Hearth and Home Technologies VRT-BZ-P-CE manual Optional Stone Surround Installed, 10.2 78.1 91.4

Page 7

C. Optional Stone Surround Installed

 

B

C

 

 

 

 

 

 

 

 

 

 

D

A

 

 

 

A

 

A

B

C

D

Centimeters

8.3

10.2

78.1

91.4

Figure 3.1

 

 

 

 

WARNING

Fire Risk.

Odor Risk.

Tipping Risk

Install gas stove on a stable, level platform/ floor strong enough to support gas stove without tipping.

USE wood flooring, ceramic tile, brick hearth or high pressure laminate flooring applied directly over the sub-flooring material.

Heat & Glo • VRTIKL-CE7031-292 Rev E • 12/07

7

Image 7
Contents Do not Discard this Manual What to do if you smell gasDo Discardnot Serial No Model Name Test Lab Report No Manufactured DateTable of Contents Combustible Materials 1Listing and Code ApprovalsAppliance Certification Non-Combustible MaterialsGetting Started Design & Installation ConsiderationsInspect Appliance & Components 15.2 25.7 30.8 137.2 91.4 78.1 33.7 39.4 3Appliance Location and ClearancesSelecting Appliance Location Clearances to Combustibles10.2 78.1 91.4 Optional Stone Surround InstalledFlue Termination Minimum Clearances 4Termination LocationsGas stove Alcove ApplicationsMeasuring Standards Flue InformationFlue Components Use of ElbowsFor Natural, Propane and Butane Gases Flueing DiagramsNatural Gas One 90 0 Elbow System Natural Gas Two 90 0 Elbows System Min H1 Max H1 + H2 Max Natural Gas Two 900 Elbows System V1 Min Max Natural Gas Three 90 0 Elbows System Step Horizontal TerminationBefore YOU Begin Slim Line Wall ThimbleFIG. B Minimum Clearance Balance Flue Pipe Vertical TerminationSecure Flashing with NON-HARDENING Sealant Roofing Nails Twist-lock the flue cap and seal Vertical Flue RestrictorGas Pressure Requirements Gas Connection Gas InformationCheck for GAS Leaks 7Electrical Information Ignition System WiringShock Risk Leveling and Bolting Down the Appliance Appliance SetupRemove Shipping Materials Unbolting Appliance from the PalletTop to Rear Flue Conversion AccessoriesOn TOP of Appliance On Back of Appliance Installing the BafflePlacing Mineral Wool Positioning the LogsCap and Barrel Fastener System Before Lighting Appliance Operating InstructionsDo not Connect 240 VAC to the Control Valve Lighting the ApplianceInitial Break-in Procedure Frequently Asked QuestionsAfter Appliance is Lit After servicing Maintaining and Servicing ApplianceInspect Maintenance Tasks Maintenance TasksSymptom Possible Causes Corrective Actions TroubleshootingElectronic Ignition System Reference Materials Appliance Dimension Diagram47.9 104.5 103.5 40.3 18.1 76.2 73.3 86.7 75.3 62.0 76.8 42.8 86.7 112.6 Appliance Dimension with Stone Surround DiagramSL-09D SL-12/17D SL-24D SL-36D SL-48D Flue Components DiagramComponents Flue Components ListTermination Kits Log Set Assembly Service PartsP2B/B2P-VRT-CE Description Serial # Part NumberValve Assembly REM-DLX-CE Warranty Policy Heat & GLO Limited 10 Year WarrantyContact Information Your Records for Model