Hearth and Home Technologies VRT-BZ-P-CE, VRTIKL-CE Positioning the Logs, Placing Mineral Wool

Page 27

G. Positioning the Logs

While still breakable, the logs do not become fragile until after the gas stove is burned and they have cured. After curing, any handling must be done with care as breakage can easily occur.

PLEASE NOTE: Logs have been designed to work spe- cifically with the burner of this gas stove. Exact place- ment will ensure proper operation of your gas stove.

Figure 8.12

Figure 8.13

Place log #1 into the cradle in the burner. Lean the log back towards right corner of firebox.

Figure 8.14

Locate log #2 over the pin in log #1 and into notch in log #1. Lean the log back toward the left corner of the firebox.

H. Placing Mineral Wool

WARNING

Explosion Risk.

Follow ember placement instructions in manual.

Do NOT place embers directly over burner ports.

Replace ember material annually.

Improperly placed embers interferes with proper burner operation.

Figure 8.17

Apply 1.5 cm size pieces sparingly along ports as shown in Figure 8.17. Do not block ports.

Heat & Glo • VRTIKL-CE7031-292 Rev E • 12/07

27

Image 27
Contents What to do if you smell gas Do not Discard this ManualDo Discardnot Serial No Model Name Test Lab Report No Manufactured DateTable of Contents Combustible Materials 1Listing and Code ApprovalsAppliance Certification Non-Combustible MaterialsDesign & Installation Considerations Getting StartedInspect Appliance & Components 15.2 25.7 30.8 137.2 91.4 78.1 33.7 39.4 3Appliance Location and ClearancesSelecting Appliance Location Clearances to Combustibles10.2 78.1 91.4 Optional Stone Surround InstalledFlue Termination Minimum Clearances 4Termination LocationsGas stove Alcove ApplicationsMeasuring Standards Flue InformationFlue Components Use of ElbowsFor Natural, Propane and Butane Gases Flueing DiagramsNatural Gas One 90 0 Elbow System Natural Gas Two 90 0 Elbows System Min H1 Max H1 + H2 Max Natural Gas Two 900 Elbows System V1 Min Max Natural Gas Three 90 0 Elbows System Step Horizontal TerminationBefore YOU Begin Slim Line Wall ThimbleFIG. B Minimum Clearance Balance Flue Pipe Vertical TerminationSecure Flashing with NON-HARDENING Sealant Roofing Nails Twist-lock the flue cap and seal Vertical Flue RestrictorGas Information Gas Pressure Requirements Gas ConnectionCheck for GAS Leaks Ignition System Wiring 7Electrical InformationShock Risk Leveling and Bolting Down the Appliance Appliance SetupRemove Shipping Materials Unbolting Appliance from the PalletAccessories Top to Rear Flue ConversionOn TOP of Appliance On Back of Appliance Installing the BafflePlacing Mineral Wool Positioning the LogsCap and Barrel Fastener System Before Lighting Appliance Operating InstructionsDo not Connect 240 VAC to the Control Valve Lighting the ApplianceFrequently Asked Questions Initial Break-in ProcedureAfter Appliance is Lit After servicing Maintaining and Servicing ApplianceInspect Maintenance Tasks Maintenance TasksTroubleshooting Symptom Possible Causes Corrective ActionsElectronic Ignition System Appliance Dimension Diagram Reference Materials47.9 104.5 103.5 40.3 18.1 76.2 73.3 86.7 75.3 62.0 76.8 42.8 86.7 112.6 Appliance Dimension with Stone Surround DiagramSL-09D SL-12/17D SL-24D SL-36D SL-48D Flue Components DiagramFlue Components List ComponentsTermination Kits Log Set Assembly Service PartsP2B/B2P-VRT-CE Description Serial # Part NumberValve Assembly REM-DLX-CE Warranty Policy Heat & GLO Limited 10 Year WarrantyContact Information Your Records for Model