BioOptix™ 10
Section 2 Installation
Figure 2-20 BioOptix 10 Manual Hardware Control window
9.In the Columns section of this window, check each channel number that should be primed. Configure the remaining settings to match those shown in Figure
10.Click the Start Pump button. Observe the following for each enabled channel:
❍Buffer B solution movement should be visible at the inlet ports on the left side of the BioOptix 10.
❍After passing through the internal pump and valves, Buffer B solution should be visible at the Pump Purge port.
11.Continue to manually pump Buffer B solution through the system and inspect the tubing connections.
If any connections are leaking, use a wrench to tighten the fitting 1/4 turn, then check again for leaks. Repeat as neces- sary.
If no leaks are found, proceed with step 12.
12.Click the Stop Pump button.
13.Change the %B setting to 0 percent.
14.Click the Start Pump button. Monitor the flow of Buffer A through the system. Correct leaks as needed.
15.Click the Stop Pump button.
16.Click the Done button.
The system is ready for operation (Section 3).