Factory Line Set Installation
1)Route the factory line set (5/8" OD suction line and a 1/2" OD liquid line) from the condensing unit to the icemaker. Factory fabricated line sets are precharged and do not need to be evacuated.
Note: Care should be taken that the icemaker, line set, and remote condenser unit contain the same type of refrigerant prior to making connections. Mixing of refrigerants will result in improper operation and possible damage to the refrigeration system.
2)Attach the refrigerant lines to the appropriate male couplings on the icemaker first and then at the condensing unit. Apply two drops of POE oil to the male threads of the couplings before tightening.
3)Tighten the couplings 1/4 turn beyond fully seated. A backup wrench is recommended.
Field Fabricated Line Set Installation
1)Route a 5/8" OD copper tube suction line and a 1/2" OD copper tube liquid line between the condensing unit and the icemaker.
2)Insulate the two copper tubes separately.
3)Install Parker quick connect couplings on each end.
4)Evacuate through the charging ports on the Parker quick connect couplings and charge with
Note: Care should be taken that the icemaker, line set, and remote condenser unit contain the same type of refrigerant prior to making connections. Mixing of refrigerants will result in improper operation and possible damage to the refrigeration system.
5)Attach the refrigerant lines to the appropriate male couplings on the icemaker first and then at the condensing unit. Apply two drops of POE oil to the male threads of the couplings before tightening.
6)Tighten the couplings 1/4 turn beyond fully seated. A backup wrench is recommended.
Insulation |
5/8" OD |
Suction |
Line |
1/2" OD |
Liquid |
Line |
Condensing Unit
Fig. 5
1/2" OD | Insulation | 5/8" OD |
| ||
Liquid |
| Suction |
Line |
| Line |
Icemaker
17