Additional Equipment

Installation

Additional Equipment

Required Equipment

PC running RedHat Linux 6.2 or greater software. This software is

used to support the Security Switch 6200 Graphical User Interface (GUI) and for hosting the Check Point™ FireWall-1®Management Server.

PC running WinNT4/Win2K software. This software is used for launching the Check Point FireWall-1 GUI and the system’s embedded

WEB GUI.

Security applications licenses to activate installed software on the system.

To install the chassis in a standard rack you need certain hand tools, appropriate cabling, and additional hardware not included in the chassis shipment.

Tools

To install the chassis into a standard rack you need, as a minimum, a Phillips screwdriver (9” minimum, #2).

Cables

Cabling requirements are installation-specific. Prior to installation you should know:

The kind and number of cables required for each type of interface.

The distance limitations for each signal type. Table 2-1:provides the approximate cable distance limitations.

Table 2-1: Cable Distance Limitations

Cable Description

Distance Limitation

Craft port: RS-232 DB9 directly

15 meters maximum

from the system

(50 feet maximum)

 

 

Management Link port: 10/100

Cat 5 cable, 100 meters (328 feet)

 

 

Copper Ethernet Link Port: 10/100/

Cat 5 cable, 100 meters (328 feet)

1000

 

 

 

Fiber Ethernet Link Port: Gigabit

62.5 micro-fiber - 275 meters

 

(902 feet)

 

50 micro-fiber - 550 meters

 

(1805 feet)

 

 

Table 2-2:shows the cables that ship with chassis.

 

Table 2-2: System Cables

 

 

Cable

Description

Power Cabling

Standard AC power cable.

 

 

Console Port

Serial shielded straight-through 9-pin D-sub female to 9-

 

pin male cable.

 

 

2-4

3COM Security Switch 6200 Hardware and Software Users Guide

Page 16
Image 16
3Com 6200 manual Additional Equipment Required Equipment, Tools, Cables, 1 Cable Distance Limitations, Cable Description