram with Blower RF Standing Pilot Lighting Instructions Please Note Maintenance and ServiceParts View Parts List Blower Wheels Blower MotorVolt AC Optional Brick Liner Installation Instructions Junction BOX Wiring Installation InstructionsFBB4 AccessoriesService Notes HOW to Order Repair Parts Service Notes