Hoshizaki FS-1022MLH-C service manual Sequence of Operation, Sequence Cycles and Shutdown

Page 12

B. Sequence of Operation

The steps in the sequence are as outlined below. This unit utilizes a control board to switch the icemaker components on and off as needed. When power is supplied, the power switch is in the "ON" position, and the control switch is in the "ICE" position, control board "POWER OK" LED and infrared sensor green LED come on. The "POWER OK" LED remains on constantly. If the infrared sensor yellow LED is on or flashing, move ice away from the infrared sensor lens.

This system utilizes a pump-down solenoid valve in the icemaker and a control

lowpressure switch in the condensing unit to control the operation of the Comp and FMR. This eliminates the need for an electrical connection between the 2 units. When calling for ice, the control board (X1 on control board) energizes the pumpdown solenoid. The low-side refrigerant pressure rises to 29 PSIG, the control lowpressure switch (located in the condensing unit) closes, energizing the Comp and FMR. When the ice level satisfies the infrared sensor bin control (bin full), the unit goes into the shutdown cycle. The control board de-energizes the pumpdown solenoid valve (X1 on CB). The low-side refrigerant pressure drops (unit pumping down). When the low-side pressure drops to 9 PSIG, the control low-pressure switch opens, deenergizing Comp and FMR. Control Low-Pressure Switch Settings: Cut-Out: 9 PSIG. Differential: 20 PSIG.

Cut-In: 29 PSIG.

1. Sequence Cycles and Shutdown

a)Fill Cycle

"WTRIN" LED is on. WV energizes and fill cycle begins. 90-second low water safety timer starts. When UF/S closes, WV deenergizes, and 90-second low water safety timer resets. 30-second GM delay timer starts. If 90-second low water safety timer terminates before UF/S closes, WV remains energized, and a 1-beep alarm sounds.

b)Ice Purge Cycle

"GM" LED is on. 30-second GM delay timer terminates. GMR (X2 on CB), GM, GMPR, and EH energize. 5-minute ice purge timer starts: GM runs for 5 minutes to clear any ice from the evaporator. To bypass, press the "SERVICE" button on CB after GM starts.

WARNING! Risk of electric shock. Care should be taken not to touch live terminals. Note: UF/S must be closed before GMR will energize.

c)Freeze Cycle

"COMP" and "GM" LEDs are on. 5-minute ice purge timer terminates. GMR (X2 on CB), GM, GMPR, and EH continue. CR (X1 on CB) and PDS energize. When CLPS (in SRC) closes, MC energizes, allowing Comp and FMR to energize. CCH de-energizes. As water in the evaporator cools, ice starts forming within 4 to 6 minutes. This time frame depends on the inlet water and ambient temperature conditions. UF/S and LF/S operate WV as needed to continue the ice making process. This continues until IS activates allowing CB to de-energize X1 on CB and PDS. The unit goes into pump-down, CLPS opens, MC deenergizes, deenergizing Comp and FMR. CCH energizes.

12

Image 12
Contents SRC-10H Hoshizaki AMERICA, INC Contents Page Important Safety Information Serious injuryIndicates important information about the use and care UnitFor SRC Specifications Icemaker FS-1022MLH-CCondensing Unit SRC-10HII. General Information Construction Icemaker FS-1022MLH-CCondensing Unit a SRC-10H Icemaking Unit Sequence of Operation Sequence Cycles and ShutdownDrain Cycle Shutdown Cycle Control Board Sequence Flow Chart FS-1022MLH-C/SRC-10H Sequence Flow ChartControl Board Control Board Layout Control BoardLED Lights and Audible Alarm Safeties No. of Beeps Type of Alarm Reset Options Every 5 secSequence Step Energized Components Min MaxControls and Adjustments S1 Dip Switch Setting Infrared Sensor Shutdown DelaySeconds 1.6 minutes Factory Default S1 Dip Switch Setting Drain Timer Interval S1 Dip Switch Setting Dispense TimeS1 Dip Switch Mechanical BackupShutdown Delay Bin ControlIII Wiring Diagrams Control Low-Pressure Switch Safety Low-Pressure Switch Manual ResetHigh-Pressure Switch Performance Data FS-1022MLH-C with SRC-10HIV. Service Diagnosis Diagnostic ProcedureIce Production Check Page Page Page Control Board Check 5VDC Page Bin Control Check Infrared Sensor CheckMechanical Backup Bin Control Check Page Float Switch Check and Cleaning Float Switch CheckFloat Switch Cleaning Page Diagnostic Charts No Ice ProductionNo Ice Production Possible Cause Startup No Ice Production Possible Cause Shutdown Removal and Replacement of Components Service for Refrigerant LinesRefrigerant Recovery BrazingEvacuation and Recharge R-404A Important Notes for Component Replacement Evaporator Assembly Components. See FigComponent Evaporator Assembly Removal and Replacement of Cutter Upper Bearing Wear CheckRemoval and Replacement of Extruding Head Removal and Replacement of AugerRemoval and Replacement of Evaporator Page 6b. Lower Housing Removal and Replacement of Gear MotorPage VI. Cleaning and Maintenance Cleaning and Sanitizing InstructionsCleaning Solution Cleaning ProcedureFloat Switch Assembly Reservoir Cover Sanitizing Solution Sanitizing Procedure InitialSanitizing Procedure Final Maintenance Maintenance Schedule Frequency Area TaskPreparing the Icemaker for Long Storage Remove the water from the icemaker water supply lineDrain the evaporator