Casablanca Fan Company
C31UxxZ
owner manual
Automatic Demonstration Program, ++++
Troubleshooting
Specification
Install
Warranty
Pins
Adaptor Assembly
changing frequency setting
In the wall bezel replacement
Safety
Operation Power
Page 30
Page 29
Page 31
Image 30
Page 29
Page 31
Contents
C31UxxZ
PN C3143001-AT0209
Holliston
O W N E R ’ S M A N U A L
Proof of Purchase
LIMITED WARRANTY
THIS WARRANTY SUPERSEDES ALL HollistonPREVIOUS WARRANTIES
Read and Save These Instructions
CONTENTS
Holliston
PN C3143001 AT0608
Holliston
SERIAL No. DJ06
MODEL # C31UxxZ
TYPE
Parts Guide
7-Watt Incandescent
Uplight Bulbs
Switch Housing Cap
Blade Iron Screws pre-installed, see pg 13, step 9a
Adaptor Assembly
Switch Housing Cap Screws 8-32 x 3/8
Introduction Before You Start
For best performance and for your warranty to be valid
use only genuine Casablanca blades, light fixtures, and accessories
Safe Use
MOUNTING RECOMMENDATIONS General Guidelines
sloped ceiling installations
When to Use Extension Poles
Calculation of Ceiling Angle
Installing a New Ceiling Fixture Outlet Box
Fan Installation Getting Started
Ceiling plate Installation
Using Existing Ceiling Fixture Outlet Box
Lag Screw Installation
Canopy Installation
CANOPY LOCK WASHERS CANOPY SCREWS
Fan Preparation
IMPORTANT SAFETY INFORMATION
Prepare for fan installation as follows
Figure #1 Figure #2
Fan Preparation - continued
Figure #4
Figure #5
Hanging the Fan
LIGHTBULB INSTALLATION uplight
Install Lightbulbs
Figure #6
Canopy Hatch and cover ring Installation
Canopy Electrical Connections
Figure #2
Blade Installation
Blade Installation
Attach Blade Irons
Blade screws must be tightened securely
LIGHT FIXTURE Installation optional
Blade Installation Continued
before operating the fan
switch housing and end cap Installation
NO LIGHT KIT - Installation
Light Kit Adaptor Disassembly
Switch Housing and Light Kit Adaptor Installation - NO LIGHT KIT
Adaptor Installation NO LIGHT KIT - END
Switch Housing and Light Kit
Adaptor Installation - Continued NO LIGHT KIT
SCREW Figure #6
LIGHT KIT - Installation
Switch Housing and Light Kit
Adaptor Installation - Continued LIGHT KIT
Figure #9
Figure #12
Figure #10
Figure #11
Figure #14
Figure #15
Figure #16
Figure #17
W-84 Wall control Preparation
W-84 WALL CONTROL INSTALLATION
Prepare for W-84 Wall Control Bezel replacement as follows
For use on product with BOTH UP and DOWN LIGHTS ONLY
RUBBER KEY PAD
Prepare for W-84 Wall Control installation - Continued
PINS
ALMOND
w-84 Control INSTALLATION Installing the W-84 Wall Control
single W-84 Installation
W-84 Wall Control
dual W-84 Installation
DIP SWITCHES
NEUTRAL
Operation Speed Control
Operation Power
Make sure where you are in the sequence to the right
Operation Reversing Airflow
To dim just the down light
changing frequency setting
To dim just the up light
NOTE All fans leave the factory set to “1111”
Operation Safe-Exit and light-minder Program
Automatic Demonstration Program
++++
To enter the demonstration program
Operation Home-Safe Program
Operation Fan-Minder Program
+ + +
In the wall bezel replacement
W-84 Wall Control Bezel replacement CONTINUED
BEZEL BEZEL TABS BEZEL ALIGNMENT PIN AND HOLE
ALMOND COLORED BEZEL
ALMOND WALL PLATE SCREWS ALMOND COLORED WALL PLATE
Troubleshooting tips
Weight
Product Specifications
Dimensions
Care Recommendations
Holliston
Related pages
What customer support options are available for KitchenAid products? Check our
support page
.
Top
Page
Image
Contents