Section 2 Installation
This section provides instructions for installing the system and
preparing it for operation.
The BioOptix 10 system consists of a BioOptix 10 unit, a
Foxy 200 Fraction Collector, and a Windows PC running
BioOptix 10 software.
WARNING
The system is heavy. Use a two-person lift to prevent injury.

2.1 Unpacking the

BioOptix 10 System

Carefully unpack the shipment and inspect the contents to verify
receipt of all components against the packing list. If there is any
damage to the shipping carton or any components, contact the
shipping agent and Teledyne Isco (or its authorized represen-
tative) immediately.
WARNING
If there is any evidence that the system has been damaged
in shipping, do not plug it into the power line. Contact
Teledyne Isco or its authorized representative for advice.
Compare the contents of the boxes with the enclosed packing slip.
If there are any shortages, contact Teledyne Isco immediately.

2.2 BioOptix 10

Installation

2.2.1 BioOptix 10 Lo cation
and Space
Requirements
The system should be installed on a work surface capable of sup-
porting the system, and buffer, sample, and waste containers.
The system is designed for ambient temperature and cold-room
operation. Refer to Table 1-1 for environmental specifications.
The BioOptix 10 unit requires about 3350 square centimeters
(520 in2) of bench space. Space requirements are shown in Figure
2-1. Space must be left behind the unit for case ventilation and
electrical connections. The left side of the unit should be kept
clear to access the power switch and for fluid connections.
CAUTION
Ensure there is at least 10 cm (4 inches) of air space on its left
side so that the disconnect device (power switch) may be eas-
ily accessed in an emergency.