"F-A" Control Board Sequence Flow Chart

FS-1022MLH-C/SRC-10H

2.

1. Startup

Power Switch "ON" Control Switch in "ICE" POWER OK LED on IS Green LED on

IS Yellow LED off

4. 1-in-12 Drain Cycle - Although the factory default 1-in-1 drain cycle

1.Fill Cycle is recommended, a 1-in-12 drain cycle is available. For 1-in-12 drain

 

If Fill > 90 sec.

cycle sequence, see "3. 1-in-12 Hour Drain Cycle & Restart (optional)."

 

 

 

 

 

 

 

 

 

 

 

 

FT 1-beep alarm

 

 

 

 

 

 

 

 

 

 

 

sounds.

 

 

 

 

 

 

 

 

 

 

 

When UF/S

2. Ice Purge Cycle

 

 

 

 

 

 

 

 

 

 

closes alarm

 

3. Freeze Cycle

 

To bypass, press the

1-in-1 drain cycle. DV opens for 2 seconds every

 

resets and

 

"SERVICE" button

hour (S1 Dip Switch 4).

 

 

 

2. Ice Purge

 

 

 

Refill

 

after GM starts.

Icemaker status

 

Cycle starts.

 

 

 

 

 

 

 

 

 

does not change.

FT Maximum

 

Maximum

30 sec.

5 minutes

90 seconds

 

 

 

 

90 seconds

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

FT terminates

 

 

 

 

 

 

 

 

 

 

 

(90 sec.)

Low Water Safety

When UF/S closes,

 

 

 

90 sec. FT exceeded

alarm resets and

1-beep alarm sounds

2. Ice Purge Cycle

90 sec. PT begins

starts.

90 seconds

 

 

 

 

 

 

 

 

 

FT

PT

terminates

 

exceeded

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Sequence Flow Chart

15

WV energizes

FT starts (90 sec.)

LF/S closed

EH energizes

PDS energizes

UF/S open

LF/S closed

UF/S open

UF/S closed

GM energizes

CLPS closes

LF/S open

UF/S closed

FT exceeded

FT terminates

 

Comp energizes

FT starts (90 sec.)

FT terminates

1-beep alarm sounds

WV de-energizes

 

FMR energizes

WV energizes

WV de-energizes

PDS de-energizes

 

 

EH continues

Comp continues

Comp continues

CLPS opens

 

 

GM continues

EH continues

EH continues

Comp de-energizes

 

 

 

FMR continues

FMR continues

FMR de-energizes

 

 

 

GM continues

GM continues

EH continues

 

 

 

PDS continues

PDS continues

GM continues

 

 

 

 

 

WV continues

1-beep alarm continues WV continues

EH de-energizes

GM de-energizes

2. Infrared Sensor Shutdown & Restart

 

Note: If IS fails to shutdown the

 

 

 

1. Bin Full

 

 

 

 

 

 

2. Ice Purge Cycle

 

3. Icemaker Off

 

 

 

4. Icemaker Restart

 

icemaker, MBC opens and a

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

9-beep alarm sounds.

 

 

 

IS delay determined by S1 dip switch

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

1, 2, 3

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

IS Green LED on

 

 

 

 

 

IS Green LED on

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

IS Green LED on

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

IS Yellow LED off

 

 

 

 

 

 

 

IS Yellow LED (flashing or steady)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

IS Yellow LED off

 

 

 

 

 

 

 

 

 

5 minutes

 

 

 

 

 

 

 

 

 

3. 1-in-12 Drain Cycle

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

to "2. Ice Purge Cycle" above

 

 

 

 

1. DT Initiates DC

 

 

 

 

 

 

2. Ice Purge Cycle

 

3. 10-Minute

 

 

 

4. Icemaker Restart

 

& Restart (optional)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Drain

 

 

 

 

 

 

to "1. Fill Cycle" above

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

(S1 dip switch 4)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

IS activated or DC starts

DV energizes (DC only) 10-min. DT terminates (DC only)

 

 

 

 

 

 

 

 

 

 

 

 

 

PDS de-energizes

GM de-energizes

DV de-energizes (DC only)

 

Legend:

 

 

 

 

 

 

 

 

 

CLPS-control low-pressure switch

LF/S-lower float switch

CLPS opens

 

 

 

 

 

1-in-12 DT reset (DC only)

 

Comp-compressor

MBC-mechanical backup

Comp de-energizes

 

 

 

 

 

 

 

 

 

 

 

 

 

DC-drain cycle

 

 

 

 

bin control

FMR de-energizes

 

 

 

 

 

 

 

 

 

 

 

 

 

DT-drain timer

PDS-pump-down solenoid valve

GM continues

 

 

 

 

 

 

 

 

 

 

 

 

 

DV-drain valve

PT-purge timer

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

EH-evaporator heater

UF/S-upper float switch

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

FMR-fan motor-remote

WV-water valve

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

FT-fill timer (low water safety)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

GM-gear motor

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

IS-infrared sensor bin control

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Image 15
Contents SRC-10H Hoshizaki AMERICA, INC Contents Page Unit Important Safety InformationSerious injury Indicates important information about the use and careFor SRC FS-1022MLH-C Specifications IcemakerSRC-10H Condensing UnitIcemaker FS-1022MLH-C II. General Information ConstructionCondensing Unit a SRC-10H Icemaking Unit Sequence Cycles and Shutdown Sequence of OperationDrain Cycle Shutdown Cycle Sequence Flow Chart Control Board Sequence Flow Chart FS-1022MLH-C/SRC-10HControl Board Control Board Control Board LayoutEnergized Components Min Max LED Lights and Audible Alarm SafetiesNo. of Beeps Type of Alarm Reset Options Every 5 sec Sequence StepControls and Adjustments S1 Dip Switch Setting Infrared Sensor Shutdown DelaySeconds 1.6 minutes Factory Default S1 Dip Switch Setting Dispense Time S1 Dip Switch Setting Drain Timer IntervalBin Control S1 Dip Switch MechanicalBackup Shutdown DelayIII Wiring Diagrams Control Low-Pressure Switch Safety Low-Pressure Switch Manual ResetHigh-Pressure Switch FS-1022MLH-C with SRC-10H Performance DataIV. Service Diagnosis Diagnostic ProcedureIce Production Check Page Page Page Control Board Check 5VDC Page Infrared Sensor Check Bin Control CheckMechanical Backup Bin Control Check Page Float Switch Check and Cleaning Float Switch CheckFloat Switch Cleaning Page Diagnostic Charts No Ice ProductionNo Ice Production Possible Cause Startup No Ice Production Possible Cause Shutdown Service for Refrigerant Lines Removal and Replacement of ComponentsRefrigerant Recovery BrazingEvacuation and Recharge R-404A Important Notes for Component Replacement Evaporator Assembly Components. See FigComponent Evaporator Assembly Upper Bearing Wear Check Removal and Replacement of CutterRemoval and Replacement of Auger Removal and Replacement of Extruding HeadRemoval and Replacement of Evaporator Page Removal and Replacement of Gear Motor 6b. Lower HousingPage Cleaning Procedure VI. Cleaning and MaintenanceCleaning and Sanitizing Instructions Cleaning SolutionFloat Switch Assembly Reservoir Cover Sanitizing Procedure Initial Sanitizing SolutionSanitizing Procedure Final Maintenance Frequency Area Task Maintenance SchedulePreparing the Icemaker for Long Storage Remove the water from the icemaker water supply lineDrain the evaporator