8 Appliance Setup
A. Remove Shipping Materials
Remove shipping materials from inside or underneath the firebox.
The gas line is shipped inside back panel. To access the gas line remove the top plate from the gas stove. Remove and retain the two Allen head screws that hold the back panel in place. Replace panel when finished.
ALLEN HEAD SCREWS
Figure 8.1
B. Unbolting Appliance from the Pallet
The gas stove is bolted and screwed to the pallet for ship- ping. Use a 1/2 in. socket to remove the bolt in center of bottom plate. Use a Phillips screwdriver to remove the two screws in the front of the bottom plate and the two screws holding the metal strap across the back of the gas stove. Refer to Figure 8.2 for locations.
C. Leveling and Bolting Down the Appliance
SECURING THE GAS STOVE
IS REQUIRED.
WARNING
Tipping Risk
•Install gas stove on a stable, level platform/ floor strong enough to support gas stove without tipping.
•USE wood flooring, ceramic tile, brick hearth
or high pressure laminate flooring applied directly over the
LEVELING
SCREWS
LAG BOLT
HOLE
Figure 8.2 | Figure 8.3 |
| After unbolting the gas stove from the pallet, insert two 1/4 |
| 20 x |
| Using pliers, adjust the counterscrews to level the gas |
| stove. |
24 | Heat & Glo • |