BioOptix™ 10

Section 2 Installation

2.1Unpacking the BioOptix 10 System

This section provides instructions for installing the system and preparing it for operation.

The BioOptix 10 system consists of a BioOptix 10 unit, a Foxy 200 Fraction Collector, and a Windows PC running BioOptix 10 software.

WARNING

The system is heavy. Use a two-person lift to prevent injury.

Carefully unpack the shipment and inspect the contents to verify receipt of all components against the packing list. If there is any damage to the shipping carton or any components, contact the shipping agent and Teledyne Isco (or its authorized represen- tative) immediately.

WARNING

If there is any evidence that the system has been damaged in shipping, do not plug it into the power line. Contact Teledyne Isco or its authorized representative for advice.

Compare the contents of the boxes with the enclosed packing slip. If there are any shortages, contact Teledyne Isco immediately.

2.2BioOptix 10 Installation

2.2.1BioOptix 10 Location The system should be installed on a work surface capable of sup-

and Space

porting the system, and buffer, sample, and waste containers.

Requirements

The system is designed for ambient temperature and cold-room

 

operation. Refer to Table 1-1 for environmental specifications.

 

The BioOptix 10 unit requires about 3350 square centimeters

 

(520 in2) of bench space. Space requirements are shown in Figure

 

2-1. Space must be left behind the unit for case ventilation and

 

electrical connections. The left side of the unit should be kept

 

clear to access the power switch and for fluid connections.

CAUTION

Ensure there is at least 10 cm (4 inches) of air space on its left side so that the disconnect device (power switch) may be eas- ily accessed in an emergency.

2-1

Page 19
Image 19
Teledyne manual Unpacking the BioOptix 10 System, BioOptix 10 Installation, Space, Requirements