Alamo 7191852C Hydraulic System, Float KIT Accumulator Test, Oil Supply, Filtration Maintenance

Page 101

MAINTENANCE

HYDRAULIC SYSTEM

Oil Supply

Check the oil level in the reservoir daily. The first oil change should take place the first 250 hours of operation and every 500 hours or every 12 months thereafter. Although the oil does not wear out, it does eventually break down through contamination, oxidation and condensation. Continual operation of the machine beyond its rated capacity to almost the stall point of the rotor can cause overheating which produces insoluble gums, sludge, varnish and acids. Overheated oil thins to give a sluggish performance and causes earlier failure of seals and “O” rings. Burnt and scorched oil odors and the oil darkening and thickening are all signs of oxidation and indicate the oil should be changed.

Moisture which results from condensation can become entrapped in the oil and cannot be removed by filtration so that contamination is a progressive factor.

Contamination can be reduced by:

1.Carrying all hydraulic servicing in clean, dust-free surrounding.

2.Cleaning off around the reservoir cap before removal, and keeping that area clean.

3.Using clean containers when replenishing the system.

4.Regular servicing of the filtration system.

Filtration Maintenance

The machine is protected by a 125 micron suction strainer and a low pressure 10 micron full flow return line filter.

1.Suction Strainer

The strainer is fixed in position within the reservoir. Should indications of pump cavitation or spongy intermittent operation occur the tank must be drained and flushed out with a suitable cleaning agent, e.g. clean diesel oil.

2.Return Line Filter

The element should be changed after the first 50 hours and thereafter at 400 hour intervals or every 12 months. It is important to note hours worked as if the filter becomes blocked. An internal by-pass within the canister will operate and no symptoms of filter malfunction will occur to jog your memory.

FLOAT KIT ACCUMULATOR TEST

If a leak of Nitrogen is suspected, a test with soapy water around the valve thread and core area should be carried out. A replacement charge valve assembly can be fitted after the accumulator has been fully discharged. It is essential that this work is carried out by the dealer or distributor who must have the facilities for recharging. The accumulator can be removed for this purpose. If oil is leaking from the area of the charge valve then the internal butyl bag is damaged and the accumulator is scrap.

PA91 03/09

Maintenance Section 5-3

© 2009 Alamo Group Inc.

MAINTENANCE

Image 101
Contents PA91 To the Owner/Operator/Dealer Page Alamo Industrial Division is willing to provide Table of Contents Maintenance Section Cables Hydraulic Rams Page Safety Section Safety Wait a minute...Save a life Operator Safety Instructions and PracticesSafety Equipment Operation Safety Instructions and Practices Safety Safety Safety SGM-06 Safety Stop Mowing if Passersby are Within 100 Yards Unless Transporting Safety Instructions and Practices Safety Maintenance and Service Safety Instructions and Practices Safety Concluding Safety Instructions and Practices Decal Location QTY Level Description Decal Description Safety Safety Safety PA91 03/09 Safety Section Safety Safety Alamo Industrial Logo Alamo Name Logo Federal Laws and Regulations Page Introduction Section Introduction Introduction Before Operating this Machine Assembly Section Tractor Selection Fitting Operator Guard Tractor PreparationJohn Deere Conversion KIT 81- 30 Ballast WeightSi Model DeliveryAttachment to Tractor Ti Model Assembly Fitting Control Unit in CAB Gearbox OIL RequirementsTank PA91 Si Running UP ProcedurePA91 Ti Storage Removal from TractorProper Torque Values for Fasteners Operation Section Operation Head Specifications Standard SpecificationsPersonal Protective Equipment PPE Operator RequirementsOperator Thrown Object Protection Tractor RequirementsRops and Seat Belt Tractor Lighting and SMV Emblem Tractor Ballast Tractor Safety DevicesTractor Horsepower Hydraulics Front End Weight3-Point Hitch Getting on and OFF the Tractor Power Take Off PTODismounting the Tractor Boarding the TractorStarting the Tractor Connecting Mower Head Hydraulics Connecting Attaching Head to the BoomPA91 02/08 Operation Section Tractor Pre-Operation Inspection/Service PRE-OPERATION Inspection and ServiceBoom Unit Pre-Operation Inspection and Service OPS-B- 0023E Hydraulic PUMP/OIL Reservoir Flail Head Inspection Do not Operate an Unsafe Tractor or Mower Tractor PRE-OPERATION Inspection Engaging Drive Operating the Boom MowerMachine Controls Forward Speed Wire TrapTractor Position Operating SpeedUpward Cutting Hedge Cutting ProcedureReversing Rotation Si Only Lift Float Kit Optional Flail Types Machine ConfigurationDriving the Tractor and Implement Starting the Tractor Brake and Differential Lock Setting Transport Position Driving the Tractor and Boom Operating Instructions Operating the Tractor and ImplementSGM-08 Foreign Debris Hazards Bystanders/Passersby PrecautionsEngaging the Power Take Off PTO Operating the Mower Operating Speed and Ground SpeedSGM-08 Shutting Down the Attached Head TRACTOR, BOOM, and Attached Head Storage Transporting on Public Roadways Transporting the Tractor and ImplementOperation Operation Hauling the Tractor and Implement Trouble Possible Cause Possible Remedy Troubleshooting GuideOperation Operation Maintenance Section General LubricationHydraulic System Filtration MaintenanceFloat KIT Accumulator Test Oil SupplyFlailhead Hydraulic PumpsReplacing Damaged or Worn Spool O Rings Cable Operated Armhead Control ValveNon-Return Valve CablesMain Relief Valve Hydraulic Rams Ram Seal Replacement General InformationAngling Arm Reach RamO. Gearbox Rotor Control VALVE/RELIEF ValveHydraulic Motor Relief ValveHose Warranty Hose ReplacementHydraulic Hoses Replacing Shaft SealsALAMO-INDUSTRIAL To the OWNER/OPERATOR/DEALER PA91-SOM-02/08 7191852C Printed U.S.A