3Com 6200 manual Installation, Terminal or PC, 2 Front Rack Mounting the Chassis

Models: 6200

1 78
Download 78 pages 59.42 Kb
Page 17
Image 17
Terminal or PC

Installation

Terminal or PC

A VT-100 terminal or a Personal Computer (PC) is required during installation. The terminal or PC is connected to the chassis’s craft port, allowing you to monitor start-up diagnostics and to configure the unit for remote management access.

Chassis Rack The chassis can be installed in the front or center of a standard 19” rack.

Installation

Front Rack Mounting

To install the chassis in the front of your rack:

1.Remove the center brackets (one on each side) from the system.

2.Position the chassis in the rack by aligning the holes on its integrated front mounting brackets with the holes in the rack.

3.Insert the appropriate screws through the brackets and tighten. If the rack holes are not threaded, use cage-nuts over them. Figure 2-2shows a chassis installation example.

2

 

4

 

6

 

8

10/100

1

 

3

10

5

12

7

14

 

16

 

9

 

11

 

13

15 Installation

17

FIBER

10/100/1000

 

 

PACKETLINK

18

FIBER

 

 

PACKET

 

LINK

PWR

CONSOLE

 

(max)

 

MGMT1

 

9800,8,N,1

MGMT2

 

SYS

 

 

HDD

Front

Mounting

Bracket

Front Rack MountingRear

Mounting

Bracket

Figure 2-2 Front Rack Mounting the Chassis

3COM Security Switch 6200 Hardware and Software Users Guide

2-5

Page 17
Image 17
3Com 6200 manual Installation, Terminal or PC, 2 Front Rack Mounting the Chassis