Hearth and Home Technologies VRT-GY-P-CE, VRTIKL-CE, VRT-GY-N-CE, VRT-BZ-B-CE manual Valve Assembly

Page 41

Service Parts

VRTIKL-CE

Valve Assembly Parts List

Beginning Manufacturing Date: June 2006

 

Ending Manufacturing Date: Active

 

1

Valve Assembly

2

 

3

 

4

 

5

7

13

 

6

8

 

 

12

 

11

 

10

 

9

IMPORTANT THIS IS DATED INFORMATION: When requesting service or replacement parts for your appliance please provide model number and serial number. All parts listed in this manual may be ordered from an authorized dealer.

ITEM

DESCRIPTION

SERIAL #

PART NUMBER

1

Log Bracket

 

7031-282

2

Pilot Assembly N

 

2098-050

Pilot Assembly P/B

 

2098-051

 

 

3

Pilot Bracket

 

2123-140

4

Burner Support

 

7031-279

 

Orifice N (#39C)

 

582-839

5

Orifice P (#53C)

 

582-853

 

Orifice B ( #55C)

 

582-855

6

Valve Bracket

Pre Sept 2007

7031-278

Post Sept 2007

2111-186

 

 

7

Burner N

 

7031-056

Burner P/B

 

7031-057

 

 

8

Burner Shelf

 

2123-126

9

Switch Assembly, Maxitrol

 

2098-145

10

Valve N

 

2098-130

Valve P/B

 

2098-131

 

 

11

Thermocouple Block

 

2098-146

12

Flex Ball Valve Assembly

 

2098-302A

13

Flex Gas Connector

 

383-302A

Additional service part numbers appear on following page.

Heat & Glo • VRTIKL-CE7031-292 Rev E • 12/07

41

Image 41
Contents Do Discardnot What to do if you smell gasDo not Discard this Manual Serial No Model Name Test Lab Report No Manufactured DateTable of Contents Appliance Certification 1Listing and Code ApprovalsNon-Combustible Materials Combustible MaterialsInspect Appliance & Components Design & Installation ConsiderationsGetting Started Selecting Appliance Location 3Appliance Location and ClearancesClearances to Combustibles 15.2 25.7 30.8 137.2 91.4 78.1 33.7 39.410.2 78.1 91.4 Optional Stone Surround InstalledFlue Termination Minimum Clearances 4Termination LocationsGas stove Alcove ApplicationsFlue Components Flue InformationUse of Elbows Measuring StandardsFor Natural, Propane and Butane Gases Flueing DiagramsNatural Gas One 90 0 Elbow System Natural Gas Two 90 0 Elbows System Min H1 Max H1 + H2 Max Natural Gas Two 900 Elbows System V1 Min Max Natural Gas Three 90 0 Elbows System Step Horizontal TerminationBefore YOU Begin Slim Line Wall ThimbleFIG. B Minimum Clearance Balance Flue Pipe Vertical TerminationSecure Flashing with NON-HARDENING Sealant Roofing Nails Twist-lock the flue cap and seal Vertical Flue RestrictorCheck for GAS Leaks Gas InformationGas Pressure Requirements Gas Connection Shock Risk Ignition System Wiring7Electrical Information Remove Shipping Materials Appliance SetupUnbolting Appliance from the Pallet Leveling and Bolting Down the ApplianceOn TOP of Appliance AccessoriesTop to Rear Flue Conversion On Back of Appliance Installing the BafflePlacing Mineral Wool Positioning the LogsCap and Barrel Fastener System Before Lighting Appliance Operating InstructionsDo not Connect 240 VAC to the Control Valve Lighting the ApplianceAfter Appliance is Lit Frequently Asked QuestionsInitial Break-in Procedure After servicing Maintaining and Servicing ApplianceInspect Maintenance Tasks Maintenance TasksElectronic Ignition System TroubleshootingSymptom Possible Causes Corrective Actions 47.9 104.5 103.5 40.3 18.1 76.2 73.3 86.7 Appliance Dimension DiagramReference Materials 75.3 62.0 76.8 42.8 86.7 112.6 Appliance Dimension with Stone Surround DiagramSL-09D SL-12/17D SL-24D SL-36D SL-48D Flue Components DiagramTermination Kits Flue Components ListComponents Log Set Assembly Service PartsP2B/B2P-VRT-CE Description Serial # Part NumberValve Assembly REM-DLX-CE Warranty Policy Heat & GLO Limited 10 Year WarrantyContact Information Your Records for Model