SECTION 3
INSTALLATION AND INITIAL TURN-ON
The following table shows acceptable wire gauges to be connected to the
Wire Gauge Table
Termination | Wire Range AWG |
|
|
Distribution Block (AC) | |
|
|
Distribution Block (DC) | |
|
|
INSTALLATION INSTRUCTIONS
CAUTION
All wiring methods shall be in accordance with the National Electrical Code ANSI/ NFPA 70. All power conductors interfacing to the
Ventilation Considerations
Check with applicable installation standards for additional clearance requirements.
Installation
The
Floor Mounted
1.Move the
2.Anchor the lower enclosure feet to the floor with 1/2” anchor bolts.
Wall Mounted
1.Screw two 3/8” x
2.Place the
3.Hold the unit against the wall and install the upper lag bolts (3/8” x
4.Tighten the lower lag bolts while the unit is held in place.
5.Two access panels on the lower enclosure are provided for cable entry, shown in Figure
6.Local building codes may require additional support/reinforcement when wall mounting the PV- 30208. Check with local authorities for further detail.
DOCUMENT: 151315PV-30208 Photovoltaic Inverter3-2
Operation and Maintenance Manual
Copyright 2003, Xantrex Technology Inc.