Hearth and Home Technologies VRT-GR-B-CE, VRTIKL-CE, VRT-GY-P-CE manual FIG. B Minimum Clearance

Page 18

FIG. A 90 DEGREE ELBOW

USE HEAT SHIELD / WALL THIMBLE

Place mark where protrudes through

exterior wall to cut off excess.

90O ELBOW

CENTER LINE

PIPE

LENGTH

TRIM

RING

PIPE LENGTH

FIG. B MINIMUM CLEARANCE

MINIMUM OF 152 mm

OF PIPE THROUGH THE WALL

INTERIOR WALL

51mm clearance WALL THIMBLE from rear of stove

CENTER LINE

HEAT SHIELD OVER

TOP HALF OF PIPE

TRIM RING

Figure 5.18

18

Heat & Glo • VRTIKL-CE7031-292 Rev E • 12/07

Image 18
Contents What to do if you smell gas Do not Discard this ManualDo Discardnot Test Lab Report No Manufactured Date Serial No Model NameTable of Contents Non-Combustible Materials 1Listing and Code ApprovalsAppliance Certification Combustible MaterialsDesign & Installation Considerations Getting StartedInspect Appliance & Components Clearances to Combustibles 3Appliance Location and ClearancesSelecting Appliance Location 15.2 25.7 30.8 137.2 91.4 78.1 33.7 39.4Optional Stone Surround Installed 10.2 78.1 91.44Termination Locations Flue Termination Minimum ClearancesAlcove Applications Gas stoveUse of Elbows Flue InformationFlue Components Measuring StandardsFlueing Diagrams For Natural, Propane and Butane GasesNatural Gas One 90 0 Elbow System Natural Gas Two 90 0 Elbows System Min H1 Max H1 + H2 Max Natural Gas Two 900 Elbows System V1 Min Max Natural Gas Three 90 0 Elbows System Horizontal Termination StepSlim Line Wall Thimble Before YOU BeginFIG. B Minimum Clearance Vertical Termination Balance Flue PipeSecure Flashing with NON-HARDENING Sealant Roofing Nails Vertical Flue Restrictor Twist-lock the flue cap and sealGas Information Gas Pressure Requirements Gas ConnectionCheck for GAS Leaks Ignition System Wiring 7Electrical InformationShock Risk Unbolting Appliance from the Pallet Appliance SetupRemove Shipping Materials Leveling and Bolting Down the ApplianceAccessories Top to Rear Flue ConversionOn TOP of Appliance Installing the Baffle On Back of AppliancePositioning the Logs Placing Mineral WoolCap and Barrel Fastener System Operating Instructions Before Lighting ApplianceLighting the Appliance Do not Connect 240 VAC to the Control ValveFrequently Asked Questions Initial Break-in ProcedureAfter Appliance is Lit Maintaining and Servicing Appliance After servicingMaintenance Tasks Inspect Maintenance TasksTroubleshooting Symptom Possible Causes Corrective ActionsElectronic Ignition System Appliance Dimension Diagram Reference Materials47.9 104.5 103.5 40.3 18.1 76.2 73.3 86.7 Appliance Dimension with Stone Surround Diagram 75.3 62.0 76.8 42.8 86.7 112.6Flue Components Diagram SL-09D SL-12/17D SL-24D SL-36D SL-48DFlue Components List ComponentsTermination Kits Service Parts Log Set AssemblyDescription Serial # Part Number P2B/B2P-VRT-CEValve Assembly REM-DLX-CE Heat & GLO Limited 10 Year Warranty Warranty PolicyYour Records for Model Contact Information