Xantrex Technology PV-30208 Section Preventative Maintenance Periodic Maintenance

Page 30

SECTION 6

PREVENTATIVE MAINTENANCE

PERIODIC MAINTENANCE

Xantrex Technology recommends that the following preventative maintenance be carried out on the PV-30208:

Monthly intervals or as required:

Aluminum Extrusion Heatsink

Accumulation of dirt and debris on the aluminum extrusion heatsink and fan shroud will de- crease the ability to transfer heat, which can cause the PV-30208 to shutdown on over-tempera- ture alarms. Inspect the aluminum extrusion heatsink and fan shroud for accumulation of dirt and debris. Remove enclosure panels and clean if debris is present.

Fan Operation

Verify proper operation of the heatsink cooling fan, located within the lower enclosure. The fan operates when the K1 contactor is closed. Remove any debris from the fan and finger guard.

Six month intervals:

(See Isolation Procedure and perform prior to the following)

Enclosure Seals

Inspect the enclosure access panel seal. If damaged, replace with equivalent closed cell foam gasket. Call your Xantrex Technology distributor for factory replacements or specifications.

Electrical Connections

Inspect the condition of all wiring within the PV-30208. Inspect all wire crimps and connec- tions for damage caused from high temperature. Check for corrosion. Replace any damaged wires. Verify all mechanical connections are sufficiently tightened. Verify all conduction sur- faces are clean and free of corrosion.

Mechanical electrical connections will loosen over time. This is caused primarily by thermal cycling during normal operation. As connections loosen, electrical impedance will increase at the connection, eventually leading to fire and component damage. It is critical to check all electrical connections every six months.

Enclosure

Access the enclosure and remove any accumulated dirt and debris. Vacuum enclosure whenever dust or dirt is present.

ISOLATION PROCEDURE

The following procedure should be followed to de-energize the PV-30208 for maintenance:

DOCUMENT: 151315

PV-30208 Photovoltaic Inverter

6-1

Operation and Maintenance Manual

 

 

Copyright 2003, Xantrex Technology Inc.

Image 30
Contents South Vasco Road Copyright 2003, Xantrex Technology IncTable of Contents Section Product Description Introduction Major ComponentsMain Enclosure Matrix Bus Board Section Product DescriptionInterconnection Standards Compliance Solar Control Unit SCUSection Product Description Specifications Equipment SymbolSection Safety Safety Features Enclosure Front Access PanelPV Ground Fault Detection Section Safety Isolation Procedure Anti Island ProtectionTorque and Wire Gauge Specifications Utility Side Isolation Transformer RequirementsInstallation Section Installation and Initial TURN-ONInstallation Instructions Floor MountedSection Installation and Initial TURN-ON Ground Fault Detection Phase-SequencingArray Grounding Section Installation and Initial TURN-ON Wiring Diagram Optional Box Frame Optional PV Conductor PV Array Ground JumperPV-30208 Inverter Visual Inspection, Isolation Transformer WYE/WYE Visual Inspection, PV Array WiringInitial Power Visual Inspection, PV-30208Fine Tuning System VerificationSection Operation Description of System Operation OverviewOperating States Section Operation Operation Features Diagram Of Monopolar Configuration Section OperationBlock DC Overvoltage Detection Peak Power TrackingCurrent Imbalance Detection Automatic Wake Up PV Voltage OptimizationSection Operation Operator Interface System Fault System Sleep Test System Stop System Shutdown Example of Normal System OperationSection Operation System Operating Parameters User Factory Password Parameter Description Section Operation Section Troubleshooting General Fault ConditionsFault Descriptions IPM Device Fault 0x0001 ThroughAC Line Voltage High Fault Section TroubleshootingAC Line Voltage Low Fault AC Line Under Frequency FaultDC Bus Over Voltage Fault AC Line Over Frequency FaultGround Current Fault CT Offset FaultCurrent Imbalance Fault Stop Switch FaultSection Preventative Maintenance Periodic Maintenance Section Preventative Maintenance TURN-ON ProcedureSection Drawings and Parts List Drawings List Warranty and CertificationsOptional Accessories Page Page Page Page Page Enclosure, Upper Page Xantrex PV Series Limited Warranty and Registration