BioOptix™ 10

Appendix B Fluid Path Diagrams

Manual injections do not operate the pump. The system pauses for the operator to turn the Mode valve to the Manual Inject position. The liquid sample is then forced through the injection port on top of the BioOptix 10 system. The liquid sample is intro- duced directly onto the column (Figure B-4).

Manual Sample Injection

Mode

Column

Effluent

To Foxy

Figure B-4 Fluid path for Load-type blocks -

Manual injections

B.3 Gradient-type Blocks Gradient blocks are similar to fluid-type blocks (Figure B-5). The Buffer valve switches between buffers A and B to produce the correct mix.

ChannelMode

Sample

Buffer

Buffer A Buffer B

Column

Pump

Effluent

To Waste

To Foxy

Figure B-5 Fluid path for Gradient-type blocks