Hearth and Home Technologies VRT-GY-B-CE, VRTIKL-CE Natural Gas Two 900 Elbows System V1 Min Max

Page 14

V2

V1

H

Figure 5.8

Natural Gas • Two 900 Elbows System

V1 Min.

 

H Max.

31 cm

 

93 cm

61 cm

 

1.8 M

91 cm

 

2.7 M

1.2 M

 

3.6 M

1.5 M

 

4.5 M

V1+V2+H = Max 11.4M

H Max = 4.5M

Propane • Two 900 Elbows System

V1 Min.

 

H Max.

31 cm

 

62 cm

61 cm

 

1.2 M

91 cm

 

1.8 M

1.2 M

 

2.4 M

1.5 M

 

3.0 M

V1+V2+H = Max 11.4M

H Max = 3.0M

Butane • Two 900 Elbows System

V1 Min.

 

H Max.

31 cm

 

31 cm

61 cm

 

61 cm

92 cm

 

92 cm

1.2 M

 

1.2 M

1.5 M

 

1.5 M

V1+V2+H = Max 10 M

H Max = 1.0 M

Natural Gas • Two 900 Elbows System

 

V Min.

H1+H2 Max.

 

61 cm

1.6 M

 

91 cm

2.4 M

H2

1.2 M

3.2 M

 

1.5 M

4.0 M

H1

V+H1+H2 = Max 11.4M

H1+H2 = Max 4.0M

Propane • Two 900 Elbows System

 

V Min.

H1+H2 Max.

 

61 cm

1.0 M

 

91 cm

1.5 M

V

1.2 M

2.0 M

 

1.5 M

2.6 M

 

V+H1+H2 = Max 11.4M

H1+H2 = Max 2.6M

 

Butane • Two 900 Elbows System

 

V1 Min.

H1+H2 Max.

 

61 cm

42 cm

 

92 cm

64 cm

 

1.2 M

.8 M

 

1.5 M

1.0 M

 

V+H1+H2 = Max 10 M

H1+H2 = Max 1.5 M

 

Figure 5.9

 

 

14

 

Heat & Glo • VRTIKL-CE7031-292 Rev E • 12/07

Image 14
Contents Do Discardnot What to do if you smell gasDo not Discard this Manual Test Lab Report No Manufactured Date Serial No Model NameTable of Contents Non-Combustible Materials 1Listing and Code ApprovalsAppliance Certification Combustible MaterialsInspect Appliance & Components Design & Installation ConsiderationsGetting Started Clearances to Combustibles 3Appliance Location and ClearancesSelecting Appliance Location 15.2 25.7 30.8 137.2 91.4 78.1 33.7 39.4Optional Stone Surround Installed 10.2 78.1 91.44Termination Locations Flue Termination Minimum ClearancesAlcove Applications Gas stoveUse of Elbows Flue InformationFlue Components Measuring StandardsFlueing Diagrams For Natural, Propane and Butane GasesNatural Gas One 90 0 Elbow System Natural Gas Two 90 0 Elbows System Min H1 Max H1 + H2 Max Natural Gas Two 900 Elbows System V1 Min Max Natural Gas Three 90 0 Elbows System Horizontal Termination StepSlim Line Wall Thimble Before YOU BeginFIG. B Minimum Clearance Vertical Termination Balance Flue PipeSecure Flashing with NON-HARDENING Sealant Roofing Nails Vertical Flue Restrictor Twist-lock the flue cap and sealCheck for GAS Leaks Gas InformationGas Pressure Requirements Gas Connection Shock Risk Ignition System Wiring7Electrical Information Unbolting Appliance from the Pallet Appliance SetupRemove Shipping Materials Leveling and Bolting Down the ApplianceOn TOP of Appliance AccessoriesTop to Rear Flue Conversion Installing the Baffle On Back of AppliancePositioning the Logs Placing Mineral WoolCap and Barrel Fastener System Operating Instructions Before Lighting ApplianceLighting the Appliance Do not Connect 240 VAC to the Control ValveAfter Appliance is Lit Frequently Asked QuestionsInitial Break-in Procedure Maintaining and Servicing Appliance After servicingMaintenance Tasks Inspect Maintenance TasksElectronic Ignition System TroubleshootingSymptom Possible Causes Corrective Actions 47.9 104.5 103.5 40.3 18.1 76.2 73.3 86.7 Appliance Dimension DiagramReference Materials Appliance Dimension with Stone Surround Diagram 75.3 62.0 76.8 42.8 86.7 112.6Flue Components Diagram SL-09D SL-12/17D SL-24D SL-36D SL-48DTermination Kits Flue Components ListComponents Service Parts Log Set AssemblyDescription Serial # Part Number P2B/B2P-VRT-CEValve Assembly REM-DLX-CE Heat & GLO Limited 10 Year Warranty Warranty PolicyYour Records for Model Contact Information