Alamo 7191852C manual Hydraulic Hoses, Replacing Shaft Seals, Hose Replacement, Hose Warranty

Page 107

MAINTENANCE

Replacing Shaft Seals

1.The double shaft seal assembly must be assembled with the 7 MM. wide single lip seal fitted first with the 1 MM. thick lip support washer on top.

2.The back of the double lip seal should be filled with a light grease before fitting with the wiper lip outermost.

3.The seal kit, Part No. 86-99-166 is a universal Cassapa motor sealkit. It may contain more seals than are necessary; care must be taken in selecting the correct seal to use.

HYDRAULIC HOSES

The condition of all hoses should be carefully checked during routine service of the machine. Hoses that have been chafed or damaged on their outer casing should be securely wrapped with waterproof adhesive tape to stop the metal braid from rusting. Hoses that have

suffered damage to the metal braid should be changed at the earliest opportunity.

Hose Replacement

1.Replace one hose at a time to avoid the risk of wrong connections.

2.When the hose is screwed to an additional fitting or union, use a second spanner on the union to avoid breaking seals.

3.Do not use jointing compound on the threads.

4.Avoid twisting the hose. Adjust the hose line to ensure freedom from rubbing or trapping before tightening hose end connections.

5.Before changing hoses, study the installation. These should be positioned so that their worm drive barrels are opposed at 180 degrees to reduce the possibility of air entering the system.

Hose Warranty

Warranty is limited to replacement of hoses which have failed due to faulty materials or manufacture. Warranty will not be considered on hoses that have suffered damage by abrasions, cuts or being pinched or trapped while in work. Neither will a claim be considered where a hose end has been damaged by a blow or where the threads or unions have been damaged by overtightening.

PA91 03/09

Maintenance Section 5-9

© 2009 Alamo Group Inc.

MAINTENANCE

Image 107
Contents PA91 To the Owner/Operator/Dealer Page Alamo Industrial Division is willing to provide Table of Contents Maintenance Section Cables Hydraulic Rams Page Safety Section Safety Wait a minute...Save a life Operator Safety Instructions and PracticesSafety Equipment Operation Safety Instructions and Practices Safety Safety Safety SGM-06 Safety Stop Mowing if Passersby are Within 100 Yards Unless Transporting Safety Instructions and Practices Safety Maintenance and Service Safety Instructions and Practices Safety Concluding Safety Instructions and Practices Decal Location QTY Level Description Decal Description Safety Safety Safety PA91 03/09 Safety Section Safety Safety Alamo Industrial Logo Alamo Name Logo Federal Laws and Regulations Page Introduction Section Introduction Introduction Before Operating this Machine Assembly Section Tractor Selection Fitting Operator Guard Tractor PreparationJohn Deere Conversion KIT 81- 30 Ballast WeightSi Model DeliveryAttachment to Tractor Ti Model Assembly Fitting Control Unit in CAB Gearbox OIL RequirementsTank PA91 Si Running UP ProcedurePA91 Ti Storage Removal from TractorProper Torque Values for Fasteners Operation Section Operation Head Specifications Standard SpecificationsPersonal Protective Equipment PPE Operator RequirementsOperator Thrown Object Protection Tractor RequirementsRops and Seat Belt Tractor Lighting and SMV Emblem Tractor Ballast Tractor Safety DevicesTractor Horsepower Hydraulics Front End Weight3-Point Hitch Getting on and OFF the Tractor Power Take Off PTODismounting the Tractor Boarding the TractorStarting the Tractor Connecting Mower Head Hydraulics Connecting Attaching Head to the BoomPA91 02/08 Operation Section Tractor Pre-Operation Inspection/Service PRE-OPERATION Inspection and ServiceBoom Unit Pre-Operation Inspection and Service OPS-B- 0023E Hydraulic PUMP/OIL Reservoir Flail Head Inspection Do not Operate an Unsafe Tractor or Mower Tractor PRE-OPERATION Inspection Engaging Drive Operating the Boom MowerMachine Controls Operating Speed Wire TrapForward Speed Tractor PositionUpward Cutting Hedge Cutting ProcedureReversing Rotation Si Only Lift Float Kit Optional Flail Types Machine ConfigurationDriving the Tractor and Implement Starting the Tractor Brake and Differential Lock Setting Transport Position Driving the Tractor and Boom Operating Instructions Operating the Tractor and ImplementSGM-08 Foreign Debris Hazards Bystanders/Passersby PrecautionsEngaging the Power Take Off PTO Operating the Mower Operating Speed and Ground SpeedSGM-08 Shutting Down the Attached Head TRACTOR, BOOM, and Attached Head Storage Transporting on Public Roadways Transporting the Tractor and ImplementOperation Operation Hauling the Tractor and Implement Trouble Possible Cause Possible Remedy Troubleshooting GuideOperation Operation Maintenance Section General LubricationOil Supply Filtration MaintenanceHydraulic System Float KIT Accumulator TestFlailhead Hydraulic PumpsReplacing Damaged or Worn Spool O Rings Cable Operated Armhead Control ValveNon-Return Valve CablesMain Relief Valve Reach Ram Ram Seal Replacement General InformationHydraulic Rams Angling ArmRelief Valve Rotor Control VALVE/RELIEF ValveO. Gearbox Hydraulic MotorReplacing Shaft Seals Hose ReplacementHose Warranty Hydraulic HosesALAMO-INDUSTRIAL To the OWNER/OPERATOR/DEALER PA91-SOM-02/08 7191852C Printed U.S.A