Hearth and Home Technologies VRT-GY-B-CE, VRTIKL-CE Appliance Setup, Remove Shipping Materials

Page 24

8 Appliance Setup

A. Remove Shipping Materials

Remove shipping materials from inside or underneath the firebox.

The gas line is shipped inside back panel. To access the gas line remove the top plate from the gas stove. Remove and retain the two Allen head screws that hold the back panel in place. Replace panel when finished.

ALLEN HEAD SCREWS

Figure 8.1

B. Unbolting Appliance from the Pallet

The gas stove is bolted and screwed to the pallet for ship- ping. Use a 1/2 in. socket to remove the bolt in center of bottom plate. Use a Phillips screwdriver to remove the two screws in the front of the bottom plate and the two screws holding the metal strap across the back of the gas stove. Refer to Figure 8.2 for locations.

C. Leveling and Bolting Down the Appliance

SECURING THE GAS STOVE

IS REQUIRED.

WARNING

Tipping Risk

Install gas stove on a stable, level platform/ floor strong enough to support gas stove without tipping.

USE wood flooring, ceramic tile, brick hearth

or high pressure laminate flooring applied directly over the sub-flooring material.

LEVELING

SCREWS

LAG BOLT

HOLE

Figure 8.2

Figure 8.3

 

After unbolting the gas stove from the pallet, insert two 1/4

 

20 x 1-1/2 (or equivalent) counterscrews.

 

Using pliers, adjust the counterscrews to level the gas

 

stove.

24

Heat & Glo • VRTIKL-CE7031-292 Rev E • 12/07

Image 24
Contents What to do if you smell gas Do not Discard this ManualDo Discardnot Test Lab Report No Manufactured Date Serial No Model NameTable of Contents 1Listing and Code Approvals Appliance CertificationNon-Combustible Materials Combustible MaterialsDesign & Installation Considerations Getting StartedInspect Appliance & Components 3Appliance Location and Clearances Selecting Appliance LocationClearances to Combustibles 15.2 25.7 30.8 137.2 91.4 78.1 33.7 39.4Optional Stone Surround Installed 10.2 78.1 91.44Termination Locations Flue Termination Minimum ClearancesAlcove Applications Gas stoveFlue Information Flue ComponentsUse of Elbows Measuring StandardsFlueing Diagrams For Natural, Propane and Butane GasesNatural Gas One 90 0 Elbow System Natural Gas Two 90 0 Elbows System Min H1 Max H1 + H2 Max Natural Gas Two 900 Elbows System V1 Min Max Natural Gas Three 90 0 Elbows System Horizontal Termination StepSlim Line Wall Thimble Before YOU BeginFIG. B Minimum Clearance Vertical Termination Balance Flue PipeSecure Flashing with NON-HARDENING Sealant Roofing Nails Vertical Flue Restrictor Twist-lock the flue cap and sealGas Information Gas Pressure Requirements Gas ConnectionCheck for GAS Leaks Ignition System Wiring 7Electrical InformationShock Risk Appliance Setup Remove Shipping MaterialsUnbolting Appliance from the Pallet Leveling and Bolting Down the ApplianceAccessories Top to Rear Flue ConversionOn TOP of Appliance Installing the Baffle On Back of AppliancePositioning the Logs Placing Mineral WoolCap and Barrel Fastener System Operating Instructions Before Lighting ApplianceLighting the Appliance Do not Connect 240 VAC to the Control ValveFrequently Asked Questions Initial Break-in ProcedureAfter Appliance is Lit Maintaining and Servicing Appliance After servicingMaintenance Tasks Inspect Maintenance TasksTroubleshooting Symptom Possible Causes Corrective ActionsElectronic Ignition System Appliance Dimension Diagram Reference Materials47.9 104.5 103.5 40.3 18.1 76.2 73.3 86.7 Appliance Dimension with Stone Surround Diagram 75.3 62.0 76.8 42.8 86.7 112.6Flue Components Diagram SL-09D SL-12/17D SL-24D SL-36D SL-48DFlue Components List ComponentsTermination Kits Service Parts Log Set AssemblyDescription Serial # Part Number P2B/B2P-VRT-CEValve Assembly REM-DLX-CE Heat & GLO Limited 10 Year Warranty Warranty PolicyYour Records for Model Contact Information