Alamo 7191852C manual Engaging the Power Take Off PTO

Page 87

OPERATION

Rotary Mowers are capable under adverse conditions of throwing objects for great distances (300 feet or more) and causing serious injury

or death. Follow safety messages carefully.

STOP MOWING IF PASSERSBY ARE WITHIN 100 YARDS UNLESS:

-Front and Rear Deflectors, Chain Guards, or Bands are installed and in good, workable condition;

-Mower sections or Wings are running close to and parallel to the ground without exposed Blades;

-Passersby are outside the existing thrown-object zone;

-All areas have been thoroughly inspected and all foreign material such as rocks, cans, glass, and general debris has been removed.

NOTE: Where there are grass and weeds high enough to hide debris that could be struck

by the blades, the area should be: inspected and large debris removed, mowed at an intermediate height, inspected, closely with any remaining debris being removed, and mowed again at desired final height. (This will also reduce power required to mow, reduce wear and tear on the Mower drivetrain, spread cut material better, reduce streaking, and make the final cut more uniform). (SRM-01)

9.4 Engaging the Power Take Off (PTO)

Before engaging the PTO, make certain that the area is clear of bystanders and passersby. The implement must be completely lowered and the deck positioned at a safe operating height. NEVER engage the PTO with the implement in the raised position.

Set the tractor engine speed at approximately 1,000 RPM before engaging the PTO. Shift the PTO control to the on position, and slowly increase the engine speed until the PTO is operating at the rated speed. If you hear unusual noises or see or feel abnormal vibrations, disengage the PTO immediately. Inspect the implement to determine the cause of the noise or vibration and repair the abnormality. OPS-U- 0027

Do not put hands or feet under mower decks. Blade Contact can result in serious injury or even death. Stay away until all motion has stopped and the decks are securely blocked up. (SGM-09)

PA91 02/08

Operation Section 4-35

© 2009 Alamo Group Inc.

OPERATION

Image 87
Contents PA91 To the Owner/Operator/Dealer Page Alamo Industrial Division is willing to provide Table of Contents Maintenance Section Cables Hydraulic Rams Page Safety Section Safety Wait a minute...Save a life Operator Safety Instructions and PracticesSafety Equipment Operation Safety Instructions and Practices Safety Safety Safety SGM-06 Safety Stop Mowing if Passersby are Within 100 Yards Unless Transporting Safety Instructions and Practices Safety Maintenance and Service Safety Instructions and Practices Safety Concluding Safety Instructions and Practices Decal Location QTY Level Description Decal Description Safety Safety Safety PA91 03/09 Safety Section Safety Safety Alamo Industrial Logo Alamo Name Logo Federal Laws and Regulations Page Introduction Section Introduction Introduction Before Operating this Machine Assembly Section Tractor Selection Fitting Operator Guard Tractor PreparationJohn Deere Conversion KIT 81- 30 Ballast WeightDelivery Attachment to TractorSi Model Ti Model Assembly Fitting Control Unit in CAB OIL Requirements TankGearbox Running UP Procedure PA91 TiPA91 Si Storage Removal from TractorProper Torque Values for Fasteners Operation Section Operation Head Specifications Standard SpecificationsPersonal Protective Equipment PPE Operator RequirementsTractor Requirements Rops and Seat BeltOperator Thrown Object Protection Tractor Lighting and SMV Emblem Tractor Safety Devices Tractor HorsepowerTractor Ballast Front End Weight 3-Point HitchHydraulics Getting on and OFF the Tractor Power Take Off PTODismounting the Tractor Boarding the TractorStarting the Tractor Connecting Mower Head Hydraulics Connecting Attaching Head to the BoomPA91 02/08 Operation Section Tractor Pre-Operation Inspection/Service PRE-OPERATION Inspection and ServiceBoom Unit Pre-Operation Inspection and Service OPS-B- 0023E Hydraulic PUMP/OIL Reservoir Flail Head Inspection Do not Operate an Unsafe Tractor or Mower Tractor PRE-OPERATION Inspection Operating the Boom Mower Machine ControlsEngaging Drive Operating Speed Wire TrapForward Speed Tractor PositionUpward Cutting Hedge Cutting ProcedureReversing Rotation Si Only Lift Float Kit Optional Flail Types Machine ConfigurationDriving the Tractor and Implement Starting the Tractor Brake and Differential Lock Setting Transport Position Driving the Tractor and Boom Operating Instructions Operating the Tractor and ImplementSGM-08 Foreign Debris Hazards Bystanders/Passersby PrecautionsEngaging the Power Take Off PTO Operating the Mower Operating Speed and Ground SpeedSGM-08 Shutting Down the Attached Head TRACTOR, BOOM, and Attached Head Storage Transporting on Public Roadways Transporting the Tractor and ImplementOperation Operation Hauling the Tractor and Implement Trouble Possible Cause Possible Remedy Troubleshooting GuideOperation Operation Maintenance Section General LubricationOil Supply Filtration MaintenanceHydraulic System Float KIT Accumulator TestFlailhead Hydraulic PumpsReplacing Damaged or Worn Spool O Rings Cable Operated Armhead Control ValveCables Main Relief ValveNon-Return Valve Reach Ram Ram Seal Replacement General InformationHydraulic Rams Angling ArmRelief Valve Rotor Control VALVE/RELIEF ValveO. Gearbox Hydraulic MotorReplacing Shaft Seals Hose ReplacementHose Warranty Hydraulic HosesALAMO-INDUSTRIAL To the OWNER/OPERATOR/DEALER PA91-SOM-02/08 7191852C Printed U.S.A