6 Gas Information
A. Gas Pressure Requirements | B. Gas Connection |
Pressure requirements for
Two taps are provided on the right hand side of the gas control for a test gauge connection to measure the inlet and outlet pressures. See Section 10: Maintaining and Servicing the Appliance.
The stove and its individual
If the stove must be isolated from the gas supply piping system by closing an individual
WARNING
Fire Risk
Explosion Risk
High pressure will damage valve.
•Disconnect gas supply piping BEFORE pressure testing gas line at test pressures above 60 mbar.
•Close the manual shutoff valve BEFORE pressure testing gas line at test pressures equal to or less than 60 mbar.
Note: Have the gas supply line installed in accordance with local building codes by a qualified installer approved and/or licensed as required by the locality.
Note: Before the first firing of the stove, the gas supply line should be purged of any trapped air.
Note: Consult local building regulations to properly size the gas supply line leading to the (Rp 1/2 in.)
Incoming gas line should be piped into the valve compartment and connected to the ISO
Leak test all gas line points and the gas control valve prior to and after starting the gas stove.
WARNING
CHECK FOR GAS LEAKS
Fire Risk
Explosion Risk
Asphyxiation Risk
•Check all fittings and connections.
•Do not use open flame.
•After the gas line installation is complete, all connections must be tightened and checked for leaks with a commercially available,
Fittings and connections may have loosened during shipping and handling.
Table 1
| Natural Gas | Propane | Butane | Natural Gas |
| (G20) | (G31) | (G30) | (G25) |
|
|
|
|
|
Inlet Pressure | 20mbar | 37 or 50mbar | 30 or 50mbar | 25mbar |
|
|
|
|
|
Manifold Pressure | ||||
|
|
|
|
|
Gas Rate | .72 m3/h | .26 m3/h | .10 m3/h | .67 m3/h |
Max.Input (NETCV) | 6.9 kW | 6.6 kW | 5.8 kW | 5.5 kW |
|
|
|
|
|
Burner Injector | DMS 39 | DMS 53 | DMS 55 | DMS 39 |
|
|
|
|
|
Pilot Injector | 51 | 30 | 30 | 51 |
|
|
|
|
|
22 | Heat & Glo • |