6)Make sure the "GM" LED is on. There is a delay of at least 30 seconds before the "GM" LED turns on after powerup. After the "GM" LED turns on, press the "SERVICE" button located on CB to bypass the 5-minute ice purge cycle. WARNING! Risk of electric shock. Care should be taken not to touch live terminals. The "COMP" LED turns on.

7)Press the actuator paddle located in the top of the chute.

S1 dip switch 7 in the "ON" position: Comp and GM deenergizes within 10 seconds

and CB sounds a 9beep alarm. S1 dip switch 7 in the "OFF" position: Comp and

GM deenergize within 10 seconds. Diagnosis: If MBC does not open or the icemaker continues to make ice, check that the actuator paddle is moving freely. Confirm that the actuator paddle is engaged. Check for continuity across MBC wires. If MBC contacts are found open and the icemaker continues to make ice, CB is bad and must be replaced. If MBC is closed with the actuator paddle engaged, MBC is bad and must be replaced.

8)Move the power switch to the "OFF" position, then unplug the unit from the electrical outlet.

9)Replace the chute assembly and strap in their correct positions.

10)Replace the control box cover and top panel in their correct positions.

11)Plug the unit into the electrical outlet.

12)Move the power switch to the "ON" position to start the automatic icemaking process.

13)Replace the front panel in its correct position.

Legend: CB–control board; Comp–compressor; GM–gear motor; IS–infrared sensor; MBC–mechanical backup bin control

35

Image 35
Contents SRC-10H Hoshizaki AMERICA, INC Contents Page Unit Important Safety InformationSerious injury Indicates important information about the use and careFor SRC FS-1022MLH-C Specifications IcemakerSRC-10H Condensing UnitIcemaker FS-1022MLH-C II. General Information ConstructionCondensing Unit a SRC-10H Icemaking Unit Sequence Cycles and Shutdown Sequence of OperationDrain Cycle Shutdown Cycle Sequence Flow Chart Control Board Sequence Flow Chart FS-1022MLH-C/SRC-10HControl Board Control Board Control Board LayoutEnergized Components Min Max LED Lights and Audible Alarm SafetiesNo. of Beeps Type of Alarm Reset Options Every 5 sec Sequence StepSeconds 1.6 minutes Factory Default Controls and AdjustmentsS1 Dip Switch Setting Infrared Sensor Shutdown Delay S1 Dip Switch Setting Dispense Time S1 Dip Switch Setting Drain Timer IntervalBin Control S1 Dip Switch MechanicalBackup Shutdown DelayIII Wiring Diagrams High-Pressure Switch Control Low-Pressure SwitchSafety Low-Pressure Switch Manual Reset FS-1022MLH-C with SRC-10H Performance DataIce Production Check IV. Service DiagnosisDiagnostic Procedure Page Page Page Control Board Check 5VDC Page Infrared Sensor Check Bin Control CheckMechanical Backup Bin Control Check Page Float Switch Cleaning Float Switch Check and CleaningFloat Switch Check Page No Ice Production Possible Cause Startup Diagnostic ChartsNo Ice Production No Ice Production Possible Cause Shutdown Service for Refrigerant Lines Removal and Replacement of ComponentsEvacuation and Recharge R-404A Refrigerant RecoveryBrazing Component Important Notes for Component ReplacementEvaporator Assembly Components. See Fig Evaporator Assembly Upper Bearing Wear Check Removal and Replacement of CutterRemoval and Replacement of Auger Removal and Replacement of Extruding HeadRemoval and Replacement of Evaporator Page Removal and Replacement of Gear Motor 6b. Lower HousingPage Cleaning Procedure VI. Cleaning and MaintenanceCleaning and Sanitizing Instructions Cleaning SolutionFloat Switch Assembly Reservoir Cover Sanitizing Procedure Initial Sanitizing SolutionSanitizing Procedure Final Maintenance Frequency Area Task Maintenance ScheduleDrain the evaporator Preparing the Icemaker for Long StorageRemove the water from the icemaker water supply line